Pepperl Fuchs SIMATIC Manager STEP 7 User Manual

R
Configuration Instructions for the LB/FB Remote I/O System
Commissioning with SIEMENS STEP 7
Manual
Worldwide
Pepperl+Fuchs Group
Lilienthalstr. 200
68307 Mannheim
Germany
Phone: +49 621 776 - 0
E-mail: info@de.pepperl-fuchs.com
North American Headquarters
Pepperl+Fuchs Inc.
1600 Enterprise Parkway
Twinsburg, Ohio 44087
USA
Phone: +1 330 425-3555
E-mail: sales@us.pepperl-fuchs.com
Asia Headquarters
Pepperl+Fuchs Pte. Ltd.
P+F Building
18 Ayer Rajah Crescent
Singapore 139942
Phone: +65 6779-9091
E-mail: sales@sg.pepperl-fuchs.com
https://www.pepperl-fuchs.com
Configuration Instructions for the LB/FB Remote I/O System
Contents
1 Introduction................................................................................................................ 4
1.1 Purpose of the Instructions .......................................................................... 4
1.2 Technical Basics ............................................................................................ 4
1.3 Registered Trademarks ................................................................................. 5
1.4 Symbols Used ................................................................................................ 5
1.5 Display conventions ...................................................................................... 5
2 User Interface Basics ................................................................................................ 6
2.1 Project view.................................................................................................... 6
2.2 Configuration View ........................................................................................7
3 Commissioning the LB/FB Remote I/O System ......................................................8
3.1 Preparation for Commissioning ................................................................... 9
3.2 Creating a New Project................................................................................ 10
3.3 Adding the Control Panel to the Project.................................................... 11
3.4 Installing the GSDML File ........................................................................... 17
3.5 Configuring the LB/FB Remote I/O System............................................... 19
3.5.1 Gateway Integration ......................................................................... 19
3.5.2 Gateway Configuration..................................................................... 20
3.5.3 Configuring the I/O Modules ............................................................ 23
3.6 Parameterizing Submodules ...................................................................... 26
3.7 Compiling and Loading the Project Configuration................................... 27
4 Diagnosis.................................................................................................................. 28
4.1 Alarms........................................................................................................... 31
5 Testing with Variable Tables.................................................................................... 33
5.1 Symbol Table ................................................................................................ 33
5.2 Variable Table ............................................................................................... 36
2020-11
3
Configuration Instructions for the LB/FB Remote I/O System
Introduction

1 Introduction

These instructions will help you commission and configure an LB/FB remote I/O system using the SIMATIC Manager STEP 7.

1.1 Purpose of the Instructions

These instructions describe the key functions in STEP 7 that help you commission an LB/FB remote I/O system. Customer-specific adaptations are not described. Note that software changes cannot always be taken into account, meaning that deviations in the description may occur.
Note
For more information about STEP 7, refer to the corresponding online Help or documentation.
Commissioning involves the integration of the LB/FB remote I/O system in a PROFINET net­work. STEP 7 is used for configuration, then parameterization of the LB/FB remote I/O system takes place.
The hardware configuration is an offline process that is completed without a connection to the control panel (PLC). In STEP 7, a project is created and the LB/FB remote I/O system is config­ured. The selection of the gateway and the I/O modules from the hardware catalog enables the exact structure of the LB/FB remote I/O system to be replicated in the software project. In the configuration table, each I/O module is automatically assigned an address. When the automa­tion system starts up, the target configuration created with STEP 7 is compared with the actual configuration. Any errors can thus be detected and reported immediately.
After configuration, the LB/FB remote I/O system is parameterized. Parameterization involves setting the device characteristics such as the addresses and stipulating the communication characteristics. The I/Q addresses are used, for example, to define where each binary or ana­log signal can be read in or out.
When device configuration is complete, the configuration data is compiled in a format that the control panel can understand and loaded into the control panel. You can use variable tables to save different test environments. You can then reproduce tests and process monitoring multiple times during commissioning or for service purposes.

1.2 Technical Basics

The plant operator is responsible for planning, commissioning, and operation.
Only trained and qualified personnel may commission and operate the product. The trained and qualified personnel must have read and understood the instructions and the other docu­mentation.
The documentation comprises the following parts:
These instructions
Datasheets
LB/FB remote I/O system hardware manual
4
2020-11
Configuration Instructions for the LB/FB Remote I/O System
Introduction
The documentation may also comprise the following parts, if applicable:
EU-type examination certificate
EU declaration of conformity
Attestation of conformity
Certificates
Control drawings
Instruction manual
Other documents

1.3 Registered Trademarks

PROFINET®: trademark of PROFIBUS Nutzerorganisation e.V. (PNO)
SIMATIC, STEP®: trademark of SIEMENS AG

1.4 Symbols Used

Notices in these instructions are indicated by symbols. The safety notices begin with signal words to indicate the severity of the hazard.
Warning messages
Caution!
This symbol indicates a possible fault.
Non-observance could interrupt the device and any connected systems and plants, or result in their complete failure.
Information messages
Note
This symbol brings important information to your attention.
Action
This symbol indicates a paragraph with instructions. You are prompted to perform an action or a sequence of actions.

1.5 Display conventions

Note
Graphical illustrations in these instructions are provided to aid basic understanding, and may deviate from the actual design.
Note
These instructions refer to the English language version of the STEP 7 configuration software.
Other language versions usually apply other names for the program calls, function calls, and menu items referred to in these instructions.
2020-11
5
Configuration Instructions for the LB/FB Remote I/O System
1 2
User Interface Basics

2 User Interface Basics

Several views are available in STEP 7 for your automation project. The views relevant for com­missioning are:
Project view
Configuration View
For further information on the views, refer to the Siemens AG user documentation.

2.1 Project view

The project view is divided into two parts. The left-hand side of the window (1) displays the proj­ect tree. The right-hand side of the window (2) displays the contents of the object selected in the project tree in the selected view (large icons, small icons, list, or details). At the top of the project tree is your project.
Figure 2.1 Layout of the project view
Item Description
1 Project tree: the project tree displays the project with the modules that have already
been positioned.
2 Project window: the project window displays the objects that can be processed using
the selected action.
2020-11
6
Configuration Instructions for the LB/FB Remote I/O System
1
2
3
User Interface Basics

2.2 Configuration View

The configuration view (HW Config) is an object-oriented view with several windows.
The figure below is a schematic depiction of the configuration view windows. Different content is displayed in the different windows, as explained below.
Figure 2.2 Configuration view layout
Item Description
1 Station window: the station window is used to configure the automation
2 Hardware catalog: the hardware catalog shows the available modules.
3 Detail window: the detail window displays additional information about the
system hardware, create the user program, and carry out project planning for the hardware.
object selected in the station window or an action that has been performed.
2020-11
7
Configuration Instructions for the LB/FB Remote I/O System
Commissioning the LB/FB Remote I/O System

3 Commissioning the LB/FB Remote I/O System

Commissioning involves the integration of an LB/FB remote I/O system into a PROFINET net­work and its configuration. Commissioning also involves compiling the project configuration and transferring it to the control panel.
The following hardware components of the LB/FB remote I/O system are relevant to commis­sioning with STEP 7:
Gateway
I/O modules
The hardware components must be replicated in the project to configure the LB/FB remote I/O system.
The gateway is the component that communicates with the control panel. The properties must be defined to be able to configure the gateway. These properties include the device name and the IP address.
During parameterization of the channels, the measurement behavior of the I/O modules that process input signals is defined. At the same time, the behavior of the I/O modules that emit output signals is defined. In STEP 7, the channels are the submodules. They are available in the hardware catalog under the I/O modules.
To commission the LB/FB remote I/O system, perform the following steps:
Preparation for commissioning
Create the project
Set up the control system
Install the GSDML file
Configure/parameterize the LB/FB remote I/O system
Compile a project configuration
Transfer a project configuration
Check the connection
A description of how to perform the individual steps is provided on the following pages.
Note
The illustrations and information contained in this description relate to the following variants:
Siemens SIMATIC S7 control panel (PLC/CPU)
Siemens STEP 7 configuration software
GSDML file for the LB/FB remote I/O system
Information about other variants can be found in the technical documentation of the control panel and the associated software.
2020-11
8
Configuration Instructions for the LB/FB Remote I/O System
Commissioning the LB/FB Remote I/O System

3.1 Preparation for Commissioning

It is necessary to plan the commissioning of an LB/FB remote I/O system beforehand. Planning ensures that all files and information are available to enable efficient commissioning.
You will need the following files and information for commissioning:
GSDML file
A device description file (GSDML file) is required to use the LB/FB remote I/O system. The cur­rent GSDML file can be downloaded from our website: www.pepperl-fuchs.com. Enter the product name or item number in the Product/Keyword search box and click on Search. Select your product from the list of search results and click on the Software tab in the product information list. A list of all available downloads is displayed.
The installation of the GSDML file is explained in chapter 3.4.
IP Address
When assigning the IP address, observe fundamental addressing rules, e.g., regarding the use of private or public address areas. Check that the IP address can be used in your automation network (no duplicate address assignment, etc.).
When assigning an address for the gateway or the LB/FB remote I/O system, the following IP address variants are available:
Dynamic IP address assigned via DHCP (DHCP default setting set to "on")
Static, customer-specific, or customer-configurable IP address
IP address assignment is described in chapter 3.5.2.
Gateway name
Each PROFINET device is identified via its "Device Name." The gateway must have a unique name before it can be addressed by the control panel.
The following rules must be observed when using the PROFINET specification for the PROF­INET device name.
The device name must not exceed 240 characters. Permitted characters:
Letter "a" to "z,"
Digits "0" to "9,"
Hyphen or period
A name component within the device namei.e., a data string between two peri-
odsmust not exceed 63 characters.
The device name must not begin or end with a hyphen.
The device name must not begin with the character string "port-xyz" (x, y, z = 0 to 9).
The device name must not have the form n.n.n.n (n = 0 to 9).
Gateway name assignment is described in chapter 3.5.2.
2020-11
9
Configuration Instructions for the LB/FB Remote I/O System
1
2
Commissioning the LB/FB Remote I/O System

3.2 Creating a New Project

After you have planned the commissioning, create a project. The control panel and hardware components of the LB/FB remote I/O system are replicated in the project.
Creating the project
To create a project, proceed as follows:
1.
Start the SIMATIC Manager.
2.
Select File > New Project.
The New Project window opens.
10
Figure 3.1 New Project window
3.
In the Name input field (1), enter a name for your project.
4.
From the Type drop-down list (2), select Project.
5.
Click on OK to confirm your selection.
The project view opens.
2020-11
Configuration Instructions for the LB/FB Remote I/O System
1
2
3
Commissioning the LB/FB Remote I/O System
Figure 3.2 SIMATIC Manager: project view

3.3 Adding the Control Panel to the Project

A control panel is an electronic assembly used in automation technology for open-loop and closed-loop control tasks. The control panel reads process input data and controls the outputs accordingly.
The control panel communicates with the gateway and is required for commissioning.
Integrating the control panel
The following steps require the station window to be open. To set up the control system, pro­ceed as follows:
1.
Select Insert (1) > Station (2) > 1 SIMATIC 300 Station (3).
Note
This configuration example uses the SIMATIC 300 station. This may vary depending on your automation project. Please select the control panel that you are using at this point.
Figure 3.3 Selecting the control panel
A placeholder for the selected control system is added to the project tree.
2.
In the project tree, select the placeholder for the control system (1).
2020-11
11
Configuration Instructions for the LB/FB Remote I/O System
1
2
1
2
3
Commissioning the LB/FB Remote I/O System
Figure 3.4 Open HW Config
3.
In the project window, double-click on Hardware (2).
The HW Config configuration view opens.
Note
The components of the control system can be found in the hardware catalog on the right-hand side of the window in the configuration view. If the hardware catalog is not automatically displayed, click on the view catalog icon in the
menu bar .
Configure the control system according to your requirements. To do this, drag the required components from the hardware catalog into the station window.
The following configuration example is used to promote general understanding and may differ from your configuration.
4.
Select your CPU from the hardware catalog window (1). In this configuration example, it is an IM151-8 PN/DP CPU for ET200S.
Figure 3.5 Hardware catalog
Note
Check the version of the operating system for your CPU and select that exact version from the hardware catalog window.
2020-11
12
Configuration Instructions for the LB/FB Remote I/O System
1
2
3
Commissioning the LB/FB Remote I/O System
5.
Drag and drop the CPU into the station window (2). You can also double-click on the CPU in the hardware catalog window.
The Properties - Ethernet interface PN-IO (R0/S2.2) window (3) opens.
6.
In the properties window, enter the IP address (1) and the subnet mask (2).
Note
If you work in an Ethernet company network, you will usually receive the address from your network administrator.
Figure 3.6 IP address and subnet mask
The control panel appears in the form of a small configuration table (1) in the upper part of
the station window. The lower part of the station window displays the detail view of the con­trol panel.
7.
In the configuration table, double-click on the X1 PN-IO interface (1).
The properties window for the X1 PROFINET interface opens.
8.
Click on New... (2).
2020-11
13