Readcarefullybeforebeginningwork.It witlsavetime.Studythe includeddrawings.
Theequipmentshallbe installedin accordancewith thoseinstallationrequirementsofthe authorityhavingjurisdictionor, in theabsenceof such
requirements,to thecurrenteditionof the NationalFuelGas CodeZ223.1/NFPA54.
Whererequiredbythe authorityhavingjurisdiction,theinstallationmustconformto the standardforControlsand SafetyDevicesforAutomaticallyFired
Boilers,ANSI/ASMECSD-I.
A - ACCESSIBILITY CLEARANCES
1. Toprovidefor reasonableconditionsofaccessibility,the followingminimumclearancesarerecommended.
a. 24" betweenthesides,top,backandfrontof theboilerand adjacentwallor otherappliance,whenaccessis requiredforservicing.
B- CLEARANCEFROMCOMBUSTIBLECONSTRUCTION
1. Thedesignofthisbelieriscertifiedforthefollowingclearancesfromcombustibleconstruction:
MODELS61-03thru61-08;62-09thru 62-11
18"fromrear
6"from rightand left sides
30"fromtop- frontalcove
6"fromflue connector
6"from steamandhot waterpipes
MODELS62-12thru62-15
24"fromsidesand rear
55"fromtop
6"fromflueconnector
6"fromsteamandhotwaterpipes
2. CAUTION:This boileris NOTDESIGNCERTIFIEDforinstallationon carpetingor combustibleflooring.
C-AIR FORCOMBUSTIONANDVENTILATION
1. Be certainadequatefacilitiesareavailableto provideairforsatisfactorycombustionandventilation.
2. AppliancesLocatedin UnconfinedSpaces:
a. Installationsin unconfinedspaceswithconventionalconstructionandlarge areas:thesupplyofairfor combustionandventilationcanusually
beconsideredadequate,
3, AppliancesLocatedonConfinedSpaces:
Ifallair for combustionand ventilationistocomefromwithinthebuilding:twoopeningsshallbe providedwithone openingcommencingwithin
12inchesof thetop andone openingwithin12inchesof the bottomof theenclosure.Theseopeningsshallnotbe locatedcloserthan 3inches
fromeitherthe topor bottomof the enclosureandshallbeopenintoareascommunicatingfreely withtheoutdoors,Theareaof eachopening
shallbe equaltoonesquareinchper 1000BTU/HRof totalinput ratingof all applianceswithinthe enclosure,witha minimumof100square
inchesforeachopemng,
Ifallair for combustionand ventilationistocomefrom outsidethebuilding:twoopeningsshallbe providedwithone openingcommencing
within12inchesofthetop and oneopeningcommencingwithin12inchesof the bottomof theenclosure.Theseopeningsshallnotbe located
closerthan3 inchesfromeitherthe top or bottomoftheenclosureandshallcomreunicatedirectlyor byductswiththeoutdoors.Theareaof
eachopeningshall beequalto onesquareinchper4000BTU/HRof totalinputrating.If ductsare usedto conveytheair,verticalductsrequire
areasofonesquareinch per4000 BTU/HR:horizontalductsrequireone squareinchper 2000BTU/HR,Ductsshallhavethe samecross
sectionalareaas thefull areaofthe openingsto whichtheyconnect.
c. Theupperopeningsareessentialformaintenanceof propercirculationofairwiththe boilerroomandreasonableambienttemperatureinorder
tomaintainpropercontroltemperatures.
D - SETTING UP BOILER - PACKAGED UNITS
1. A PackagedBoiler isfactoryassembledbeforebeingcrated.Allcontrolsandaccessoriesnecessaryforoperationof the boilerareattachedand
electricallywired.
2. The draft hoodis packedin a separatecarton.
3. When boileris removedfromthecrate,carefulinspectionshouldbe madeandthecarriernotifiedofanydamagefound.
4. Provideagood levelfoundation.
5. Placethe boileronthe foundationnearandinproperpositionwithrelationtothe chimney,andas centralizedwithrespecttothe heatingsystemas
practical,
6. The openingsin thebasesides areprovidedforadmittingsecondaryairand mustneverbeclosed.
7. Removeiackettop andattach drafthoodto flue collectorwithtwo #10x 1/2"sheetmetalscrewsprovided.Replacejackettop.
8. The burnersare installedinthe boiler.Theyaresecuredin placefor shipmentbywoodstripewiradto the Burnermixingtube.Cutthewiresand
removethewood strips.
9. The gasmanifoldandocntrolassemblyaremadeup gastight,completelyfactoryassembledandinstalledas integralcomponentsof thebase
assembly.SeeFigure12.