understand these instructions completely prior to starting work.
Check to make sure you received the proper parts for your application. The header num-
ber will be stamped on the engine ange. If you are unsure you have received the proper
parts call before you start work.
Be sure to work safe! Whenever you work under the vehicle be sure that it is located on
level, solid ground and is supported by adequate safety stands! Remember: Hot asphalt
will not support most jack stands!
Many factors affect the installation of headers, some of which are broken or aftermarket
motor mounts, accidents that impact the conguration of the frame, and/or the installation
of different engines or aftermarket cylinder heads.
Attention Customers breaking in new engines: Due to the extreme heat generated during
the break-in process, the appearance of the ceramic coating may be altered in certain areas.
The protection characteristics and thermal barrier properties of the coating is never compromised. It is recommended that a cast iron manifold or old set of headers be used for this
process.
Notice: The coating of these headers can be marred or scratched during installation. If the
header needs to be returned and is damaged, you will be charged for recoat.
JBA uses sealing beads on all its headers. We have found that when installed correctly, the raised
bead around each port increases the pressure exerted on the gasket directly adjacent to the port
and effectively prevents leaking gaskets. It is normal for the ange to be raised off the cylinder
head the thickness of the sealing bead. It is important when installing the header, to install all
bolts loosely, then tighten evenly to ensure the at installation of the ange. The torque se-
quence from one ange to another will vary, but generally every bolt on a header should be rst
t snug, starting from the inside of the ange working out, alternating from top to bottom so that
the bolt connects the ange to the manifold to the point where they barely touch. Second, using
the same inside-out pattern, tighten each bolt until nished. This method will help prevent leak-
age and will give the user the best possible performance out of their pair of headers.
For renement, both Ford V-8 engines are installed using hydro mount bushings on either side of
the block. These liquid-lled engine mounts are tuned to quell specic unwanted vibration. Un-
der extreme driving conditions these mounts allow excessive engine movement. We recommend
replacing these motor mounts with performance mounts available from Steeda PN# 555-4005.
1. Place vehicle in a location where the oor is solid and at, with adequate lighting. Do not attempt to work on a hot engine.
Heat causes metal to expand and makes removal of fasteners difcult at best. Disconnect the battery cables from the battery.
Raise the front of the vehicle to obtain adequate access to the bottom exhaust manifold anges. Use large-base jack stands to
support the vehicle. Do not rely on the jack! Block the tires to prevent the vehicle from rolling off the jack stands.
2. Spray WD-40 or some type of penetrating oil on all accessible fasteners and ttings before attempting to remove them.
3. Disconnect the exhaust system from the catalytic converter assembly. Unplug O2 sensors and remove the converter assembly
from the vehicle.
4. Unbolt the starter from the bell housing and let it hang out of the way.
5 Loosen the EGR tube located at the rear of the driver side manifold.
6. Remove the motor mount nut under the passenger side manifold.
7. Now raise the passenger side of the engine by placing a wood block under the oil pan and jacking it up approximately 1”.
8. With the engine raised, unbolt the passenger side manifold and remove the manifold studs.
9. Install the passenger side header using the supplied hardware and gasket. Apply a small amount of anti-seize to all header
bolts before threading. Torque to 13 lbs./in. Reconnect the air tting if equipped.
10. With the passenger side header installed, lower the engine onto the motor mount and tighten the motor mount nut.
11. Reinstall the starter.
12. Disconnect the steering shaft from the steering rack and swing it out of the way.
13. Disconnect the EGR tube from the driver side manifold and remove the driver side manifold and dipstick tube. Make sure
to remove all of the manifold studs. (For easier access remove the oil lter)
14. From underneath the vehicle, slip the new header into place. Then, from the top, slide the dipstick tube through the header
between the second and third tube, and the head ange. Guide the tube under the motor mount and into its hole. (Start on top
and nish underneath.)
15. Loosely attach the EGR tube to the new header. Then install the header using the supplied hardware and gasket. Remem-
ber to prepare the header bolts with anti-seize and torque to 13 lbs./in. Reconnect the air tting if equipped.
16. Tighten the EGR tube. Now reconnect the steering shaft to the steering rack. Attach the dipstick tube to the head using the
supplied spacer and original bolt. (Don’t forget to reinstall the oil lter.)
17. Install JBA h-pipe (part number 6625H or 6625HC) or custom intermediate exhaust after the headers. Connect h-pipes to
the exhaust system.
NOTE: Apply a small bead of high temperature silicone around the dome on the passenger side header for added leak protection.
18. Reconnect the battery cable.
19. Re-check everything for adequate clearance on A/C lines, steering shaft, brake lines, etc.
20. Start the engine and let it warm up. Check for leaks. Shut engine off and let it cool down. Check to make sure all fasteners
are tight.
21. Periodically check and retighten the header bolts.
Parts List:
(1) Driver ’s Side Header Assembly
(1) Passenger ’s Side Header Assembly
(2) Header gaskets (Header to Head ange)
(1) Base ange gasket
(18) 8mm x 1.25 Header bolts w/lock washers (Torque to 13 lbs./in on aluminum heads)
(2) 3/8” x 1-1/2” Collector bolts w/washers -(2 at washers and 1 lock washer per)
(2) 3/8” x /2” Collector bolts w/washers -(2 at washers and 1 lock washer per)
(2) 8mm at washers
(1) 8mm x 1.25 nut
(1)Dipstick tube spacer
LIMITED ONE YEAR WARRANTY
All JBA HEADERS and exhaust products are guaranteed, to the original purchaser, to be free of defects in materials and workmanship for one year. This warranty
covers the replacement or repair of the product only and does not cover the cost
of removal and installation, customer applied aftermarket coatings or any discolor-
ation or corrosion of nished surfaces.
Damage or product failure resulting from collision, improper installation, off-road
use, road hazards, the use of exhaust insulating wrap or like products or rust occurring after installation, is not covered by the warranty. The warranty extends only
to the original purchaser.
Should a part become defective it should be returned to the original selling retailer
and must be accompanied with the sales receipt. If there is no retailer in your area,
call the factory for a return authorization and return your part prepaid to the factory
for inspection. PerTronix reserves the rights to replace or repair the alleged defective part and return the part freight collect.
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.