ON
OFF
0
0
0
+35
0
-35
+90
0
0
TILT
-90
0
180
0
360
0
PAN
AZL–Azmith and Elevation
Read-Out Meter
Installation/Operation Manual
C521M (6/95)
Pelco • 300 W. Pontiac Way, Clovis, CA 93612-5699 • USA • (800) 289-9100 or (1-559) 292-1981
FAX (800) 289-9150 or (1-559) 292-3827 • DataFAX (800) 289-9108 or (1-559) 292-0435
International customers call (1-559) 292-1981 or FAX (1-559) 348-1120
TABLE OF CONTENTS
Section Page
1.0 WARNINGS........................................................................................................................................1
2.0 SCOPE...............................................................................................................................................2
3.0 DESCRIPTION...................................................................................................................................2
4.0 INSTALLATION...................................................................................................................................2
4.1 CONNECTOR INST ALLA TION.................................................................................................2
4.2 AZL METER ADJUSTMENT ....................................................................................................4
4.2.1 Preliminary Remarks ...................................................................................................4
4.2.2 Pan Meter Adjustment .................................................................................................5
4.2.3 Tilt Meter Adjustment ...................................................................................................6
5.0 OPERATION.......................................................................................................................................6
6.0 SPECIFICATIONS..............................................................................................................................6
7.0 WARRANTY AND RETURN INFORMATION.....................................................................................7
®Pelco and the Pelco logo are registered trademarks of Pelco. ©Copyright 1995, Pelco. All rights reserved.
ii Pelco Manual C521M (6/95)
LIST OF ILLUSTRATIONS
Figure Page
1 Installation/Block Diagram...............................................................................................................2
2 AZL Wiring Diagram........................................................................................................................3
3 AZL Front and Rear V iews ..............................................................................................................4
4 AZL Wiring Interface to P/T .............................................................................................................4
5 Meter Adjustment ............................................................................................................................5
REVISION HISTORY
Manual # Date Comments
C521M 6/95 Original version.
Pelco Manual C521M (6/95) iii
(This page intentionally left blank.)
iv Pelco Manual C521M (6/95)
INSTALLATION/OPERATION MANUAL AZL–AZMITH AND ELEVATION READ-OUT METER
1.0 WARNINGS
Prior to installation and use of this product, the following WARNINGS should be observed.
1. Installation and servicing should only be done by Qualified Service Personnel and conform to all Local codes.
2. Unless the unit is specifically marked as a NEMA Type 3, 3R, 3S, 4, 4X, 6, or 6P enclosure, it is designed for indoor use only and it must not be installed where exposed to rain and moisture.
Theproduct may bear the following marks:
This symbol indicates that dangerous voltage constituting a risk of electric shock is present
within this unit.
3. Only use replacement parts recommended by Pelco.
4. After replacement/repair of this unit’s electrical components, conduct a resistance measurement between line and exposed parts to verify the exposed parts have not been connected to line circuitry.
This symbol indicates that there are important operating and maintenance instructions in the
literature accompanying this unit.
CAUTION:
TO REDUCE THE RISK OF ELECTRICAL SHOCK, DO NOT REMOVE COVER. NO USER-SERVICEABLE PARTS INSIDE. REFER SERVICING TO QUALIFIED SERVICE PERSONNEL.
RISK OF ELECTRIC SHOCK.
CAUTION:
DO NOT OPEN.
Please thoroughly familiarize yourself with the information in this manual
prior to installation and operation.
Pelco Manual C521M (6/95) 1
2.0 SCOPE
4.1 CONNECTOR INSTALLATION
The information contained within this manual covers the AZL (Azmith and Elevation Read-Out Meter).
3.0 DESCRIPTION
The AZL is used to provide a visual read-out (in de­grees) of the mechanical position of DC based pan/tilts such as Pelco's P/T1250DC/PP equipped with position feedback pots.
The AZL consists of two easily read Simpson meters mounted on the front panel of the unit along with the power switch and power on indicator.
The fourteen pin CPC connector on the back panel of the unit provides the necessary wiring interface for the unit. This wiring interface is usually integrated with controller wiring at the point where the cabling con­nection is made to the P/T (reference Figure 1's simpli­fied diagram). The rest of the back panel consists of installation set-up pots for initial meter calibration. A power input cord, input line fuse and a convenient power outlet plug round out the back-panel connections.
4.0 INSTALLATION
Reference Figure 2 and Figure 3. Before connecting the wiring, set the meter module “full scale” adjust­ment pots (these are the 5K pots) on the back of the AZL unit at the full CW (clockwise) position and set the “center scale” adjustment potentiometers (these are the 1K pots) on the back of the AZL unit at approxi­mately center.
Now, reference the AZL wiring diagram in Figure 2. The wiring for connector pins 2 and 9 go to the “pan feedback” and “tilt feedback lines”, respectively, on the P/T , which, in the case of a PT1250DC/PP , share corre­sponding numbered pinouts. For the rest of the AZL wiring, we have pin 10 - which is AZL common - that is wired to feedback common (pin 10) on the P/T and pin 11 (AZL B+, +5VDC) that is wired to “feedback B+” on the P/T. We assume, of course, that any other additional wiring needed for the system in question has already been done or is also being done at this time (controller wiring, for example). Once the wiring inter­face is in place, the next thing to consider is AZL meter adjustment.
Installation consists of installing the interconnecting cable between the AZL and the P/T in use and initial adjustment of the meters for operation.
AZL
P/T
CONTROLLER
Figure 1. Installation/Block Diagram
2 Pelco Manual C521M (6/95)
Figure 2. AZL Wiring Diagram
Pelco Manual C521M (6/95) 3
ON
OFF
0
0
0
+35
TILT
0
+90
0
0
0
-35
0
-90
180
PAN
0
360
0
LOCKING
NUT
POT
PAN
5K
POT ADJ SCREW
POT
OUTPUT
1K
Figure 3. AZL Front and Rear Views
AZL
5K
+
+
1K
1K
5K
11 11
99
TILT
2
PAN
10
PT1250DC/PP
FEEDBACK B+
TILT FEEDBACK
PAN FEEDBACK
2
FEEDBACK COMMON
10
5K
POT
TILT
1K POT
AC
OUTLET
F1
AC
INPUT
Figure 4. AZL Wiring Interface to P/T
4.2 AZL METER ADJUSTMENT
are shown as circled numbers. As shipped, the pan/tilt unit is mechanically configured to be resting at hori-
4.2.1 Preliminary Remarks
zontal in the tilt position and at approximately 180° in
the pan position. Figure 3 is a diagram of the internal wiring (minus power supplies, etc.) of that part of the AZL unit related to meter adjustment. Shown there are the full and center scale pots for pan and tilt on the AZL as they would be wired to the respective position feedback pots on a Pelco P/T1250DC/PP . Interconnections between the two units
The meter adjustment procedure for both the pan and
tilt meters follows the same method. Assuming you have
already performed the connector and pot adjustments
indicated in Section 4.1, the step-by-step procedure for
meter adjustment is as follows:
4 Pelco Manual C521M (6/95)
4.2.2 Pan Meter Adjustment
0
0
360
0
0
330
In our example:
1. Turn on the power switch. There should be a slight
noticeable change in the meter reading.
2. Activate the PAN LEFT switch and observe the
pan meter reading. The AZL pan meter readout should approach “0” as the unit rotates. The unit will stop at the extreme left position. Note the meter reading. For our example, let's assume the reading is 60° (see Fig. 5a).
3. Note the meter reading and activate the PAN
RIGHT switch until the unit reaches the extreme right position. Note the meter reading. For our ex­ample, lets assume the reading is 330° (see Fig. 5b).
4. These two meter readings define the “deflection
range” of the meter (in our case 330° - 60° = 270°, see Fig. 5c) and mirrors mechanical pan movement of the P/T between its extremes. This “range” must now be shifted (in our case, to the left) by adjust­ing the “center scale potentiometer” (P AN 1K pot, see Fig. 3) on the AZL back-panel to obtain a bal­anced meter deflection at both ends. The simplest method of calculating what the balanced meter deflection should be at both ends is to subtract the “deflection range” from the total meter range and divide by 2.
360° - 270°/ 2 = 90°/ 2 = 45°
In other words, the entire range should be shifted to the left enough so that the difference between the deflection range reading made at the P AN LEFT operation and 0° and the difference between the P AN RIGHT operation and 360° are equal and have a value of 45°. In our example, then, we require the PAN RIGHT meter reading to be (360°- 45°), or 315°. The current meter reading is at 330°, so you must now adjust the “center scale pot” (PAN 1K pot, see Fig. 3) until you obtain a meter read­ing of 315°. This shifts or “rotates” the entire de­flection range for a balanced meter deflection at both ends as indicated in Figure 5d.
5. Now adjust the “full scale potentiometer” (PAN 5K Pot, see Fig. 3) on the back of the AZL unit to obtain a reading of 360°.
6. Finally, activate the PAN LEFT switch until the unit reaches the extreme left position. Verify the meter reading to be “0” degrees. Make minor ad­justments as necessary.
(a)
PAN LEFT
0
0
0
60
360
0
(c)
0
0
Deflection Range = 270
0
15
360
0
0
0
315
0
15
(d)
PAN RIGHT
0
(b)
0
0
330
360
0
45
0
Center scale potentiometer adjustment for shifting deflection range for balanced reading.
Figure 5. Meter Adjustment
Pelco Manual C521M (6/95) 5
4.2.3 Tilt Meter Adjustment
6.0 SPECIFICATIONS
Use the same methods for the tilt adjustment as those just employed for the pan meter adjustment.
Once the procedure is complete, the extreme electrical rotation limits can be reset down from the factory maxi­mum settings.
5.0 OPERATION
When power is applied to the unit the power LED on the front panel lights.
The pan and tilt meters on the front of the AZL unit will give a direct, visual, real-time readout, in degrees, of the physical orientation of the pan/tilt to which it has been electrically connected.
ELECTRICAL
Input Voltage: 120 VAC, 50/60 Hz
Power Cord: 3-wire grounded #18 Awg
Fuse Protection: F1--3A
F2--2/10ASB
Connectors: 14-pin AMP CPC connector
120 VAC convenience outlet
GENERAL
Construction
Cover: Steel, powder-coated, black
Chassis: Metal sheet, galvanized
Panel
Front: Aluminum, black, white silk screen Rear: Alodine aluminum plate
Dimensions: 3.0"H x 15.55"W x 10.19"D
(7.62 cm x 39.50 cm x 25.88 cm)
Weight: 12 lbs (5.4 kg)
6 Pelco Manual C521M (6/95)
NOTES
Pelco Manual C521M (6/95) 7
7.0 WARRANTY AND RETURN INFORMATION
WARRANTY
If a warranty repair is required, the Dealer must contact Pelco at (800) 289-9100 or (559) 292-1981 to obtain a Repair Authorization number (RA), and provide the following information:
Pelco will repair or replace, without charge, any merchandise proved defective in material or workmanship for a period of one (1) year after the date of shipment. Exceptions to this warranty are as noted below:
Two (2) years on all standard motorized and fixed
focal length lenses.
Two (2) years on Legacy®, Intercept®, CM8500/
CM9500/CM9750 Matrix and DF8 Fixed Dome products.
Two (2) years on WW5700 series window wiper
(excluding wiper blades).
Two (2) years on cameras.
Six (6) months on all pan and tilts, scanners or
preset lenses used in continuous motion applications (e.g., preset scan, tour and auto scan modes).
Pelco will warranty all replacement parts and repairs for 90 days from the date of Pelco shipment. All goods requiring warranty repair shall be sent freight prepaid to Pelco, Clovis, California. Repairs made necessary by reason of misuse, alteration, normal wear, or accident are not covered under this warranty.
Pelco assumes no risk and shall be subject to no liability for damages or loss resulting from the specific use or application made of the Products. Pelco’s liability for any claim, whether based on breach of contract, negligence, infringement of any rights of any party or product liability, relating to the Products shall not exceed the price paid by the Dealer to Pelco for such Products. In no event will Pelco be liable for any special, incidental or consequential damages (including loss of use, loss of profit and claims of third parties) however caused, whether by the negligence of Pelco or otherwise.
1. Model and serial number
2. Date of shipment, P.O. number, Sales Order number, or Pelco invoice number
3. Details of the defect or problem
If there is a dispute regarding the warranty of a product which does not fall under the warranty conditions stated above, please include a written explanation with the product when returned.
Ship freight prepaid to: Pelco
300 West Pontiac Way Clovis, CA 93612-5699
Method of return shipment shall be the same or equal to the method by which the item was received by Pelco.
RETURNS
In order to expedite parts returned to the factory for repair or credit, please call the factory at (800) 289- 9100 or (559) 292-1981 to obtain an authorization number (CA number if returned for credit, and RA number if returned for repair). Goods returned for repair or credit should be clearly identified with the assigned CA/RA number and freight should be prepaid. All merchandise returned for credit may be subject to a 20% restocking and refurbishing charge.
Ship freight prepaid to: Pelco
300 West Pontiac Way Clovis, CA 93612-5699
The above warranty provides the Dealer with specific legal rights. The Dealer may also have additional rights, which are subject to variation from state to state.