![](/html/22/22ca/22ca9b759d4898400fc87724df325ef2b582c8797abd96a1e3a402e5f79b0aee/bg2.png)
SE
UP INST
nk you for
Tha
Bel
w is a list
A] p
B]
C]
D]
E]
F]
G]
H]
I]
J]
K]
L]
M]
UCTIONS
urchasing
f what's in
NEUPOD
IR PUMP
IR RELEA
ALE AIR
ALE AIR
ERAMIC
ERAMIC 1
REASE P
PIKE WR
IR CAP (p
TAINLES
OOT HEI
ELF STIC
FOR THE
a pNEUP
the box al
P-1 ISOL
for inflatin
E VALVE
ITTING (f
ITTING P
LAT SPIK
/8 INCH S
CKET (fo
NCH (for t
otects the
STEEL S
HT GAUG
RUBBE
P-1
pNEUPO
D NP-1 p
ng with a
TION FO
the air bu
(for contr
r connecti
OTECTIV
FOOT (
IKE FOO
lubricatin
ightening t
air intake
UDS (use
E (for setti
PAD (for
NP-1 ISO
eumatic i
escription
T
bble)
lled releas
g the air p
E CAP (to
ilver in Col
(Black in
the O-Rin
e Cerami
nd acts as
d for moun
g the corr
lacing on
ATION F
olation de
of the par
of air in t
ump to the
keep the t
or)
Color)
gs)
Spike Fe
a second
ting the fo
ct height
oot bottom
ET:
ice.
s:
e foot)
foot)
reads clea
t)
ry air seal)
t using a 1
f the foot)
to protect
n)
/4-20 thre
surface)
d)
P
ge1of6
![](/html/22/22ca/22ca9b759d4898400fc87724df325ef2b582c8797abd96a1e3a402e5f79b0aee/bg3.png)
UP INST
SE
IMP
ORTANT:
pra
tice run co
DE
ISION 1:
. The us
. The op
DE
ISION 2:
. The alu
. The do
. A ¼-20
. Two dif
rubber
the bott
of cont
added t
lowers t
with th
touchin
of any s
version
compon
of conta
protects
to the
rubber
Cerami
three 1
base. T
uneven.
surface.
the cer
[I] to ge
is used
feet.
UCTIONS
Before pro
mpleted.
wo differe
al way is
ir bubble
m of the
cting. Thi
the mas
e fundam
ional way
rubber ai
the unde
harp objec
is easy to
ent on a r
cting the a
ive differe
inum bas
ut shaped
the surfac
thread hol
ottom of a
ad [M] ca
erent cera
flat botto
-32 threa
is creates
Please t
A clear p
mic feet.
ntly snug
ith the p
FOR THE
eeding to
t ways to
o place th
acing do
omponent
method
of your
ntal reson
is to plac
bubble f
side of yo
s that coul
et up and
gular basi
uminum to
t ways to
[A] is pla
self stick
and the
[P] is pro
compone
also be u
mic feet (
m SILVE
ed holes
a stable t
st this m
lastic spik
crew thes
ach foot t
EUPOD l
P-1
PNEUPO
the setup i
se your n
foot und
n and the
. See DE
ill allow t
omponent.
ance of th
the alumi
cing up.
r compon
d puncture
preferred i
. See DE
the platfor
et the alu
ced directl
rubber pa
luminum f
vided (and
t with this
ed at this
/8 inch C
spike [F]
[O] on th
ree point
thod as
wrench [
feet in by
the base.
go facing
NP-1 ISO
nstructions
w pNEUP
r your co
aluminum
ISION 2 f
e mass o
This is a
compone
num base
he air bu
nt, which
the rubbe
f you need
ISION 2 f
m.
inum bas
on the su
[M] can
ot while p
a supplie
standard
ime.
ramic BL
) can be
e bottom
ontact wh
t may m
I] is suppli
hand, the
The clear
p. Do not
LATION F
a few dec
D NP-1 f
ponent wi
body cont
r different
f the feet
good thing
t.
on the pl
ble will n
eeds to b
air bubble
to remov
r different
on a surf
face.
e applied
oviding gri
¼-20 stu
hread mo
CK spike
crewed in
f the alu
en the sur
the con
ed for tigh
use the
lastic wre
se any ot
ET:
sions sho
et.
h the
cting
ways
to be
as it
tform
w be
free
. This
your
ways
ce.
to the alu
.
[K]) so th
nt. The d
[G] or
to the
inum
ace is
acting
tening
rench
ch [I]
er tool to i
ld be mad
inum ba
foot can
nut shap
nstall or re
first and
e [A]. Thi
be screwe
d self stic
ove thes
P
ge2of6