PCE Instruments PCE-MTS500-DFG N 5K-KIT, PCE-MTS500, PCE-MTS500-DFG N 5K FD 300 KIT, PCE-MTS500-FD 300 KIT Users guide

Page 1
PCE Americas Inc. 711 Commerce Way Suite 8 Jupiter FL-33458 USA From outside US: +1 Tel: (561) 320-9162 Fax: (561) 320-9176 info@pce-americas.com
www.pce-instruments.com/english
www.pce-instruments.com
Test Stand for Force Gauge
PCE-MTS500
INSTRUCTION MANUAL
PCE Instruments UK Ltd.
Units 12/13
Southpoint Business Park
Ensign way
Hampshire / Southampton
United Kingdom, SO31 4RF
From outside UK: +44
Tel: (0) 2380 98703 0
Fax: (0) 2380 98703 9
info@pce-instruments.com
Page 2
CONTENTS
1.Function 1
2.Structure 1
3.Installation 2
4.Specification 2
5.Attention 3
6.Operation
7.Maintenance 3
8.Packing
List 3
3
Page 3
1.Function
3&(076 Electric Vertical Test Stand, applied in tension and compression test, is assembled with
2N-5kN) Series Force Gauge. The stand adopts double-column construction
( with good stability, wide application range and easy operation. Furthermore, it has advantages of non-polar speed adjustment, manual or automatic operation, suitable for fields of rubber & plastic products, textile, construction, complex material, wire & cables, auto accessories, engine and scientific research, etc. Note: When installing different force gauge, it should equip different backboard.
2.Structure
Small Backboard
Tighten Screw of
Up Slide Carriage
Up Limit Ring
Column
Up Slide Carriage
Up Limit Screw
Force Gauge Backboard
Down Slide Carriage
Down Limit Ring
Speed Knob
Power Lamp
Power Switch
Shift Button of Manual and Automatic Mode
POWER
OFF ON
SPEED CONTROL
HIGH
LOW
AUTO
MANUAL
410mm
Limit Switch
Lower Limit Screw
1040mm
Up Button
UP
STOP
DOWN
Stop Button
Power Socket
Down Button
260mm
1
Page 4
3.Installation of Force Gauge
M3 Screw
Force Gauge
Joint Bearing
M6 Haxangular Nut
Force Gauge
P
icture 1 Installation of
(Sensor Inside) Force Gauge
1
. When installing (Sensor Inside) Force Gauge, take out 4 pieces of M3 screws from toolbox,
Picture 2 Installa Force Gauge
Outside Backboard
tion of
Picture 3 Instal
Force Gauge(1kN-5kN)
Sensor
lation of
and through 4 deep hole of Small Backboard, tighten them into 4 installing hole on force gauge(Picture 1);
2. When installing Force Gauge, take off 4 pieces of M6 hexangular screws of back cover, and backboard. also take off Small Backboard on test stand;through 4 hole of Force Gauge backboard, tighten 4 pieces of M6 screws into insalling hole of Force Gauge by nut (Picture 2);
3. When installing (1kN-5kN) Force Gauge, it should equip the SJ-021 Outside Backboard. Loosen the 4 pieces of M6 hexangular screws, take off the SKN Backboard, fix the SJ-021 Backboard on the position of Force Gauge Backboard by the 4 screws;Take one of the joint axletree from sensor toolbox, and tighten the sensor through hole of backboard as showing in picture(Picture 3).
4. Specification
Capacity Measuring Stroke Measuring Speed Maximum Gap Work Voltage Rate Current Fuse of Main Circuit Fuse of Controlling Circuit Working Temperature Store & Delivery Temperature Relative Humidity
2
Page 5
5.Attention
A. Please do not take Up or Lower Limit Screw at any time to prevent screw mandrel from getting
out or damaging to other accessories.
B. When needing to move UP Slide Carriage for appropriate space, please pay attention:
1. Loosen the tighten screw at two side of Up Slide Carriage, during which it should support the
slide carriage by hands to avoid dropping down.
2. The Up Slide Carriage will not upper than the top of column, and lower than Up Limit Screw.
C. Operation
Examine Before Operation
A. Check Tighten Screw of Up Slide Carriage to be locked firmly; B. Turn on the power switch, then the power lamp will be light. C. Examine the stand whether there is abnormal sound when moving without load.
Manual Test
Choose the Manual mode by pressing Shift Button of Manual and Automatic Mode;Press Up or Down button all along, the test stand will work; Loosen the button, the test stand will stop work and finish test.
Automatic Test
Choose the Automatic mode by pressing Shift Button of Manual and Automatic Mode;Press Up or Down button once, the test stand will work; Press Stop button, the test stand will stop and finish test.
7.Maintenance
A. Please keep the environment clean and prevent liquid and metal scraps from entering
the engine box, otherwise electric shock may happen and driving components may be
damaged. B. Please keep the column and lower slide carriage hole clean. C. Add some lubricant to screw mandrel and gear after period of time. D. Please pull out power connector, and make the stand away from dust and moisture if it is
not used.
8.Packing List
Number
1
2
3
4
5
6
Parts Name
3&(076 Main Body
M10 Inner Hexagon Spanner
110/220V Power Wire
Manual
Qualification Certificate
Quantity
1
1
1
1
1
1
3
Loading...