1
1. Content
2. Component overview
2.1 Electronics
2.2 Steel components
2.3 Other
3. Site of construction
3.1 Maximum length of power cable
3.2 Correct placement of steel poles and console
4. Game selector console
4.1 Installing the console
5. Conduit pipes
5.1 Placement of conduit pipes & cables
5.2 Correct bending of conduit pipes
5.3 Pulling cables
6. The circle sign
6.1 Mounting the circle sign
7. Installing satellites in steel poles
7.1 Satellites ID’s
7.2 Installing each satellite
7.3 Installing the termination plug
7.4 Fix satellites with screws
8. Installing the power supply
9. Start up
9.1 Start up the system
9.2 Select Game
9.3 Reset the Game
9.4 Idle mode
9.5 Adjust Volume
10. Appendix
10.1 General introduction to PlayAlives Technology Platform
10.2 Conduit pipes and PlayAlive technology
10.3 Games
![](/html/82/822e/822ee062aa08b453ec9ba62e5f8477fda863cd711d938f6f9960916398070862/bg3.png)
Component overview
2
8 x Splitter Sattelite
P00250
1 x Devicenet Cable
33 m (blue)
P00257
2 x Stainless steel poles
65 cm o. ground
3 x Dual adhesive tape
or male/female velcro
(for Sign)
1 x Termination Plug
(devicenet)
P00252
1 x Power supply
(IPSU)
P00251
2 x Stainless steel poles
45 cm o. ground
Installation manual
(this copy)
8 x Heads for curved
steele poles
2.1 Electronics
2.2 Steel components
2.3 Other
7 x Devicenet Cable
5.5 m (purple)
P00255
3 x Stainless steel poles
85 cm o. ground
1 x Sign
for Steel console
(either sourced locally or by PlayAlive)
1 x Bit TX 25 x 25 MB 27 x M5 Countersunk
16 mm A2
1 x Steel console
(powder coated)
oror or
![](/html/82/822e/822ee062aa08b453ec9ba62e5f8477fda863cd711d938f6f9960916398070862/bg4.png)
3.1 Maximum length of power cable
Distance between power supply and the Speed console
must not exceed 33 m.
max. 30 m
min. 40 cm above ground
50 cm (recommended)
Power Supply Box
Console
Steele pole
Important!
Remember pull wire
in conduit pipe. Conduit
pipe needs to be sourced
locally.
Conduit pipe
Please install Power Supply
Box at a nearby building in
waterproof and vandalism
safe cabinet.
Site of construction
3
3.2 Correct placement of steel poles and console
Please follow the measures below when
positioning the steel poles.
5,00 m
5,00 m
90°
0,75 m
0,75 m
0,4 m
0,4 m
0,2 m
1,625 m
1,0 m
1,625 m
0,75 m
0,40 m
All measures are based on
the center of the pole.
0,85 m
0,65 m
0,45 m
0,00 m
- 0,20 m
- 0,30 m
- 0,40 m
- 0,60 m
- 0,50 m
- 0,70 m
0,2 m
Circle ø: 5,00 m