Peerless-AV ACC-MBC Installation

ACC-MBC
40" - 48"
(102 - 122 cm)
MAX
300 lb
(136 kg)
ENG
DS-MBY942L-2X1 DS-MBY942L-3X1 DS-MBY947-2X1 DS-MBY947-3X1
1
2015-02-10 #:126-9049
WARNING
ENG - This product is designed to be installed on wood joist/beam or solid concrete ceilings. Hardware is included for wood joist/beam and solid concrete installation. Before installing make sure the supporting surface will support the combined load of the equipment and hardware. Screws must be tightly secured. Do not overtighten screws or damage can occur and product may fail. Never exceed the Maximum Load Capacity. Always use an assistant or mechanical lifting equipment to safely lift and position equipment. This product is intended for indoor use only. Use of this product outdoors could lead to product failure or personal injury. Be careful not to pinch fi ngers when operating the mount. For support please call customer care at 1-800-865-2112.
ENG
Symbols
#
To properly tighten screws: Tighten until screw
ENG
head makes contact, then tighten another 1/2 turn. Do not overtighten screws.
1
ENG
WARNING
Screws must get at least three
ENG
full turns and fi t snug.
ENG
Do not overtighten screws.
ENG
Tools Needed for Assembly.
ENG
x3
Skip to step.
2
3
+1/2
4
7/16"
(11mm)
3/8"
(10mm)
2
2015-02-10 #:126-9049
ENG
Parts (Before beginning, make sure you have all parts shown below).
Parts List
A ACC frame 1 146-1212 B support bracket 4 146-1053 C hex head screw 24 520-1321 D 1/4-20 x 1/2" phillips screw 2 510-9108
Part #Description Qty
C (24)
hex head screw
AB
ACC frame
support bracket
D (2)
1/4-20 x 1/2"
3
2015-02-10 #:126-9049
Loading...
+ 5 hidden pages