Perlick HP15TO32L, HP15TS32R, HP15TS32RA Installation Manual

Installation Manual
HP15TS/TO HP24TS/TO
HC24TB/TO
HP15TS-3-**A
HP24TS-3-***A
15” SIGNATURE SERIES 24” SIGNATURE SERIES 24” C-SERIES
15” SIGNATURE SERIES ADARA 24” SIGNATURE SERIES ADARA
Form No. Z2349-B Rev. 03/03/2016
PERLICK RESIDENTIAL INSTALLATION MANUAL FOR BEER DISPENSING EQUIPMENT
DANGER
WARNING
DANGER
WARNING
CONGRATULATIONS
Congratulations on your purchase of a Perlick high quality residential Beer Dispenser. Perlick has proudly manufactured beer dispensing systems for over 50 years for bars, restaurants, stadiums, arenas and large venues around the world. That same technology is used in each and every residential beer dispenser we produce, assuring you’ll pour fresh, cold beer as the brewery intended it to be enjoyed.
All Perlick products are built with commercial grade stainless steel, providing you with the beauty and durability for a lifetime of use. This installation guide will show you how to properly install the dispensing equipment on your Perlick Beer Dispenser.
We dedicate considerable time to ensure that our products provide the highest level of customer satisfaction. If, however, service is required, call Perlick at 800.558.5592. For your own protection, never return merchandise for credit without our approval.
IMPORTANT!
The installation of the actual beer
dispenser cabinet should happen prior
to installing the dispensing equipment.
Refer to the Installation Manual that
accompanied the Beer Dispenser for step-
by-step installation of the cabinet.
PLEASE NOTE
The following instructions are for both the
Draft Arm (standard tower) and the Adara
Signature Beer Tower. Some photos and drawings may only show the Draft Arm, but the instructions will also apply to the Adara
Signature Beer Tower unless noted.
We thank you again for selecting a high quality Perlick Beer Dispenser. Cheers!
Keep CO2 cylinder away from heat. Rupture disc vents at 122°F
maximum.
Do not drop or throw regulator or CO2 cylinder.
Allow only properly trained and experienced personnel to handle
high pressure gas.
Do not apply oil to the regulator!
C
2
US
perlick.com
PERLICK RESIDENTIAL INSTALLATION MANUAL FOR BEER DISPENSING EQUIPMENT
INSTALLATION OF DISPENSING EQUIPMENT
Open the tapping kit box and become familiar with its components. The instructions on pages 4 through 10 will demonstrate how to properly install the tapping equipment on your new Perlick Beer Dispenser.
Dispensing Head
All hose connections use worm-drive hose clamps (view
enlarged to verify)
Keg
Apply silicone to bottom ange
Flange Sleeve
Beer Connection
Faucet Lead
Air Distributor
Keg Coupler
NOTE: Image does not accurately reect positions of the dierent elements within the unit. Positions and hose lengths shown are to clearly illustrate proper connection methods only.
Distributor is only on multiple keg units, each keg is connected to a valve on the air distributor. Single keg is connected directly to the regulator.
perlick.com
3
PERLICK RESIDENTIAL INSTALLATION MANUAL FOR BEER DISPENSING EQUIPMENT
INSTALLATION OF DISPENSING EQUIPMENT
Open the tapping kit box and become familiar with its components. If the dispensing head is going to be mounted on a counter top directly above the refrigerated
NOTE: Wash tapping devices thoroughly. Flush beer and faucet lines, as well as the tapping device (keg coupler) with fresh water.
cabinet, have the counter top pre-drilled using the supplied template on page 11. Make sure that the access hole in the refrigerated cabinet is in line with the counter top holes. Remove any obstructions from the access hole of the refrigerator.
Follow instructions on pages 4 through 10 to properly install the tapping equipment on your perlick unit, or watch our Beer Dispenser Tapping Installation video. Information on how to access this video can be found to the right.
Use the following web link to view the video through your browser window: http://youtu.be/
NCKP6x2zZmo
Scan the QR code with your mobile device to watch the video instantly.
IF YOU ARE INSTALLING A DRAFT ARM - SKIP TO PAGE 6. THE FOLLOWING INSTRUCTIONS ARE ADDITIONAL PREPARATION STEPS FOR THE ADARA DISPENSING HEAD ONLY
1. Mark the air tube for correct length dependent upon your installation scenario. If installing directly on top of the refrigerated cabinet, make a mark 5 inches from the bottom of the tower (Figure 1). If installing directly on top of a countertop, add the depth of the countertop to the original 5 inches and mark at that new dimension (Figure 2).
4
Figure 1. Figure 2.
perlick.com
Loading...
+ 8 hidden pages