PCE Instruments PCE-N27D Users guide

Page 1
1
RAIL MOUNTED
USER’S MANUAL
NETWORK METER
PCE-N27D
PCE Americas Inc. 1201 Jupiter Park Drive Suite 8 Jupiter FL-33458 USA From outside US: +1 Tel: (561) 320-9162 Fax: (561) 320-9176 info@pce-americas.com
www.pce-instruments.com/english
PCE Instruments UK Ltd.
Southpoint Business Park
Hampshire / Southampton
United Kingdom, SO31 4RF
info@pce-instruments.co.uk
www.pce-instruments.com
Unit 11
Ensign way
From outside UK: +44
Tel: (0) 2380 98703 0
Fax: (0) 2380 98703 9
Page 2
2
Page 3
Contents
1. APPLICATION .................................................................................. 5
2. METER SET .....................................................................................
3.
BASIC REQUIREMENTS, OPERATIONAL SAFETY .....................
INSTALLATION .............................................................................. 10
4.
4.1. Mounting ............................................................................
4.2. External connection diagram ............................................
HANDLING .....................................................................................
5.
TECHNICAL DATA ........................................................................
6.
7.
ORDER CODES .............................................................................
10
11
12
13
16
6
6
3
Page 4
4
Page 5
5
1. ApplicAtion
N27D meters are designed for direct a.c. measure-ment: voltage, current, frequency and active power. The design allows for installation of the meter for modular switchgear in accordance with EN 62208 (meter has a width of 3 modules) on 35 mm rail. The current is measured through current transformer (CT). Measured values are displayed on 4 ­digit readout field. Switching between measured values is realized by pres-sing a button.
Fig.1. View of the PCE-N27D meter.
Page 6
6
2. METER SET
The meter set includes:
PCE-N27D meter .......................... 1 pc
-
- user’s manual ............................... 1 pc
- warranty certificate ....................... 1 pc
3. BASIC REQUIREMENTS, OPERATIONAL SAFETY
Symbols located in this service manual mean:
WARNING!
Warning of potential, hazardous situations. Especially important, one must acquaint with
this before connecting the module. The non­ observance of notices marked by these sym- bols can occasion severe injuries of
the personnel and the damage of the module.
CAUTION!
Designates a general useful note. If you
observe it, handling of the meter is made
easier. One must take note of this, when the
meter is working inconsistently to the expec­ tations.
Possible consequences if disregarded!
Page 7
In the security scope, the meter fulfills the requirements of the EEC Low-Voltage Directive (EN 61010 -1 issued by CENELEC).
Remarks concerning the operator safety:
1. General
PCE-N27D meter is designed to be installed in
The measuring systems. Non-authorized removal of the required housing, inappro-
• priate use, incorrect installation or operation creates the risk of injury to personnel or damage to equipment. For more detailed information please study the user’s manual. All operations concerning transport, installation, and com-
• missioning as well as maintenance must be carried out by qualified, skilled personnel and national regulations for the prevention of accidents must be observed. According to this basic safety information, qualified, skilled
• personnel are persons who are familiar with the installation, assembly, commissioning, and operation of the product and who have qualifications necessary for their occupation.
2. Transport, storage
Please observe the notes on transport, storage and appro­priate handling.
Observe the climatic conditions given in Technical Data.
3. Installation
The meter must be installed according to the regulation and instructions given in this User’s Manual.
Ensure proper handling and avoid mechanical stress.
Do not bend any components and do not change any insu­lation distances.
7
Page 8
8
Do not touch any electronic components and contacts.
Meters may contain electrostatic sensitive components, which can easily be damaged by inappropriate handling.
Do not damage or destroy any electrical components since this might endanger your health!
Wire cross-sections must be chosen such to assure the protection of the cable in case of a short-circuit, by means of an installation cut-off.
Requirements concerning the mains supply are described in the EN 61010-1 standard.
A cut-out or a circuit-breaker should be installed in the buil­ding and be easily accessible for the operator.
4. Electrical connection
Before switching the meter on, one must check the correct­ness of connection to the mains supply.
In case of the protection terminal connection with a sepa­rate lead, one must remember to connect it before the con­nection of the meter to the mains.
When working on live meters, the applicable national regu­lations for the prevention of accidents must be observed.
The electrical installation must be carried out according to the appropriate regulations (cable cross-sections, fuses, PE connection). Additional information can be obtained from the user’s manual.
The documentation contains information about installation in compliance with EMC (shielding, grounding, filters and cables). These notes must be observed for all CE-marked products.
The manufacturer of the measuring system or installed de­vices is responsible for the compliance with the required limit values demanded by the EMC and LVDlegislation.
Page 9
5. Operation
Measuring systems including PCE-N27D meters equip-ped with protection devices according to the corresponding standard and regulations for prevention of accidents. After the instrument has been disconnected from
• the supply voltage, live components and power connections must not be touched immediately because capacitors can be charged. The housing must be closed during operation.
6. Maintenance and service
Please observe the manufacturer’s documentation. Read all product-specific safety and application notes
in this user’s manual.
Before taking the meter out, ensure the power supply is off.
The removal of the meter housing during the guarantee period may cause its cancellation
The meter fulfills requirements related to electromagnetic compatibility in the industrial environment.
must be
9
Page 10
10
4. instAllAtion
4.1. Mounting
The meter is designed to be mounted on a 35 mm rail acc. to EN 60715.
The meter is equipped with terminals which enable the connec­tion of external wires with cross-sections:
- input current signals: 2,5 – 16 mm 4 – 16 mm
- input voltage signals: 1,5 – 16 mm 2,5 – 16 mm
2
- supply: up to 2,5 mm
.
Meter dimensions are presented on the fig. 2
2
(solid wire),
2
(stranded wire);
2
(solid wire),
2
(stranded wire);
Fig. 2. Overall dimensions
Page 11
Meters shouldn’t be mounted on the rail in direct contact with another devices emitting heat (eg other meter N27D). You must keep a minimum 5 mm distance between the devices to allow emit heat from the housings to the ambient. Otherwise, temperature outside of meter which is in direct contact with the other device may exceed the rated operating temperature stated in operating conditions.
4.2. External connection diagram
The power supply must be connected by a two-wire conductor of suitable wire cross-section ensuring its protection by an installation cut-out.
Fig. 3. Electrical connections of the PCE-N27D meter
11
Page 12
12
5. HANDLING
Unit of displayed
value
Change
displayed
value
Fig. 4. Front view.
After connecting external signals and switching the supply on, the meter displays name N27d and software revision. Then displays default quantity – voltage. One can change displayed quantity by pressing button longer than 3 seconds, text save is displayed and displayed quantity is remembered as a default quantity. After switching on power supply the meter displays its default quantity. If voltage is in measured range then frequency is taken from voltage otherwise frequency is taken from current.
Measured value
. If button is pressed
Page 13
The appearance of following symbols on the display means:
Measured value exceeds the upper value
- - - -
of the indication range.
Measured value exceeds the lower value
of the indication range.
- - - -
ErCA Loss
of meter calibration values. In such
a case, one must contact the service workshop.
6. TECHNICAL DATA
Measuring range: INPUTS:
Measuring range of voltage U: 0...
Measuring range of current I:
V
oltage frequency measurement: 0...2.0...500.0 Hz
Current frequency measurement: 0...45.0...500.0 Hz
Active power measurement: -45.4 ...-31.5...31.50.
Sustained overload: 120 % Un, 120 % In
0...0.01...1.2 In
0.01...1.2 Un -
input resistance > 3 M
..45.36 kW
at frequency 45...65 Hz
13
Page 14
14
Short duration overload (1 s): input voltage
2 Un (<1000 V)
current input: 10 In
Basic error:
- voltage ± (0.5% of the range) in frequency range 40...500 Hz
- current ± (0.5% of the range) in frequency range 45...65 Hz
- frequency ± (0.02% of the range)
- active power ± (1% of the range) in frequency range 45...65 Hz
Additional errors in rated operating conditions:
- from ambient temperature changes (50% of basic error/10 K)
reheating time: 15 minuts
P
Measuring time: 0.5 s
Rated operating conditions:
- supply voltage: 230 V ± 10% a.c. (45...65 Hz)
- input voltage Un: 500 V a.c.
0...2...
40.0...500.0 Hz
- input current In: 63 A a.c. 0...45.0...500.0 Hz
- ambient temperature:
- storage temperature: -25...+85°C
- humidity: < 95% (condensation
- work position: any
- input signal: sinusoidal (THD
-10...23...55°C
inadmissible)
8%)
Page 15
- admissible peak factor 2
Readout field:
- display 4-digit LED
- digit height 8.5 mm
- color yellow
- indication range: -1999...9999
Ensured protection grade: IP 00 acc. to EN 60529
Overall dimensions: 110 x 53 x 60 mm
Weight: < 0.25 kg
Power:
- in supply input < 2 VA
- in voltage input < 0.2 VA
- in current input < 2.5 VA
Test voltage:
- voltage input 3.2 kV d.c.
- current input 3.2 kV d.c.
- power supply 2,1 kV d.c.
lectromagnetic compatibility:
E
- noise immunity acc. to EN 61000-6-2
- noise emission acc. to EN 61000-6-4
Sa
fety requirements acc. to EN 61010-1:
- isolation between circuits: basic,
- installation category III up to 300 V (II for 300 … 600 V),
- pollution grade 2,
15
Page 16
16
- maximal phase-to-earth working voltage:
- for the supply circuit 300 V,
- for the measuring input 600 V – cat. II (300 V – cat. III)
- altitude above sea level: < 2000 m.
7. ORDER CODES
PCE-N27D- XX X X
Version:
standard 00 custom-made* XX
L
anguage:
Polish P English E other* X
Acceptance
without extra quality inspection requirements 0 with an extra quality inspection certificate 1 acc. to customer’s request* X
only after agreeing with the manufacturer
*
tests:
Example of order: The code: PCE-N27D - 00 E 0 means:
00 – standard version, E – English language, 0 – without extra quality inspection requirements.
Loading...