PerTronix 40-3043 User Manual

INSTALLATION INSTRUCTIONS
** Installation recommendation: JBA recommends in most case that the vehicle be taken to a reputable exhaust shop for installation.
Part No. 40-3043
2007 Chevrolet Tahoe 4.8/5.3L 2007 GMC Yukon 4.8/5.3L
A B
F
D
Parts List: Qty
A. Intermediate pipe 1 B. JBA Mufer 1 C. Axle pipe 1 D. Tail pipe with tip 1 E. 3” U-bolt clamp 2 F. 3” Clamp w/ hanger 1
Start:
1. Remove and inventory new JBA exhaust system.
2. Disconnect negative battery cable and allow vehicle to cool.
3. Spray hangers with WD40 or equivalent lubricant.
4. Cut the factory tail pipe behind the rear mufer hanger.
7. Remove the factory mufer assembly.
8. Install the intermediate pipe (A)
E
12. Install the JBA mufer (B) on the end of the intermediate pipe (A).
13. Position the 3” U-bolt clamp over the slip connection with mufer (B) and intermediate pipe (A).
14. Install the 3” U-bolt clamp with hanger (F) at the rear of the JBA mufer (B) and insert hangers into the factory rubber isolators.
C
E
19. Align the new tip of the system for proper clearance from fender and suspension. Secure in place by tightening clamps (E).
20. Using a soft cloth, remove all prints from exhaust tip.
21. Check all clamps and con­nections for proper t and align­ment. Double check all clamps are tightened and that all hangers are secure in rubber grommets. It is recommended that after installation of the exhaust system you have all slip connections tack welded by a mufer shop.
NOTES:
1. All exhaust systems expand about 1” rearward when exhaust temperature rises.
2. It may be necessary to adjust the location of the spare tire.
3. Use anti-seize on threads of clamps.
5. Remove the rear factory exhaust hangers from the rubber isolators and remove the tail pipe.
9. Insert the intermediate pipe (A) hanger into the forward rubber isolator.
10. Temporarily snug the fasteners connecting the intermediate pipe (A) to the cat assembly.
15. Position the axle pipe (C) over the rear axle and then slip it together with the mufer (B).
16. Fit 3” U-bolt clamp (F) over the end connection with mufer (B) and axle-pipe (C).
17. Install the tail pipe with tip (D) on to end of axle pipe (C). Insert hanger into rubber isolator.
To get more power out of your Tahoe or Yukon, JBA offers easy to install 50 state smog legal perfor­mance headers and ignition wires. For more information about these and other quality performance products from JBA visit us online at www.jbaheaders.com
JBA Cat4ward® Headers
p/n 1850-2JS
18. Install the 3” U-bolt clamp over
6. Remove the front mufer hanger from the rubber isolator. Unbolt the mufer assembly from the catalytic converter assembly.
11. Slip the supplied 3” U-bolt clamp (E) over the end of the intermedi­ate pipe (A).
connection between tail pipe (D) and axle pipe (C).
JBA Powercables™ Ignition Wires
p/n 0807
JBA recommends taking the vehicle to a mufer shop and having all slip connections tack welded. 6.31.06
Loading...