INSTALLATION MANUAL
Optera™ IMM-PNL Metal Ceiling Panel
C2289M (5/15)
Important Safety Instructions
Prior to installation and use of this product, observe the following warnings.
1. Installation and servicin
2. Unless the unit is specifically marked as a NEMA Type 3, 3R, 3S, 4, 4X, 6, or 6P enclosure, it is designed for indoor use only
where exposed to rain and moisture.
3. The installation method and materials should be capable of supporting four times the weight of the unit and equipment.
4. Only use replacement parts recommended by Pelco.
Description
The IMM-PNL metal ceiling panel is designed for use with Optera™ IMM Series in-ceiling fixed-mount domes. It can be used to reinforce or replace the
2' x 2' ceiling tile in suspended ceiling installations.
Parts List
Qty Description
1 IMM-PNL metal ceiling panel
4 T-rail clip (for replacement ins
g should be done only by qualified service personnel and conform to all local codes.
and it must not be installed
tallations only)
Installation
There are two methods for installing the IMM-PNL metal ceiling panel. Select one of the following installation methods, and then refer to the applicable
instructions for your installation:
• Reinforcement installation
• Replacement installation: Remove the existing ceiling tile and install the IMM-PNL.
Ensure that the mounting surface
weighs 2.0 kg (4.4 lb).
REINFORCEMENT INSTALLATION
1. Remove the ceiling tile from the ceiling.
2. Prepare the ceiling tile for ins
a. Using the IMM-PNL (supplied) as a template, place it on top of the ceiling tile, and draw an outline of the center circle.
b. Cut the circle out of the ceiling tile.
3. Place the IMM-PNL in the ceiling tile. When instal
4. Install the back box in th
5. Install the ceiling tile an
: Install the IMM-PNL to strengthen the existing ceiling tile.
is capable of supporting the full weight of the IMM-PNL metal ceiling panel and the IMM Series camera. The IMM-PNL
tallation:
led, the IMM-PNL will be inside the ceiling with the ceiling tile exposed.
e ceiling tile according to the back box installation instructions.
d IMM-PNL in the ceiling.
REPLACEMENT INSTALLATION
1. Remove the ceiling tile from the ceiling.
2. Install the back box in the IMM-PNL (supplied) according to the back box installation instructions.
3. Install the IMM-PNL in the ceili
4. Attach the four T-rail clips (supplied) to each side of the IMM-PNL.
\
ng.
Figure 1. Attaching the T-Rail Clips
WARRANTY STATEMENT
For information about Pelco’s product warranty and thereto related information, refer to www.pelco.com/warranty.
Pelco, the Pelco logo, and other trademarks associa ted with Pelco products referred to in this publication are trademarks of Pelco, Inc. or its affilia tes. © Copyright 2015, Pelco, Inc.
ONVIF and the ONVIF logo are trademarks of ONVIF Inc. All other product names and services are the property of their respective companies. All rights reserved.
Product specifications and availability are subject to change without notice.
Pelco by Schneider Electric 3500 Pelco Way Clovis, California 93612-5699 United States
USA & Canada Tel (800) 289-9100 Fax (800) 289-9150
International Tel +1 (559) 292-1981 Fax +1 (559) 348-1120
www.pelco.com www.pelco.com/community