PCLOCS JOEY 30 MK3, JOEY 40 MK3 Quick Start Manual

QUICK START
JOEY 30 CART JOEY 40 CART
(MK3)
https://vimeo.com/300883114
Visit our website for detailed instruction.
www.lockncharge.com/support (International) www.pclocs.com.au/support (AUS and NZ)
what’s included?
x8*
x2
^
x1
x1
*USA and Japan Joey 40 only. Joey 30 comes with 6 baskets, 6 rack kits and 30 velcro cable straps. ^ USA and Japan only. UK and EU regions will have the power cord included with the PDU Kit.
x8*
x2
x1
x1
x8*
x16
x2 x40*
x2
x2
x1
1 2
Use a piece of packing foam for protection when carefully laying down the cart
3
OPTIONAL FOR US CUSTOMERS THAT WANT TO RELOCATE THE PDU’S
*Joey 40 MK3 (USA model) shown for illustration
UK & EU customers will need to install the Power Distribution Units (PDU). See the manual ‘Fitting Power Distribution Units (PDU) Kit’
Relocate Power Distribution Units as desired. Arrange devices’ power adaptors in the base of cart
4
Loosen the thumbscrew and slide keyholes over the studs to remove the cable management cover.
Connect the device power adaptors in the base of the cart and route the device cables through the strap as shown. Replace the cable management cover.
5
6
OPTIONAL
Place the shelf back into the cart on an angle; one edge rst.
7
Connect the power cord and switch on. Use ECO Safe Charge™ instructions (included in the box) for operating details.
ECO Safe Charge Video Instructions: https://vimeo.com/194627704
8
1
2
OPTIONAL
9
For added security, t the lock-down chain
(optional accessory) to the carts anchor point. Visit our website for more details.
www.lockncharge.com (International)
www.pclocs.com.au (Australia and New Zealand)
Loading...