protection for up to (36) circuits when (12) PM305 or PM324 modules are installed. PD1230s are generally
installed as close as practical to a tank monitoring console such as Pneumercator E, LDE or TMS series.
PM305 OR PM324 - LIGHTNING SURGE PROTECTOR MODULE:Each module
consists of (3) independent circuits. The modules are polarized and must be installed as shown on page 8.
Modules are sold (3) per pack separately from the PD230 and PD1230 consoles, see table below.
* (1) CONDUCTOR IS PROBE GROUND
WIRE. SEE WIRING ON PAGE 6.
TYPICAL PNEUMERCATOR SENSOR MODELS
2-WIRE3-WIRE
HS100-ND
LS600
LS600LD SERIES
LS610
RSU801
RSU800
(NON-DISCRIMINATING)
3-WIRE *
MP451S
MP452S
ES825-100
ES825-200
(DISCRIMINATING)
SERIES
SERIES
HS100D
RSU800
TO EARTH
GROUND
PD1230
!
WARNING
Refer to TMS installation manual for
WARNINGS and CAUTIONS before
proceeding. FAILURE TO COMPLY
MAY RESULT IN PERSONAL INJURY,
PROPERTY LOSS AND EQUIPMENT
DAMAGE.
IF YOUR ENCLOSURE DOES
NOT HAVE AN ALIGNMENT PIN
AND/OR LABELS INSTALLED,
ALIGN THE GASKET SHORT
AND LONG SIDES AS SHOWN
TO CREATE A WATERTIGHT
SEAL WHEN THE COVER IS
SECURED.
(4)
MOUNTING
HOLES
A
3
[86]
3
8
NOTES:
1. ENCLOSURE RATING: UP TO NEMA 4X; IP 66, DIN 40053.
EXAMPLE #1: WIRING FOR MP45xS SERIES PROBE AND (2) 2-WIRE SENSORS
TO PD1230
PROBE FIELD CABLE
(SEE NOTE 1 BELOW)
(2) CONNECTORS
FOR PM305/324 MODULES
(SEE PAGE 8 FOR INSTALLATION)
PROBE GROUND WIRE
(SEE NOTE 2)
FROM MP45xS
SERIES PROBE
EXAMPLE #2: WIRING FOR MP46xS SERIES PROBE AND 3-WIRE SENSOR
PROBE FIELD CABLE
(SEE NOTE 1 BELOW)
BLK
RED
BLK
RED
RED
123123
2
1
FIELD
PROBES OR SENSORS
2
1
1 23123
GRN
WHT
BLK
RED
BLK
RED
TO PD1230
SENSOR FIELD CABLES
BLK
BLK
FROM 2-WIRE
SENSOR #2
FROM 2-WIRE
SENSOR #1
SENSOR FIELD CABLE
"W" = WHITE; "G" = GREEN
!
WARNING
TURN OFF POWER
TO
TANK MONITORING
CONSOLE(S) BEFORE
WIRING.
INSTALL THE
REQUIRED PM305/324
MODULES IN THE PD230
AND PD1230 BEFORE
SWITCHING ON POWER.
W OR G
RED
BLK
RED
(2) CONNECTORS
BLK
FOR PM305/324 MODULES
(SEE PAGE 8 FOR INSTALLATION)
123123
2
1
FIELD
PROBES OR SENSORS
12
1 23123
W OR G
BLK
RED
FROM MP46xS
RED
SERIES PROBE
BLK
FROM 3-WIRE
SENSOR
IMPORTANT!
WIRED CIRCUITS ARE NOT FUNCTIONAL UNTIL THE REQUIRED MODULES ARE INSTALLED (SEE PAGE 8
FOR INSTALLATION). THE PM305/324 LEFT SIDE MODULE PROTECTS THE (3) "GROUP 1" CIRCUITS ON
BOTH SIDES WHILE THE RIGHT SIDE MODULE PROTECTS THE (3) "GROUP 2" CIRCUITS ON BOTH SIDES.
NOTES:
1. THE PROBE FIELD CABLE SHIELD WIRE MUST BE CONNECTED IN THE PD1230 CONSOLE AND SHOULD BE CUT BACK AND
LEFT UNTERMINATED AT THE PD230.
2. FOR THE MP45xS SERIES PROBE GROUND WIRE TO BE EFFECTIVE, THE PD230 ENCLOSURE MUST BE PROPERLY GROUNDED
BY A QUALIFIED INSTALLER USING RIGID METAL CONDUIT OR OTHER APPROVED METHODS.
EXAMPLE: WIRING FOR PROBE, 2-WIRE SENSORS AND 3-WIRE SENSOR
(12) CONNECTORS
FOR PM305/324 MODULES
(SEE PAGE 8 FOR INSTALLATION)
INSTRUMENTATIONFIELD
SHIELD WIRE
W OR G
PROBE FIELD CABLE
3-WIRE SENSOR FIELD CABLE
2-WIRE SENSOR #1 FIELD CABLE
2-WIRE SENSOR #2 FIELD CABLE
RED
BLK
RED
BLK
RED
BLK
RED
BLK
1
2
1
3
1
2
2
3
1
2
3
3
1
2
4
3
1
2
5
3
1
2
6
3
1
2
7
3
1
2
8
3
1
2
9
3
1
2
10
3
1
2
11
3
1
2
12
3
1
2
1
3
1
2
2
3
1
2
3
3
1
2
4
3
1
2
5
3
1
2
6
3
1
2
7
3
1
2
8
3
1
2
9
3
1
2
10
3
1
2
11
3
1
2
12
3
RED
BLK
RED
W OR G
BLK
RED
BLK
RED
BLK
SHIELD WIRE
PROBE FIELD CABLE
3-WIRE SENSOR FIELD CABLE
2-WIRE SENSOR #1 FIELD CABLE
2-WIRE SENSOR #2 FIELD CABLE
!
WARNING
TURN OFF POWER
TO
TANK MONITORING
CONSOLE(S) BEFORE
WIRING. INSTALL THE
REQUIRED PM305/324
MODULES IN THE PD230
AND PD1230 BEFORE
SWITCHING ON POWER.
EARTH GND
TO TANK
MONITORING
CONSOLE
TO EARTH
GROUND
TO PD230s
(SEE NOTE 2)
IMPORTANT!
WIRED CIRCUITS ARE NOT FUNCTIONAL UNTIL THE REQUIRED MODULES ARE INSTALLED (SEE
PAGE 8 FOR INSTALLATION). EACH PM305/324 MODULE PROTECTS (3) CIRCUITS ON BOTH SIDES
FOR GROUPS 1 TO 12.
NOTES:
1. THE PROBE FIELD CABLE SHIELD WIRE MUST BE CONNECTED IN THE PD1230 CONSOLE AND SHOULD BE CUT BACK AND
LEFT UNTERMINATED AT THE PD230.
2.
WARNING: TO INSURE INTRINSIC SAFETY, A 12 AWG WIRE MUST BE CONNECTED TO EACH TERMINAL. EACH WIRE MUST
THEN BE CONNECTED TO THE SYSTEM EARTH GROUND (GROUND BUSS BAR) AT THE SERVICE PANEL. THE RESISTANCE
BETWEEN THE EARTH GROUND TERMINAL BLOCK AND EARTH GROUND SHALL BE LESS THAN 1 OHM.
MODULE INSTALLATION:Align cutout with polarizing key for correct installation of module as
shown below. In addition, the "FIELD" side of the module must be on the same side as the "FIELD" wording
on the circuit boards for PD230 and PD1230.
"FIELD" ON
SAME SIDE
MODULE
PM305/324 MODULE
POLARIZING CUTOUT
CONNECTOR
POLARIZING KEY
DO NOT REMOVE
PM305/324 MODULE
POLARIZING CUTOUT
CONNECTOR
POLARIZING KEY
DO NOT REMOVE
"FIELD" ON
SAME SIDE
PD230 CIRCUIT BOARD
PD1230 CIRCUIT BOARD
MODULE TESTING: Modules can only be tested in the PD1230. Insert module into test connector and
observe the LEDs. LEDs #1 to #3 (F1 - F3) indicate good circuits. LED #4 indicates a good battery. If LED
#4 does not indicate, replace the standard 9V battery and continue the test. The (3) module circuits are
independent, therefore if (1) circuit fails the other (2) will continue to protect wiring. However, If the failed
circuit is protecting wiring, the module must be replaced as soon as possible. See page 2 for Pneumercator
module order numbers.