Pitco Se14rs, Se14s, Se14trs, Se14ts, Se18rs Owner's Manual

...
Installation and Operation Manual
For Electric Fryers
Covering Models
SE, SEH Series
Pitco Frialator, Inc.,
P.O. Box 501, Jct I-89 & I-93 Concord, NH 03302-0501 • 509 Route 3A, Bow, NH 03304 (800) 258-3708 • (603) 225-6684 • FAX (603) 225-8497
L20-246 Rev 01(11/09)
WARNING! FIRE HAZARD
THE OIL LEVEL SHOULD NOT FALL BELOW THE MINIMUM INDICATED LEVEL AT ANY
TIME. THE USE OF OLD OIL CAN BE DANGEROUS AS IT WILL HAVE A REDUCED FLASH-
POINT AND BE MORE PRONE TO SURGE BOILING.
WARNING
INSTALLATION AND ALL CONNECTIONS MUST BE MADE ACCORDING TO NATIONAL
AND LOCAL REGULATIONS AND CODES IN FORCE.
WARNING
A COUNTRY APPROVED ALL POLE CIRCUIT BREAKER WITH A MINIMUM OPEN CON-
TACT GAP OF 3mm MUST BE USED FOR PROPER INSTALLATION.
WARNING
THE FRYER IS NOT JET STREAM APPROVED. DO NOT CLEAN THE APPLIANCE WITH A
WATER JET.
NOTICE
INSTALLATION SHOULD ONLY BE DONE BY A COMPETENT SERVICE TECHNICIAN. THE
MODEL & SERIAL NUMBER, AND ELECTRICAL REQUIREMENTS STAMPED INTO THE
DATA PLATE, LOCATED ON THE INSIDE PANEL OF THE DOOR.
NOTICE
THIS APPLIANCE IS INTENDED FOR PROFESSIONAL USE ONLY, AND AS SUCH,
SHOULD BE OPERATED BY FULLY TRAINED PERSONNEL.
NOTICE
IT IS RECOMMENDED THAT THIS MACHINE BE INSPECTED BY A QUALIFIED TECHNI-
CIAN ON A YEARLY BASIS.
WARNING
THE POWER SUPPLY MUST BE DISCONNECTED SERVICING OR CLEANING THE UNIT.
WARNING
SHORTENING, WHEN IT IS AT OPERATING TEMPERATURES, IS VERY HOT AND
DANGEROUS! USE EXTREME CAUTION WHEN HANDLING! USE PROPER PROTEC-
TIVE GEAR SUCH AS INSULATED GLOVES, APRONS, FACE SHIELD, AND SLEEVES WHEN HANDLING HOT SHORTENING. DO NOT ATTEMPT TO MOVE MACHINE THAT HAS HOT OIL IN IT. ALLOW TO COOL TO ROOM TEMPERATURE OR DRAIN THE OIL
INTO A SUITABLE CONTAINER BEFORE MOVING THE FRYER.
L20-246 Rev 1 (11/09)
WARRANTY STA TEMENT
Pitco Frialator, Inc. makes the following limited war ­ranties to the original purchaser only for this equip­ment and replacement parts:
FOR YOUR SAFETY:
DO NOT STORE OR USE GASOLINE OR
OTHER FLAMMABLE VAPORS AND
LIQUIDS IN THE VICINITY OF THIS OR
ANY OTHER APPLIANCE.
1. WARRANTY PROVISIONS - FRYERS A. Pitco Frialator, Inc. warrants all parts, with
the exception of the frypot, elements and computer for 1 year after the date of installa­tion of the fryer .
B. If any parts become defective during the first
year after the installation date, Pitco Friala­tor will also pay for the labor, freight and travel costs involved in replacing said part.
2. WARRANTY PROVISIONS - FRYPOTS A. If a frypot develops a leak due to a defect in
material or workmanship within the first 10 years after installation, Pitco Frialator, Inc. will either weld or replace, at its discretion, the frypot.
B. The customer will be responsible for all
freight, labor and travel charges for this re­pair.
3. W ARRANTY PROVISIONS - COMPUTER A. Pitco Frialator, Inc. will warrant the Intelli-
fry Computer from defects in material or workmanship for a period of two years.
B. If the computer is found to be defective
after the first year the customer will be responsible for all freight, labor and travel charges for this repair.
WARNING:
IMPROPER INSTALLATION, ADJUST-
MENT , AL TERATION, SERVICE OR
MAINTENANCE CAN CAUSE PROPERTY
DAMAGE, INJURY OR DEATH. READ
THE INSTALLATION, OPERATING AND
MAINTENANCE MANUALS THOR-
OUGHLY BEFORE INSTALLING OR SER-
VICING THIS EQUIPMENT.
WARNING:
This machine is intended to be hard wired
when installed in its final location.
WARNING:
If a manufacturer supplied cord is damaged, it
must be replaced by the manufacturer or its
service agent or a similarly qualified person in
order to avoid a hazard.
Retain this manual for future reference.
4. W ARRANTY PROVISIONS - ELEMENTS A. Pitco Frialator, Inc. will warrant the Electric
Elements from defects in material or work­manship for a period of 3 years.
B. The customer will be responsible for all
freight, labor and travel charges for this re­pair.
L20-246 Rev 1 (11/09)
INSTALLATION INSTRUCTIONS
tion, maintenance and servicing.
CAUTION:
This equipment is manufactured for the use on a particular voltage and phase which is specified on the rating plate located on the inside of the door.
When your fryers arrive, inspect carefully noting any damage on the freight bill. If concealed damage is found after you have accepted the equipment, report it to the carrier immediately as all claims must be filled within 15 days of the receipt of the shipment. Also, be sure to keep all packing materials as these will be necessary to make any claim.
Follow these installation instructions care­fully. A proper installation is important for the operation of the fryers.
All installations must conform to all local and national codes.
Wiring diagram(s) are located in the back of
the service manual and inside the fryers.
Regular cleaning of this equipment, as well as the hood, is an important part of proper mainte­nance.
Once the fryers are in place:
Leveling the fryers will help ensure proper operation. To level the fryers loosen the two set screws on the caster stem. Rotate the collar of the caster to raise or lower the height of the unit. Tighten set screws to lock the adjustment. Casters should be adjusted so that the fryers are level and at the correct height under the hood system.
Do not block the area around the casters and under the fryers. Contact the Authorized Pitco Frialator representative for any service related problems. Routine maintenance may be performed by qualified personnel.
The duct system, the hood system and the fryers must be cleaned on a regular basis and must be kept clear of any grease build up.
Ventilation:
A proper ventilation system is also an impor­tant part of the installation.
Clearances:
Minimum clearance of 6" (15cm) must be maintained from combustible construction on each side and the rear of the equipment. This equipment may be installed on combustible floors.
Maintain a minimum of 24"(61cm) clearance in front of the fryer to provide for proper opera-
1
L20-246 Rev 1 (11/09)
EQUIPMENT SET UP AND SHUT DOWN PROCEDURES
NOTE: Should you experience a power failure, your
fryers will shut off automatically. Once the power has been restored, press the
key to turn the fryer
NOTE: It is recommended that melt cycle be used . This will extend the shortening life. In melt cycle the shortening turns from solid to liquid gradually through short, controlled bursts of heat. Once the predetermined temperature has been reached, the unit will exit the melt cycle and go to normal operation.
back ON. If the machine is being filtered, close the RED return valve so that the filter does not run if the machine is left unattended. Do not attempt to restart the fryers until the power is restored.
Filling the fryer with oil:
It is very important to make sure the oil level is correct before attempting to heat shortening in your Pitco fryer.
Liquid shortening can be poured directly into the fry tank until the correct level has been reached. This is indicated by a line on the right hand side of the inside of the tank.
NOTE: The “COLD” level is considered to be the “MINIMUM” oil level and the “HOT” level is con­sidered to be the “MAXIMUM” oil level.
For solid shortening, the shortening must be cut into small blocks about 1" (2.54 Cm) in size. These small blocks must be placed under and around the heating elements.
The fryer can now be turned ON.
Make sure that the shortening is at the proper level after cooking temperature has been reached. It may be necessary to add shortening to maintain the proper level.
NOTE: When adding solid shortening to an empty fry tank, first remove the baskets and support racks and fill the bottom of the tank with shortening, con­tinue to pack the remaining shortening into the tank. Place the basket support rack on top of the shorten­ing before turning the unit ON. For liquid shortening fill to the level lines indicated on the side of the tank.
NOTE: Maximum cooking load is not to exceed 3lbs (6.6kg) per basket.
CAUTION:
Excessive loading or loading of over-wet food can cause surge boiling.
Shut Down:
Press the corresponding key to turn the fryer OFF. The Computer display will go blank
and all heating functions will cease.
Set-Up:
NOTE: Please read the Operating instructions thor-
oughly before attempting to operate this equipment.
Press the computer, or the right key for the right side and the left key for the left side of a split vat
computer to turn the unit ON.
The computer display will light and the heating elements will begin to heat and will be controlled by the computer/controller.
key on either side of the full vat
2
NOTE: When the fryer is not being used, place the cover over the fry tank. (The covers are optional and do not come with fryer unless ordered)
L20-246 Rev 1 (11/09)
Loading...
+ 11 hidden pages