®
MR5000L
Ceiling Monitor Mount
for the MR5000 Series
Public Viewing System
Installation/
Operation Manual
C221M-C (6/03)
Pelco World Headquarters • 3500 Pelco Way, Clovis, CA 93612-5699 USA • www.pelco.com
USA & Canada: Tel: 800/289-9100 • Fax: 800/289-9150
International: Tel: 1-559/292-1981 • Fax: 1-559/348-1120
IMPORTANT SAFEGUARDS AND WARNINGS
1. Read these instructions.
2. Keep these instructions.
3. Heed all warnings.
4. Follow all instructions.
5. Do not use this apparatus near water.
6. Do not install near any heat sources such as radiators, heat registers, stoves, or other
apparatus (including amplifiers) that produce heat.
7. Only use attachments/accessories specified by the manufacturer.
8. Use only with the cart, stand, tripod, bracket, or table specified by the manufacturer, or
sold with the apparatus. When a cart is used, use caution when moving the cart/
apparatus combination to avoid injury from tip-over.
9. Refer all servicing to qualified service personnel. Servicing is required when the
apparatus has been damaged in any way, such as when the power supply cord or
plug is damaged, liquid has been spilled or objects have fallen into the apparatus, the
apparatus has been exposed to rain or moisture, the apparatus does not operate
normally, or the apparatus has been dropped.
10. Apparatus shall not be exposed to dripping or splashing, and no objects filled with
liquids, such as vases, shall be placed on the apparatus.
11. Warning: To reduce the risk of fire or electric shock, do not expose this apparatus to
rain or moisture.
12. To reduce the risk of shock, do not perform any servicing other than that contained in
the operating instructions unless you are qualified to do so.
13. Unless the unit meets NEMA Type 3, 3R, 3S, 4, 4X, 6, or 6P standards, it is designed
for indoor use only and must not be installed where exposed to rain and moisture.
14. Only use parts recommended by Pelco.
15. Use only installation methods and materials capable of supporting four times the
maximum specified load.
16. Installation and servicing should be done only by qualified service personnel and
conform to all local codes.
17. The MR5000L is to be secured to approved ceiling surfaces using the MRCA mount
as stated in this manual in order to maintain its UL Listing and ETL Listing.
18. The MR5000L is to be secured to approved wall surfaces using the MRWA mount as
stated in this manual in order to maintain its UL Listing and ETL Listing.
19. UL Listed when used with the PMC14F and PMC21A monitors.
20. ETL Listed when used with PMCS14A, PMCS17A and PMCS19A monitors.
The product and/or manual may bear the following marks:
This symbol indicates that dangerous
voltage constituting a risk of electric shock
is present within this unit.
This symbol indicates that there are
important operating and maintenance
instructions in the literature accompanying
this unit.
Please thoroughly familiarize yourself with the information in this manual prior to installation
and operation.
CAUTION:
RISK OF ELECTRIC SHOCK.
DO NOT OPEN.
2 Pelco Manual C221M-C (6/03)
Refer to the following chart for recommended mounts, installation surfaces, and minimal
hardware requirements.
Mount Recommended Mounting Surface Recommended Hardware
MRCA Solid Concrete* Four 5/16 x 2 3/4-inch strike anchors
Ceiling
Mount
MRWA Solid Concrete* Three 5/16 x 2 3/4-inch strike anchors
Wall
Mount
*Recommended strength of concrete is 3600 psi or 25 Mpa.
DESCRIPTION
Pelco’s MR5000 public viewing system is specifically designed for retail applications to
provide a clear, visual warning to potential shoplifters that these premises are under
surveillance. When properly installed the system is an effective deterrent against shoplifting.
Use the MR5000L to mount Pelco’s PMCS19A and PMC21A monitors and other view
station accessories (PCM5000 and ICS-DO101ABK) to a ceiling. The MR5000L can
support loads up to 66 pounds (29.94 kg).
IMPORTANT
Wall board/2 x 4’s Two 5/16 x 2-inch lag bolts (bolts must
be attached to stud)
Plywood (3/4-inch construction grade) Four 5/16 x 2-inch lag bolts
Hollow cinder block Three 5/16 x 2 1/2-inch T-anchors
Wall board/2 x 4’s Three 5/16 x 2-inch lag bolts (bolts must
be attached to stud)
Plywood (3/4-inch construction grade) Four 5/16 x 2-inch lag bolts
Pelco Manual C221M-C (6/03) 3