Plasma Air 201D, 201E, 202D, 202E Installation Manual

INSTALLATION, OPERATION
& MAINTENANCE MANUAL
Plasma Air
200 SERIES
(MODELS 201D, 201E, 202D, 202E)
REV 07/2019
www.plasma-air.com
INTRODUCTION
This ionization equipment is effective in reducing harmful pollutants and odors by introducing positive and negative
ions into the system. The number of units and the size of the ionization tubes are dependent on the airow in the
system and the severity of the pollution problem. See chart on the back of this manual for selection criteria.
MECHANICAL INSTALLATION INSTRUCTIONS
WARNING: To reduce the risk of re, this unit should not be installed downstream of a humidier or exposed to other sources of moisture.
CAUTION: This product is suitable for mounting into duct of metallic construction only. Installation must be such that the structural integrity of the ducting is not compromised.
Mount units to allow access to the ionization level adjustment knob and for general maintenance. This product shall
not be installed behind a suspended oor/ceiling or a structural wall, ceiling, or oor.
This product should not be mounted in a location where the air temperature exceeds 140° F. This usually means that
it should not be installed at the outlet of a gas or oil red furnace.
1. Screw the ionization tube using the end cap into the
back of the transformer while gently holding the grounding clip away from the tube.
2. For residential installations, the preferred location
is in the supply air duct leaving the AHU. Be sure to pick a location before any branch duct take-offs. Verify that there is sufficient duct depth to allow clearance for the tube – see Figure 1.
To mount the units in a duct:
a. Trace a 5½" by 5½" square on the surface of the
duct onto which you are mounting the 200 Series. The units have a flange gasket that forms a
seal between the duct and the mounting plate.
b. Cut out the traced portion of the duct using snips or sheet metal shears.
c. Screw the 200 Series ionizer onto the duct using sheet metal screws.
5½"
FIGURE 1 – MODEL 200 AND IONIZATION TUBE
GROUNDING CLIP
IONIZATION TUBE
TUBE CLEARANCE
D=10½", E=14½"
5½ "
a. b. c.
3. If the unit cannot be installed in the preferred location due to space or temperature limitations, see Figure 2 for
alternate locations. Units can be installed using “L” shaped brackets available from many hardware suppliers.
4. For commercial applications, the units can be mounted in the supply air duct as long as these ducts are easily
accessible for tube replacement or other service. Units are sometimes mounted inside a roof top AHU using “L” shaped brackets available at many hardware suppliers. Be sure to select a location within the air handling unit
where there is good air ow. One such location is immediately next to the fan inlet.
Loading...
+ 2 hidden pages