
QUICK START
JOEY 30 CART
JOEY 40 CART
(MK3)
VIDEO INSTRUCTIONS:
https://vimeo.com/300883114
Visit our website for detailed instruction.
www.lockncharge.com/support (International)
www.pclocs.com.au/support (AUS and NZ)
what’s included?
x8*
x2
^
x1
x1
*USA and Japan Joey 40 only. Joey 30 comes with 6 baskets, 6 rack
kits and 30 velcro cable straps. ^ USA and Japan only. UK and EU
regions will have the power cord included with the PDU Kit.
x8*
x2
x1
x1
x8*
x16
x2 x40*
x2
x2
x1

1 2
Use a piece of packing foam for
protection when carefully laying
down the cart
3
OPTIONAL FOR US CUSTOMERS THAT WANT TO RELOCATE THE PDU’S
*Joey 40 MK3 (USA model) shown for illustration
UK & EU customers will need to install the Power Distribution Units (PDU).
See the manual ‘Fitting Power Distribution Units (PDU) Kit’
Relocate Power Distribution Units
as desired. Arrange devices’ power
adaptors in the base of cart

4
Loosen the thumbscrew
and slide keyholes over the
studs to remove the cable
management cover.
Connect the device power
adaptors in the base of the
cart and route the device
cables through the strap as
shown. Replace the cable
management cover.
5
6
OPTIONAL
Place the shelf back into the cart
on an angle; one edge rst.

7
Connect the power cord and switch on. Use ECO
Safe Charge™ instructions (included in the box) for
operating details.
ECO Safe Charge Video Instructions:
https://vimeo.com/194627704
8
1
2
OPTIONAL
9
For added security, t the lock-down chain
(optional accessory) to the carts anchor
point. Visit our website for more details.
www.lockncharge.com (International)
www.pclocs.com.au (Australia and New Zealand)