HKHS3000/HKHS3024
Heater Kits
Installation/Operation
Manual C499M
1.0 SCOPE
The information contained within this manual covers
the HKHS3000 and HKHS3024 heater kits.
Installation should be in accordance with all applicable
local and national electric codes, utilizing approved
materials only.
Please thoroughly familiarize yourself with the information in this manual prior to installation and operation.
2.0 DESCRIPTION
The HKHS3000 (120 VAC) and HKHS3024 (24 VAC)
are field installed heater kits for the HS3000 and
HS3020 high security enclosures.
These heater kits provide 30 watts of heat and are thermostatically controlled ON at 40°F (4.44°C) and OFF
at 60°F (15.56°C).
2.1 RECOMMENDED CABLE DIST ANCES
The following are the recommended cable distances for
heater operation when used with a transformer capable
of delivering the power requirements. Cable distances
are based on a 10% line loss.
120 VAC 24 VAC
(at 30 watts) (at 30 watts)
16 Awg 5,970 feet (1,820 m) 240 feet (73 m)
18 Awg 3,760 feet (1,146 m) 150 feet (46 m)
20 Awg 2,365 feet (721 m) 95 feet (29 m)
PELCO • 300 W. Pontiac Way, Clovis, CA 93612-5699 • (559) 292-1981 • (800) 289-9100
FAX (800) 289-9150 or (559) 292-3827 • DataFAX (800) 289-9108 or (559) 292-0435
3.0 INSTALLATION
T o install the HKHS3000 and HKHS3024, perform the
following steps.
1. Remove the cover from the enclosure.
2. Attach the PC board/bracket assembly to the rear
plate using two (2) 1/4-20 nuts and lock washers,
attaching to the studs on the end plate (see Figures
1 and 3).
3. Install the heater pads onto the front of the body
(end nearest window) by removing the backing and
pressing in place onto the floor of enclosure (see
Figure 3).
4. Wire per the wiring diagram in Figure 2.
Figure 1. Heater Kit Installation
Figure 2. HKHS3000 and HKHS3024 Wiring Diagram