8
connections to the heater are made with flexible connections to
maintain continuity of connection.
4.3 Flue/Combustion Air Duct System
The minimum distance between surfaces of the flue pipe and
any surfaces made from combustible materials is 300mm. If it
is necessary for the flue pipe to bass through a structure made
from combustible materials a metal sleeve must be used so that
the minimum clearance of 300mm is maintained. The flue and
combustion air ducts supplied with the heater are capable of
withstanding their own weight over the allowable flue lengths.
Wall bands and bracing brackets, or equivalent, must be used
to provide lateral stability and should be used at centres not
exceeding 2.5 metres.
All models are supplied as standard with a rear flue outlet and
the flue outlet and combustion air sockets temporarily fitted.
4.3.1.1. Conversion to Top Flue Outlet
1. Remove the two blanking plates from the flue /combustion
air openings at the top of the unit.
2. Remove the four screws from the exhaust fan outlet flange.
3. Remove the screws securing the fan mounting box to the
exhaust header plate.
4. Remove fan assembly and rotate the assembly 90°
anticlockwise.
5 Refit the fan assembly to the exhaust header plate ensuring
that the gasket is not damaged, if necessary replace or make
good with silicon sealant.
6. Secure the exhaust fan outelt flange to the underside of the
top panel and fit the blanking plates to the rear panel.
4.3.1.2 Fitting Flue/Combustion Air Sockets
1. Apply a bead of silicon sealant around the face of the flange
on the exhaust fan outlet tube that can be seen from the outside
of the heater. Place the flue socket on the outside of the heater
to mate with this flange and clamp the two flanges together, on
either side of the heater panel using the screws provided. Ensure
that the silicon sealant has sealed between the two flanges.
2. Apply a bead of silicon sealant around the face of the flange
of the combustion air socket, on the same side as the socket.
Passing the socket through the panel from the inside, position
the flange up against the panel. Secure, from the outside, with
the screws provided.
3. If ducted combustion air is not required (see Section 3.5) fit
the mesh inlet plate behind the unused combustion air inlet hole.
4. Apply silicon sealant and refit blanking plates as required to
seal unused panel holes.
4.3.2. General Requirements
See Figures 1a to 2b for the different types of flue installation.
In all cases the flue outlet socket must be connected via the
provided flue system to outside air. The maximum permitted
length of flue system is 6m, or 12m if the flue outlet only is
used. If an offset is required two sets of 45° bends should be
used each set being equivalent to 0.5m of flue length. 90° bends
may be used but each set will be equivalent to 1.0m of flue
length. The minimum flue length (end of flue terminal to back
or top of heater) shall not be less than 1.0m for the NVx10 - 50
and 1.3m for the NVx60 - 140.
All outer joints must be finished with the provided locking
bands. A smear of silicon grease to the inside of sockets will
assist in fitting components together. All flue and combustion
air ducts must be supported independently of the air heater. The
flue or flue/combustion air terminal must not be installed so as
to be less than:
- 300mm below an opening e.g. window, air brick etc.
- 200mm below eaves or gutter.
- 300mm from an internal or external corner.
- 1200mm from a surface facing the terminal.
- 1500mm vertically from another terminal on the same wall.
- 300mm horizontally from another terminal on the same wall.
- 2000mm from ground level.
4.3.3 Installation of Flue System
Note: A terminal guard, as supplied by Powrmatic Ltd, must be
fitted to horizontal flue terminals. The minimum flue length in
all cases is
4.3.3.1 Horizontal System - Rear Outlet
Note: If the outlet is required to the side of the unit 90° bends
may be fitted directly onto the inlet/outlet spigots on the heater.
1. Locate the position of the flue terminal, allowing for a slight
gradient running down from the heater to the terminal of 2° 3° and cut a hole to suit.
2. Fit the flue terminal, securing via the wall plate and weather
with silicon sealant or similar.
3. Fit the twin to concentric adaptor to the terminal section and
extend the flue and combustion air ducts to the heater using
straight lengths. Fit an adjustable length prior to the unit, to
facilitate flue disconnection for servicing. Extend the adjustable
lengths to make the final connection to the appropriate heater
inlet/outlet spigots.
4. Ensure that internal silicon sealing rings are in place and that
all tubes are pushed fully home. Secure concentric lengths with
Fig 1b Exhaust only system - vertical
Terminal
Lengths
Adjustable
length
Flashing
Flue
socket
Combustion air entry
(fitted with inlet grille)
Condensate drain
length
Fig 1a Exhaust only system - horizontal
Terminal
Lengths
Adjustable
length
Flue
outlet
Combustion air entry
(fitted with inlet grille and
inlet bend (not shown))
12m maximum, Minimum 980mm
Combustion air entry
(fitted with inlet grille)
Note: A terminal guard may be required.
Combustion air entry
(fitted with inlet grille and
inlet bend (not shown))
Maximum 12m
Minimum
80Ø - 1480mm
100Ø - 1560mm
130Ø - 1860mm