POSBank IMPREX D5 User Manual

Point-of-sale system
IMPREX D5
User’s manual
2
3
Copyright© POSBANK Co., Ltd. All rights reserved.
4
Rev No.
Revision History
Date /author
PBUM-015E(Rev001;130116)
New
2013.01.16
5
6
CE MARK
This device complies with the requirements of the EEC directive 2004/108/EC with regard to “Electromagnetic compatibility” and 2006/95/EC “Low Voltage Directive”.
FCC
This device complies with part 15 of the FCC rules. Operation is subject to the following two conditions:
(1) This device may not cause harmful interference. (2) This device must accept any interference received, including interference
that may cause undesired operation.
KC
Korea Certification mark. Certificate No. KCC-REM-PBS-IMPREX-D5(A)
CCC
China Certification mark.
Recycling and disposal of electric and electronic devices and their components
This product should not be mixed with other commercial wastes for disposal.
7
8
9
10
11
12
13
IMPREX Main unit
Adapter
Installation guide
Drivers CD
Roll paper
14
Optional Devices: CDP (Customer display)
Optional Devices: 2nd LCD monitor 12.1
Optional Devices: 2nd LCD monitor 15
15
16
Front view
7
4
15 2
6
5 81
6
3
6
4
17
Front View (Display Unit Up)
2
3
4
1
2
18
Rear/Underside View
2
2
1
4
5
6
3
19
Power & I/O port
6 5 3
1
7 4 2
20
CDP Installation
* Warning: Completely remove power cable when opening main unit or installing optional devices.
Step 1. Connect CDP cable to main unit.
Step 2. Insert CDP into slot on main unit.
Step 3. Firmly attach using the 3 screws
provided.
CDP installation is successful if the default text appears on CDP when powering on the POS system.
21
2nd Display
* The assembling method of the 2nd Display is equal for all the products. (10.1,12.1,15 inch)
Step 1. Separate Dummy Cover.
Step 3. Connect the 2nd display into slot
on main unit, after connecting the 2nd display cable.
Step 4. Firmly attach using the 3 screws
provided.
The unit is successfully installed if the O/S boots on the 2nd display unit.
22
23
24
LINK / ACT LED
SPEED LED
Status
Description
Status
Description
OFF
No link
OFF
10Mbps connection
YELLOW
Linked
ORANGE
100Mbps connection
BLINKING
Data activity
GREEN
1Gbps connection
LINK/ACT LED
SPEED LED
25
26
27
28
(ex: POSReady2009 or Windows XP)
Loading...
+ 65 hidden pages