Flue gases will condense as they exit the vent
termination. This condensate can freeze on exterior
building surfaces which may cause discoloration of
these surfaces.
1.
2.
3.
This vent system will operate with a positive pressure
in the vent pipe. Follow vent pipe manufacturers
instructions for proper assembly of vent pipe and
fittings.
Refer to Table 2 for minimum and maximum vent
length allowed.
Maintain a minimum 2" clearance between vent pipe
and combustible construction.
4.
When installing vent pipe through a combustible
wall, pipe must pass through a metal wall thimble;
maintaining a 2" clearance between vent pipe and
thimble.
5.
Determine vent terminal location.
a. Vent terminal shall be located at least 3 feet
above any forced air inlet located within 10 feet.
b.
Vent terminal shall be located at least 4 feet
below, 4 feet horizontally from, or i foot above
any door, window, or gravity air inlet into any
building.
c. Vent terminal shall be located at least I foot
above ground level or normal snow lines.
d. Vent terminal shall not be located over public
walkways where condensate could create a
nuisance or hazard.
e. When adjacent to a public walkway, vent
terminal shall be at least 7 feet above grade.
f. Vent terminal shall be located at least 4 feet
horizontally from electric meters, gas meters,
regulators and relief equipment.
g. Vent terminal should not be located directly
under roof overhangs to prevent icicles from
forming.
Table 2: Equivalent Vent Length
Boiler Model
DE 03
DE-04
DE 05
DE-06
*Equivalent Length of 3" diameter
Stainless Steel Vent Pipe
Minimum Vent Length Maximum Vent Length
2-1/2 feet 50 feet
2 1/2 feet 50 feet
2-1/2 feet 45 feet
2-1/2 feet 45 feet
6 Vent Pipe Assembly:
a. Horizontal portions of the vent pipe shall slope
down not less than I/4" per foot from the boiler
to the vent termination elbow. If this horizontal
run is pitched toward boiler, provide a horizontal
drain tee as per instructions in section D. Direct
Exhaust; Vertical Venting, of this manual
b.
The horizontal portions of the vent pipe shall be
supported to prevent sagging, by metal strapping
or equivalent means, located at no greater than 4
ft. intervals.
C.
d.
e.
g.
h.
Type vent material approved is AL29-4C, 3 inch
diameter stainless steel; manufactured by Heat-
Fab ® (Saf-T-Vent); Z-Flex ® (Z-Vent); ProTech
(FasNSeal'"); Flex-L (StaR-34).
Attach the fan adapter to blower outlet flange
using gasket and 1/4"-20 nuts and washers,
(parts located in miscellaneous parts box).
Refer to Figure 13 that lists special vent adapters
for connection to boiler fan adapter. These
special adapters are not supplied with boiler.
Attach vent pipe adapter to boiler fan adapter by
applying a 1/4" bead of high temperature silicone
around diameter of fan adapter and slip vent
pipe adapter over the fan adapter. Fill in any
voids with silicone and smooth out with
moistened finger on fiat tool.
If using Z-Flex ® pipe, slide vent pipe over the first
2-1/2" of the fan adapter and secure joint
connection with the Z:Flex ® looking bands
making sure that locking band has contact with
fan adapter at boiler end and vent pipe.
Attach remaining pipe and fittings per
manufacturer's vent instructions. Use only the
silicone recommended by the vent pipe
manufacturer.
i. The only approved vent termination is a 3" 90 °
elbow. Refer to Figure 14.
*Maximum Vent Length to be reduced by 5 feet
for each 90 elbow added that is manufactured by
Z-Flex ®, Heat-Fab ® and Protech.
*Maximum Vent Length to be reduced by 7-1/2
feet for each 90 elbow added that is
manufactured by Flex-L
The outside vent terminal (90 Elbow) is not
included in Equivalent Vent Length.
11