Installation Manual
for Beer Dispensing Equipment
HP15TS/TO
HP24TS/TO
HC24TB/TO
HP15TS-3-**A
HP24TS-3-***A
15” SIGNATURE SERIES
24” SIGNATURE SERIES
24” C-SERIES
15” SIGNATURE SERIES ADARA
24” SIGNATURE SERIES ADARA
Form No. Z2349-B
Rev. 03/03/2016
PERLICK RESIDENTIAL INSTALLATION MANUAL FOR BEER DISPENSING EQUIPMENT
CONGRATULATIONS
Congratulations on your purchase of a Perlick high
quality residential Beer Dispenser. Perlick has proudly
manufactured beer dispensing systems for over 50 years
for bars, restaurants, stadiums, arenas and large venues
around the world. That same technology is used in each
and every residential beer dispenser we produce, assuring
you’ll pour fresh, cold beer as the brewery intended it to
be enjoyed.
All Perlick products are built with commercial grade
stainless steel, providing you with the beauty and durability
for a lifetime of use. This installation guide will show you
how to properly install the dispensing equipment on your
Perlick Beer Dispenser.
We dedicate considerable time to ensure that our products
provide the highest level of customer satisfaction. If,
however, service is required, call Perlick at 800.558.5592.
For your own protection, never return merchandise for
credit without our approval.
IMPORTANT!
The installation of the actual beer
dispenser cabinet should happen prior
to installing the dispensing equipment.
Refer to the Installation Manual that
accompanied the Beer Dispenser for step-
by-step installation of the cabinet.
PLEASE NOTE
The following instructions are for both the
Draft Arm (standard tower) and the Adara
Signature Beer Tower. Some photos and
drawings may only show the Draft Arm, but
the instructions will also apply to the Adara
Signature Beer Tower unless noted.
We thank you again for selecting a high quality Perlick Beer
Dispenser. Cheers!
Keep CO2 cylinder away from
heat. Rupture disc vents at 122°F
maximum.
Do not drop or throw regulator or
CO2 cylinder.
Allow only properly trained and
experienced personnel to handle
high pressure gas.
Do not apply oil to the regulator!
C
2
US
perlick.com
PERLICK RESIDENTIAL INSTALLATION MANUAL FOR BEER DISPENSING EQUIPMENT
INSTALLATION OF DISPENSING EQUIPMENT
Open the tapping kit box and become familiar with its
components. The instructions on pages 4 through 10
will demonstrate how to properly install the tapping
equipment on your new Perlick Beer Dispenser.
Dispensing Head
All hose connections
use worm-drive
hose clamps (view
enlarged to verify)
Keg
Apply silicone to
bottom ange
Flange Sleeve
Beer Connection
Faucet Lead
Air Distributor
Keg Coupler
NOTE: Image does not accurately reect positions of the
dierent elements within the unit. Positions and hose lengths
shown are to clearly illustrate proper connection methods
only.
Distributor is only on
multiple keg units,
each keg is connected
to a valve on the air
distributor. Single keg
is connected directly to
the regulator.
perlick.com
3
PERLICK RESIDENTIAL INSTALLATION MANUAL FOR BEER DISPENSING EQUIPMENT
INSTALLATION OF DISPENSING EQUIPMENT
Open the tapping kit box and become familiar with
its components. If the dispensing head is going to be
mounted on a counter top directly above the refrigerated
NOTE: Wash tapping devices thoroughly. Flush
beer and faucet lines, as well as the tapping device
(keg coupler) with fresh water.
cabinet, have the counter top pre-drilled using the
supplied template on page 11. Make sure that the access
hole in the refrigerated cabinet is in line with the counter
top holes. Remove any obstructions from the access hole
of the refrigerator.
Follow instructions on pages 4 through 10 to properly
install the tapping equipment on your perlick unit, or watch
our Beer Dispenser Tapping Installation video. Information
on how to access this video can be found to the right.
Use the following web link to view the video
through your browser window: http://youtu.be/
NCKP6x2zZmo
Scan the QR code with your
mobile device to watch the
video instantly.
IF YOU ARE INSTALLING A DRAFT ARM - SKIP TO PAGE 6. THE FOLLOWING INSTRUCTIONS ARE ADDITIONAL
PREPARATION STEPS FOR THE ADARA DISPENSING HEAD ONLY
1. Mark the air tube for correct length dependent upon your installation scenario. If installing directly on top of the
refrigerated cabinet, make a mark 5 inches from the bottom of the tower (Figure 1). If installing directly on top of a
countertop, add the depth of the countertop to the original 5 inches and mark at that new dimension (Figure 2).
4
Figure 1. Figure 2.
perlick.com