Premier Mounts PBC-FCTA Installation Manual

Page 1
INSTALLATION INSTRUCTIONS
Suspended Ceiling Adapter
3130 East Miraloma Avenue
Anaheim, CA 92806 USA
USA and Canada
Phone: 1.800.368.9700
Fax: 1.800.832.4888
Other Locations
Phone: (001).714.632.7100
Fax: (001).714.632.1044
PP-FCTA
EUROPE
Unit 3, The Moorings Business Park
Channel Way, Longford
Conventry, CV6 6RH,
Phone: +44 (0) 2476 644105
Fax: +44 (0) 2476 644165
9530-302-001-0A
Page 2
PP-FCTA
Contents
Weight Limit. .................................................................................................................................................................... 2
Warning Statements. ....................................................................................................................................................... 2
Installation Tools. ............................................................................................................................................................. 3
Parts List.......................................................................................................................................................................... 3
Features. ......................................................................................................................................................................... 4
PP-FCTA Installation. ...................................................................................................................................................... 5
Mounting the PP-FCTA. ............................................................................................................................................ 5
Securing the Ceiling Plate. ........................................................................................................................................ 6
Electrical Box Cut-out Removal. ............................................................................................................................... 6
Ceiling Attachment. ................................................................................................................................................... 7
Securing the 1 ½˝ NPT Pipe to the PP-FCTA. .......................................................................................................... 8
Securing the Camera (optional). ............................................................................................................................... 9
Technical Specications. ............................................................................................................................................... 10
Disclaimer. ......................................................................................................................................................................11
Weight Limit
THE CEILING STRUCTURE MUST BE CAPABLE OF
Maximum Projector Weight:
50 lbs.
SUPPORTING AT LEAST FIVE TIMES THE WEIGHT OF THE PROJECTOR. IF NOT, THE CEILING STRUCTURE MUST BE REINFORCED.
Warning Statements
PRIOR TO THE INSTALLATION OF THIS PRODUCT, THE INSTALLATION INSTRUCTIONS MUST BE READ AND
COMPLETELY UNDERSTOOD. KEEP THESE INSTALLATION INSTRUCTIONS IN AN EASILY ACCESSIBLE LOCATION FOR FUTURE REFERENCE.
PROPER INSTALLATION PROCEDURE BY A QUALIFIED SERVICE TECHNICIAN MUST BE FOLLOWED, AS OUTLINED
IN THESE INSTALLATION INSTRUCTIONS. FAILURE TO DO SO COULD RESULT IN PROPERTY DAMAGE, SERIOUS PERSONAL INJURY, OR EVEN DEATH.
SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE ASSEMBLY OF THIS PRODUCT. USE
PROPER SAFETY EQUIPMENT AND TOOLS FOR THE ASSEMBLY PROCEDURE TO PREVENT PERSONAL INJURY.
PREMIER MOUNTS DOES NOT WARRANT AGAINST DAMAGE CAUSED BY THE USE OF ANY PREMIER MOUNTS
PRODUCT FOR PURPOSES OTHER THAN THOSE FOR WHICH IT WAS DESIGNED OR DAMAGE CAUSED BY UNAUTHORIZED ATTACHMENTS OR MODIFICATIONS, AND IS NOT RESPONSIBLE FOR ANY DAMAGES, CLAIMS, DEMANDS, SUITS, ACTIONS OR CAUSES OF ACTION OF WHATEVER KIND RESULTING FROM, ARISING OUT OF OR IN ANY MANNER RELATING TO ANY SUCH USE, ATTACHMENTS OR MODIFICATIONS.
At least two qualied people should perform the assembly procedure. Personal injury and/or property damage can result
from dropping or mishandling the projector.
This product is intended for indoor use only. Use of this product outdoors could lead to product failure and/or serious
personal injury.
Do not install near sources of high heat. Do not install on a structure that is prone to vibration, movement or chance of
impact.
Contact Premier Mounts with any questions: (800) 368-9700 techsupport@mounts.com
Page 2 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Page 3
PP-FCTA
Installation Tools
The following tools may be required depending upon your particular installation. They are not included.
Ladder
Pencil Protective Eyewear
Hole SawHammer1/4” Concrete Drill Bit1/8˝ Drill Bit
Phillips Tip ScrewdriverHand Held Drill
Parts List
Make sure your Premier Mounts product has the following hardware and components before beginning installation. If
there are parts missing and/or damaged, stop the installation and call Premier Mounts at (800) 368-9700.
PP-FCTA Mount Hardware
Escutcheon Ring
(Qty 1)
Main Ceiling Plate
(Qty 1)
14-Gauge x 25’ Galvanized Wire
(Qty 4 Strands)
¼”-20 Turnbuckles
(Qty 4)
¼˝ x 3˝ Eye Lag Screws
(Qty 4)
M6 x 2.4” Concrete Anchors
(Qty 4)
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 3
Page 4
Features
The suspended ceiling adapter makes it easy to install and fine-tune the position of your overhead
projector and organize its electrical wiring above the ceiling.
Mounting Coupler
Use a set screw to hold
any 1 ½” NPT pipe to the
mounting coupler
PP-FCTA
Adjustability
Up to 9˝ of lateral shift
Electrical Access
Knockouts for electrical
or signal junction boxes
Camera Screw Hole
Use a 1/4”-20 screw to mount a camera alongside the projector
Page 4 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Page 5
PP-FCTA
PP-FCTA Installation
Introduction
Read these instructions before installing your Premier Mounts product.
Make sure you have all the parts and tools you need to safely complete the installation.
Some of the steps in this installation may require two people to prevent personal injury and/or damage to the projector. Read all the warnings in the manual and always use proper safety equipment.
Mounting the PP-FCTA
1) Pre-set four (4) M5 x 16mm combo screws on the ceiling plate assembly (two on each end of the plate).
The M5 x 16 mm screws may be attached on the inner or outer lip of the main ceiling plate.
2) Determine the ceiling tile you will use to attach the ceiling adapter.
3) Use a pencil to measure and mark 3˝ from each edge of
the t-bar frames to the inside of the tile (see diagram).
4) Determine the mounting hole position inside the marked
square of the tile and mark it with a pencil.
If you are attaching a camera, mark an additional hole for the 1/4”-20 screw next to the mounting coupler.
5) Remove any of the 24˝ x 24˝ or 24˝ x 48˝ tiles that are surrounding the marked tile.
6) Cut the mounting hole (and camera screw hole).
7) Place the ceiling plate on the t-bar rails so that the mounting coupler can slide to align with the ceiling mounting hole.
Proceed to the ″Securing the Ceiling Plate″ section on page 6.
1/4”-20 optional holes
M5 x 16mm Screws
Ceiling Plate Assembly
Upper Adapter Plate
Mounting Hole
T-Bar Frame
Ceiling Tile
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 5
Page 6
Securing the Ceiling Plate
1) Once the ceiling plate assembly is resting on the t-bar
frame rails, use a screwdriver to tighten the four (4)
M5 x 16mm combo screws.
2) Slide and center the upper plate assembly over the hole that was cut in the tile.
3) Tighten all four (4) wing nuts.
PP-FCTA
Upper Plate Assembly
Do not overtighten the mounting screws.
Proceed to the ″Electrical Box Cut-out Removal″ section
below.
Electrical Box Cut-out Removal
Electrical installation should be completed by a certied
electrician.
1) Cut the tile where the electrical box is going to be secured.
2) Using (commercially available) hardware depending on electrical installation environment, install the electrical box and secure it to the ceiling plate
assembly.
3) Make all electrical connections at this time.
Upper Adapter Plate
T-Bar Frame Rails
M5 x 16mm Combo Screw
Tiles
Proceed to the ″Attaching the Turnbuckles″ section.
Electrical Box Cut-out
Electrical Box
(Commercially
Available)
Page 6 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Page 7
PP-FCTA
Ceiling Attachment
Hook the four (4) turnbuckles into the four corners of the main ceiling plate. Then choose one of the three ceiling attachment
Wood Stud Ceiling
1) Determine a suitable structure capable of supporting the intended weight to drill the mounting holes.
Set the holes so that wires from the main ceiling
plate will angle 15 degrees outward (see Fig. 1).
2) Use a 1/8˝ drill bit to drill the mounting holes.
3) Secure the four (4) ¼˝ eye lag screws to the wood stud in the ceiling.
4) Loop a wire through an eye lag screw (see Figure 2).
5) Twist the wire at least ve (5) times around itself to secure it.
6) Run the other end of the wire through the turnbuckle.
7) Twist the wire at least ve (5) times around itself to secure it.
8) Repeat steps 4-7 for the remaining three mounting points.
The nal loop on the wire has to be tightly bent and secured to prevent it from untwisting. Twist the turnbuckles to ne-tune adjust.
Recheck all hardware and installation for proper tightness and security.
15°
Figure 1
Wood Stud
Eye Lag Screw
Proceed to the ″Securing the 1 ½˝ NPT to the PP-FCTA″ on page 11.
Concrete Ceiling
1) Determine a suitable structure capable of supporting the intended weight to drill the mounting holes.
Set the holes so that wires from the main ceiling
plate will angle 15 degrees outward (see Fig. 1).
2) Use a ¼˝ concrete drill bit to drill the mounting holes.
3) Place the concrete anchors into the drilled hole and
gently tap into place using a rubber mallet or hammer.
4) Loop a wire through a concrete anchor bolt (see Figure 2).
5) Twist the wire at least ve (5) times around itself to secure it.
6) Run the other end of the wire through the turnbuckle.
7) Twist the wire at least ve (5) times around itself to secure it.
8) Repeat steps 4-7 for the remaining three mounting points.
The nal loop on the wire has to be tightly bent and secured to prevent it from untwisting. Twist the turnbuckles to ne-tune adjust.
Recheck all hardware and installation for proper tightness and security.
Figure 2
15°
Figure 1
Solid Surface
Concrete Anchor
Proceed to the ″Securing the 1 ½˝ NPT to the
Figure 2
PP-FCTA″ on page 11.
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 7
Page 8
Ceiling Attachment (cont’d)
PP-FCTA
Truss Ceiling
1) Loop the wire around the truss (see Figure 1).
Hang the wires from the trusses so that they will angle 15 degrees outward from the main ceiling
plate (see Fig. 2).
2) Twist the wire at least ve (5) times around itself to secure it.
3) Run the other end of the wire through the turnbuckle.
4) Twist the wire at least ve (5) times around itself to secure it.
5) Repeat steps 1-4 for the remaining three mounting points.
The nal loop on the wire has to be tightly bent and secured to prevent it from untwisting. Twist the turnbuckles to ne-tune adjust. Recheck all hardware and installation for proper tightness and security.
Proceed to the ″Securing the 1 ½˝ NPT Pipe to the PP-FCTA″
section below.
Ceiling Truss
Figure 1
15°
Figure 2
Securing the 1 ½˝ NPT Pipe to the PP-FCTA
1) Secure the 1 ½″ NPT pipe to the mounting coupler and tighten the pipe.
2) Secure the pipe using one (1) M5 x 16mm combo screw to the plate.
The M5 x 16mm combo screw must be used to stabilize the 1 ½″ NPT pipe.
3) Attach the escutcheon ring to the 1 ½″ NPT pipe beneath the ceiling tile.
Are you adding a camera to the ceiling adapter?
If Yes, proceed to the “Securing the Camera
(optional)” section on page 11.
If No, you have completed the ceiling adapter
installation.
1-½˝ Pipe
M5 x 16mm Screw
Page 8 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
Page 9
PP-FCTA-QL
Camera Screw Installation (optional)
Make sure the camera supports one (1) 1/4”-20
screw.
1) Determine which screw hole on the upper adapter
plate you will use to attach the camera.
2) Insert one (1) 1/4”-20 x 2 3/4” pan Phillips head screw
(commercially available) through one (1) wing nut (commercially available) and the desired screw hole.
The screw should go through both the upper and lower adapter plates. It will later be used to mount
the camera.
Do not overtighten the mounting screw.
1/4”-20 x 2 3/4” pan Phillips head
screw (commercially
available)
1/4”-20 optional holes
Wing nut (commercially
available)
1/4”-20 threaded insert on camera
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 9
Page 10
Technical Specications
All measurements are in inches.
23.25
590.5
23.70 602
PP-FCTA
1.18
30.1
24.45 621
SLIDING PLATE
.81
4.50
114.3
3.50
88.90
PIPE THREADS
1.5" NTP
1.18
24.75
8.43
1.00
3.25
6.50
Page 10 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
.75
Page 11
PP-FCTA
Warranty
PREMIER MOUNTS
LIMITED LIFETIME WARRANTY
What and Who is Covered by this Limited Warranty and for How Long
Premier Mounts warrants this product to be free from defects in material and workmanship for the lifetime of the original owner of this product. The limited warranty is valid only for the original purchaser of the product.
What Premier Mounts Will Do
At the sole option of Premier Mounts, Premier Mounts will repair or replace any product or product part that is defective. If Premier Mounts chooses to replace a defective product or part, a replacement product or part will be shipped to you at no charge, but you must pay any labor costs.
What is Not Covered; Limitations
PREMIER MOUNTS DISCLAIMS ANY LIABILITY FOR DAMAGE TO MOUNTS, ADAPTERS, DISPLAYS, PROJECTORS, OTHER PROPERTY, OR PERSONAL INJURY RESULTING, IN WHOLE OR IN PART, FROM IMPROPER INSTALLATION, MODIFICATION, USE OR MISUSE OF ITS PRODUCTS.
PREMIER MOUNTS DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. PREMIER MOUNTS IS NOT RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUDING BUT NOT LIMITED TO, INABILITY TO USE ITS PRODUCTS OR LABOR COSTS FOR REMOVING AND REPLACING DEFECTIVE PRODUCTS OR PARTS. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES, SO THE ABOVE LIMITATION OR EXCLUSION MAY NOT APPLY TO YOU.
What Customers Must Do for Limited Warranty Service
If you discover a problem that you think may be covered by the warranty you MUST REPORT it in writing to the address below within thirty (30) days. Proof of purchase (an original sales receipt) from the original consumer purchaser must accompany all warranty claims. Warranty claims must also include a description of the problem, the purchaser’s name, address, and telephone number. General inquiries can be addressed to Premier Mounts Customer Service at (800) 368-9700. Warranty claims will not be accepted over the phone or by fax.
Premier Mounts Attn: Warranty Claim 3130 East Miraloma Ave. Anaheim, CA 92806
How State Law Applies
THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS, AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE.
Disclaimer
Premier Mounts intends to make this manual accurate and complete. However, Premier Mounts makes no claim that
the information contained herein covers all details, conditions or variations, nor does it provide for every possible contingency in connection with the installation or use of this product. The information contained in this document is subject to change without notice or obligation of any kind. Premier Mounts makes no representation of warranty, expressed or implied, regarding the information contained herein. Premier Mounts assumes no responsibility for accuracy, completeness or sufciency of the information contained in this document.
©Premier Mounts 2011
Installation Instructions Visit the Premier Mounts website at http://www.mounts.com Page 11
Loading...