Perrycraft HDS Drill-mount Bed Rails User Manual

Page 1
INHDS-DRMT 121108
Stainless Steel Tubular Rails
by
UNIVERSAL DRILL MOUNT
INSTALLATION INSTRUCTIONS
Qty. Description Qty. Description
1. Before beginning the installation, please review these instructions carefully, insuring that all
necessary hardware is included. If any parts are missing, please contact Perrycraft, Inc immediately.
2. Insert the 3/8” x 1 1/2” Bullet-point Studs into the ends of each bed rail.
3. Place bed rails on truck bed in the desired position. Use point of stud to mark position where
holes are to be drilled in top of bed.
4. Drill 7/16” hole in each marked position. Clean metal shavings from area around drilled hole, and prime raw metal to inhibit corrosion from condensation.
5. Assemble as shown in Diagram below, insuring that hex nuts are tightened securely.
6. Periodically check hex nuts to insure they remain tight (nuts may loosen from vibration).
Assembly Diagram
Bed Rail
Bullet-point Stud
Truck Bed
Molded Gasket
3/8” Flat Washer
3/8” Lock Washer
9/16” Hex Nut
CLEANING AND MAINTENANCE INSTRUCTIONS: To maintain and care for this product, please keep it clean and do not use abrasive cleaners or polish waxes. Automotive waxes such as pure Carnuba are recommended to remove scratches.
Perrycraft, Inc. 2804 Griffith Road Winston-Salem, NC 27103 800-777-7081
Loading...