IMPORTANT NOTE TO INSTALLER:
CALIFORNIA PROPOSITION 65 WARNING:
This product and related accessories contain chemicals known to the State of California to cause cancer, birth defects or other reproductive harm.
SCOPE:
These instructions are intended to provide a general understanding regarding the installation of Packaged Systems designed and built by Aurora Pump Packaged Systems.
INSPECTION:
The package and its contents are to be inspected at time of delivery.
If any item(s) show evidence of shipping damage when received, this must be noted on the waybill when signing for acceptance of shipment and also whether or not the item(s) had been inspected for concealed damage. Buyer should notify the carrier immediately and make arrangements for an inspector of the carrier to be present during the unpacking of the item(s). Buyer should then notify Aurora Pump Engineered Systems immediately. Item(s) should not be opened until the carrier’s inspector is present. If the items have been unpacked, the shipping container MUST be saved for inspection. Customers wishing Aurora Pump Packaged Systems to inspect equipment at the job site for shipping damage may request a compensated field service call. Normal field service rates will apply and will be charged to the Buyer’s account.
prevent damage to the Packaged System during off loading and installation.
Packaged Systems off loaded and stored prior to final placement must be leveled to allow opening of doors and prevent racking of door frames.
SITE PREPARATION:
The site shall be prepared for installation of the Packaged Pump System prior to receipt to minimize handling. Site preparation shall be the responsibility of the Buyer and shall consist of the following:
1. A suitable foundation shall be provided for installation of the Packaged System.
2. Floor drain(s) piping shall be installed as recommended by Aurora Pump Engineered Systems or other suitable means provided to handle the discharge from the packaged components.
3. Power circuit(s) and final hookup shall be provided for the pump package.
INSTALLATION:
Pump package shall be installed and anchored on a suitable foundation, provided by others. It is recommended that the pump package be installed allowing for a 3/4" to 1-1/2" grout thickness. Pump package shall be leveled and piping connection locations verified prior to installation of skid fill.
A suggested method of fill for the pump package interior floor is indicated below. This offering is a suggested method of fill and Aurora Pump accepts no liability for its use.
Packaged Systems must be installed level and the piping must mate with the pump flanges without strain.
Aurora Pump Packaged Systems is to be notified within 10 working days of any damaged and/or missing items. Failure to comply with this requirement will void Aurora Pump Packaged Systems’ responsibility for corrective or replacement action.
HANDLING:
Removal and installation of the Packaged Pump System is the responsibility of the Buyer and should be performed by experienced riggers accustomed to the handling of large packages. Lifting devices such as cranes, spreader bars, slings, and shackles required for the removal and installation of the package is the responsibility of the Buyer. Removable lifting lugs are supplied with unit. Care shall be taken to