Posey Bed Top Rail System User Manual

Posey
®
Bed Top Rail System
For use with Posey Bed models 8040, 8050, 8060
8011 Top Rail System
To Assemble the Top Rail System:
The Posey Bed Top Rail System was created to allow articulation of the Posey Bed with greater ease and help eliminate the potential “Binding” that can occur. The System comes standard with the Posey Bed 8060 model and retrofits to the 8040 model.
1. Remove the screw from part one. NOTE: Leave pre-installed corner pads in place.
Top Rail
4. Replace the screw into part one.
5. NOTE: This step may require two people.
To place Top Rail System
into frame, place each piece of the top rail into the metal retainers on each side as shown.
2. Holding both pieces, align the roller on part two with the slots on part one.
3. Slide the roller all the way into the slots, making sure to hold the two pieces together so they do not fall.
Part 1
6. When the top piece is in place, the silver metal detent pin should be in the upper most hole in both A-Frames.
Part 2
Storage and Handling
This device is designed for use in normal indoor environments. This device may be stored in ambient warehouse temperatures at normal humidity levels. Avoid excess moisture or high humidity that may damage product materials.
Disposal
Properly dispose of the product per facility’s
policy for BIOHAZARDOUS materials.
Posey Company • 5635 Peck Road, Arcadia, CA 91006-0020 USA • www.posey.com Phone: 1.800.447.6739 or 1.626.443.3143 • Fax: 1.800.767.3933 or 1.626.443.5014
© 2010 Posey Company. All rights reserved.
M6185 REV C 121610
Loading...