
Made in Holland
Installation instructions
www.pittcooking.com
IN2017-1-PC/EN

Installation instructions
2
1. Overview of components.
!
4. Lower all the set screws until they rise
just slightly above the unit. When done
place the heat conductor on top of the
unit.
!
2. Gently push the sealing ring around
the edge of the heat shield. Make sure
the ring is attached to the entire edge of
the shield. Repeat this for all shields.
5. Place the heat reflectors inside the
cut-outs and gently position the unit
beneath the worktop. Make sure the heat
conductor stays in position.
3
2
3
1
1
3. Overview of the set screws, divided
in 3 groups that will be referred to later
on.
6. Make sure the flanges are concentric
inside the cut-outs. WARNING: if they are
off centre, they will not function properly.
10. Do not separate the protective film
from the adhesive strip for the next
steps!
13. After placing the knob there should
be a small gap between the bottom
of the knob and the top of the sealing
scale.
11. Gently shift the unit into a position
where all gas tab pins are in the center of
their cut-outs.
!
1
14. Tighten the frontal set screws (group
1 as shown in step 3) by turning them
clockwise. This brings the heat conducÂtor up to the worktop.
12. Firmly press down the control knobs
on the gas tabs with the dots facing forÂward. Release the knob, and make sure
it pops back into its resting position.
!
5-7mm
15. Stop tightening the set screws when
the bottoms of all knobs are inside their
sealing scales. The knobs must be within
5-7mm above their scales.
7. Place the heat shields with their
sealing rings attached over the burners
and secure them using the supplied
screws.
!
8. The 2- and 3kW heat shields can only
be placed one way. They are attached
with 2 screws each.
9. Align the cutout in the 5kW heat
shield(s) with the rib inside the burner(s)
and secure it with 3 screws.
Important!
When the control knobs are not properly adjusted, the
burners will not ignite or burn evenly.
For warranty and a proper functioning of the cooking unit,
ensure to
exactly
installation manual.
follow all steps as described in this
!
2
16. Tighten the rear set screws (group
2 as shown in step 3) hand tight, make
sure the heat conductor make full
contact with the worktop.
!
19. Make sure the heat conductor makes
full contact with the worktop. Support
the unit with the two support beams, to
lower the tension on the worktop.
!
3
17. Tighten the centre set screws (group
3 as shown in step 3) hand tight, and
make sure the heat conductor makes full
contact with the worktop.
20. Finally, remove the protective film
from the sealing scale and press the knob
and scale down as a whole to make sure
they are aligned and concentric.
18. Connect the unit to gas and electricity
and ignite the burners. If the flames
extinguish after ignition, check the knob
height again (step 14).
21. Check if all knobs have enough
space to push and turn smoothly in their
sealing scale. If not, remove the sealing
scale gently and glue it again.