Penco SK242172DDNBF-722 User Manual

Stadium Fully Framed LOCKER – KD
PENCO PRODUCTS, INC | 1820 Stonehenge Drive, Greenville, NC 27858
800-562-1000 | Fax: 800-248-1555 | general@pencoproducts.com
Assembly Instructions
The following items are in the hardware kit shipped with the locker:
8615–Number plate
8671–Aluminum Rivet
8621- Steel rivet
8709-Screw
8696- Coat Hook,
8717 Coat Rod Hook
6CR___-Coat Rod
You will need these tools to assemble the Stadium locker.
Rivet gun.
Drill with #3 Philips bit
Flat blade and Phillips head screwdrivers.
Stepladder
STEP 1- Check Parts
Unpack the component pieces for the basic locker. You should have two sides, a back, a top, shelf, coat rod hooks, coat rod, coat hooks, and bottom, for the locker body. Options could include security box and/or foot locker
www.pencoproducts.com
Stadium Fully Framed LOCKER – KD
PENCO PRODUCTS, INC | 1820 Stonehenge Drive, Greenville, NC 27858
800-562-1000 | Fax: 800-248-1555 | general@pencoproducts.com
Assembly Instructions
Note- Assemble locker upside down to allow screw insertion into underside of locker bottom. Locker assembly must be done on a flat surface. Images shown may
differ from your locker, as there are different configuration options. Some parts show with transparency in these instructions to add clarity to assembly.
STEP 2 – Assemble the locker body
2A- Lay locker top on flat surface on the ground. Insert the two sides onto the cast corner pieces of the top assembly.
2B-1 Insert locker back into slot of the top.
www.pencoproducts.com
Stadium Fully Framed LOCKER – KD
PENCO PRODUCTS, INC | 1820 Stonehenge Drive, Greenville, NC 27858
800-562-1000 | Fax: 800-248-1555 | general@pencoproducts.com
Assembly Instructions
2B-2 With the back inserted install one 8709 screw on each side of the back about half way up. Note holes are to align to make sure back is in proper position.
www.pencoproducts.com
Stadium Fully Framed LOCKER – KD
PENCO PRODUCTS, INC | 1820 Stonehenge Drive, Greenville, NC 27858
800-562-1000 | Fax: 800-248-1555 | general@pencoproducts.com
Assembly Instructions
2C-1 Insert cast corner pieces of locker bottom into the side channels.
www.pencoproducts.com
Stadium Fully Framed LOCKER – KD
PENCO PRODUCTS, INC | 1820 Stonehenge Drive, Greenville, NC 27858
800-562-1000 | Fax: 800-248-1555 | general@pencoproducts.com
Assembly Instructions
2C-2 Install one screw into each corner of the locker bottom as shown.
www.pencoproducts.com
Stadium Fully Framed LOCKER – KD
PENCO PRODUCTS, INC | 1820 Stonehenge Drive, Greenville, NC 27858
800-562-1000 | Fax: 800-248-1555 | general@pencoproducts.com
Assembly Instructions
2D- Next install one screw into the locker top in each corner as shown.
www.pencoproducts.com
Stadium Fully Framed LOCKER – KD
PENCO PRODUCTS, INC | 1820 Stonehenge Drive, Greenville, NC 27858
800-562-1000 | Fax: 800-248-1555 | general@pencoproducts.com
Assembly Instructions
2E- Now rotate locker body so the bottom is on the ground.
www.pencoproducts.com
Stadium Fully Framed LOCKER – KD
PENCO PRODUCTS, INC | 1820 Stonehenge Drive, Greenville, NC 27858
800-562-1000 | Fax: 800-248-1555 | general@pencoproducts.com
Assembly Instructions
2F-Install screws to locker back at U cut locations (6 inch intervals) on each side.
www.pencoproducts.com
Loading...
+ 16 hidden pages