Pelco SPM4-W installation manual

INSTALLATION
SPM4-W Pendant Mount
C2222M (1/06)

Important Safety Instructions

1. Read these instructions.

2. Keep these instructions.

3. Heed all warnings.

4. Follow all instructions.

6. Installation should be done only by qualified personnel and conform to all local codes.

7. Unless the unit is specifically marked as a NEMA Type 3, 3R, 3S, 4, 4X, 6, or 6P enclosure, it is designed for indoor use only and it must not be installed where exposed to rain and moisture.

Description

The SPM4-W pendant mount is specifically designed for the Spectra® Mini dome system. The mount is compatible with 0.75-inch NPT pipe or 20 mm threaded conduit.

Installation

To install the SPM4-W pendant mount:

1. Attach the mount to either 0.75-inch NPT pipe or 20 mm threaded conduit.

2. Bring wiring through the pipe/conduit and mount. Refer to Figure 6, Table D, Table E, and Table F in the installation manual for the Spectra Mini dome for wiring information.

3. Install the Spectra Mini dome in the mount. Follow the instructions in the Switch Settings and Hard Ceiling installation sections of the installation manual for the Spectra Mini dome system. In the Hard Ceiling section, disregard step 2 about cutting holes in the ceiling. In step 5 of the same section, attach the dome drive to the mount with the two 8-32 x 0.75-inch screws that are supplied with the mount.
2 C2222M (1/06)
Loading...
+ 2 hidden pages