Very Important Note: When
positioning the boulders, make
sure the holes for the attachment
of ropes are STRAIGHT across
from each other and NOT
DIAGONAL.
Note: The dimensions for the
ROPE BRIDGE (not shown)
are the same as the Boulder
Tight Rope.
Boulder Tight Rope
Castle Boulder
Page 3 of 33
Installation Instructions
Footing Dimensions
FOOTING OF CLIMBING BOULDERS:
A concrete pad is recommended for installation of the climbing boulders. Excavate
hole according to the pad dimension below. Allow 72 hours for concrete to
completely cure.
Important Note: Each concrete pad should have gravel fi ll 6 in below the local
frost line
Concrete Pad Dimension Recommendation:
Boulder Model Concrete Pad DimensionConcrete Required
• The area below the footing shall be excavated to a depth of 6" (152 mm) below the local
frost line and fi lled with gravel or crushed rock compacted to 95%.
• If questioning local site conditions exist, site to be examined by a licensed engineer.
6"
(152 mm)
Below
Frost Line
12"
(305 mm)
3"
(76 mm)
10"
(254 mm)
Varies (dependent on frost line depth)
Boulder
Protective Surfacing
Gravel
Concrete Slab
Reinforcement Bar
Gravel
• Allowable soil bearing value of 1,500 PSF assumed (soil type V per l.B.C. table
1804.2).
• Concrete strength is 2,500 PSI minimum.
• Reinforcement is ASTM A615 Grade 60.
• Applicable Codes:
2006 l.B.C. / 2005 A.S.C.E.7
2005 A.C.I. 316
• Design Criteria:
Importance Factor = 1.00
Basic Wind Speed = 120 mph
Exposure Category = B
Seismic Response Coeffi cient: Cs = 0.40 (max)
Seismic soil class = D
• Footing size may vary due to local soil and weather conditions.
• The base of the footing must be below frost line.
Surface mount hardware is not supplied. Customer is responsible for
concrete base and providing surface mount hardware as specifi ed by a
registered structural engineer for each specifi c project application.
Model ####
PAECN ####
Page 6 of 33
Use Zone
Installation Instructions
PLACEMENT OF CLIMBING BOULDERS:
Select the desired site location and position the climbing boulders. Measure for
all use zones using the master layout drawing. Site should be level.
Bench Boulder
ZZBD0012
Note: The Diagram shown above is provided as an example only. The
quantity, layout and placement of your climbing boulders may be diff erent
and you need to refer to your specifi c site plan for your particular
confi guration.
While these boulders are very strong and resistant to damage, improper rigging
techniques can damage the product and more importantly can create a serious
hazard to persons or property in the vicinity of the boulder movement. The
following comments are guidelines that are not intended to replace sound practices
for proper rigging. Rather they are provided as a supplement to proper rigging
techniques.
Due to their size and weight, it is recommended that a crane be used for lifting
and moving the boulders from the top with the supplied eyebolts. Refer to the
crane operators expertise to apply safe rigging and lifting practices. Please refer
to the weight charts below.
Eye bolts are provided with each boulder, except the bench boulder, to aid in the
rigging and lifting practices. When the boulders are in their desired location, the
eye bolts should be removed. Refer to the patch and repair process on page 18
to remove the eye bolts and cover the holes after use.
Page 9 of 33
Installation Instructions
Boulder Installation
Carefully read and understand these installation instructions before you
begin.
__Step 1: Before attempting to assemble your equipment, please review all
installation information carefully. Should you experience any diffi culty during the
installation process, please call us at the phone number shown on the last page
of these instructions.
__Step 2: Separate and identify all components and hardware.
__Step 3: Excavate footings as indicated on page 4 and page 5 of this document.
Clearly mark the footings locations for easy installation.
__Step 4: Attach the rigging equipment to the boulder using the eye bolts. Make
sure they are securely attached before lifting.
__Step 5: Place boulder on the concrete slab according to your layout plan. Before
detaching the crane connection, measure for accuracy.
Note: For ease in positioning, cut a 2" x 4" board to the length of space needed
between boulders. While lowering the boulders into place, place the board between
boulders to ensure proper distancing.
Page 10 of 33