Payne PG9YAA036060, PG9YAA048080, PG9YAA036080, PG9YAA060100 Installation Instructions Manual

PG9YAA
95% SINGLE STAGE DIRECT OR
NON---DIRECT VENT GAS FURNACE
UPFLOW / HORIZONTAL
Installation Instructions
Special Venting Requirements for Installations in Canada
Installation in Canada must conform to the requirements of CSA B149 code. Vent systems must be composed of pipe, fittings, cements, and primers listed to ULC S636. The special vent fittings and accessory concentric vent termination kits and accessory external drain trap have been certified to ULC S636 for use with those IPEX PVC vent components which have been certified to this standard. In Canada, the primer and cement must be of the same manufacturer as the vent system -- IPEX System 636, PVC/CPVC Primer, Purple Violet for Flue Gas Venting and IPEX System 636, PVC Cement for Flue Gas Venting, rated Class IIA, 65 deg C. must be used with this venting system -- do not mix primers and cements from one manufacturer with a vent system from a different manufacturer. Follow the manufacturer’s instructions in the use of primer and cement and never use primer or cement beyond its expiration date.
The safe operation, as defined by ULC S636, of the vent system is based on following these installation instructions, the vent system manufacturer’s installation instructions, and proper use of primer and cement. All fire stop and roof flashing used with this system must be UL listed material. Acceptability under Canadian standard CSA B149 is dependent upon full compliance with all installation instructions. Under this standard, it is recommended that the vent system be checked once a year by qualified service personnel.
The authority having jurisdiction (gas inspection authority, municipal building department, fire department, etc) should be consulted before installation to determine the need to obtain a permit.
Consignes spéciales pour l’installation de ventillation au Canada
L’installation faite au Canada doit se conformer aux exigences du code CSA B149. Ce systême de ventillation doit se composer de tuyaux, raccords, ciments et apprêts conformes au ULC S636. La tuyauterie de ventillation des gaz, ses accessoires, le terminal concentrique mural ainsi que l’ensemble du drain de condensat extérieur ont été certifiés ULCS 636 pour l’application des composantes IPEX PVC qui sont certifiées à ce standard. Au Canada l’apprêt et le ciment doivent être du même manufacturier que le systême de ventillation -- IPEX Système 636, Apprêt PVC/CPVC. Mauve Violette pour conduit en évacuation des gaz et IPEX Système 636, ciment pour PVC pour conduit en évacuation des gaz, évalué CLASSEIIA,65deg.C.doitëtre utilisé avec ce systèeme d’évacuation -- ne pas mélanger l’apprêt et le ciment d’un manufacturier avec le systême de ventillation d’un autre manufacturier. Bien suivre les indications du manufacturier lors d e l’utilisation de l’apprêt et du ciment et ne pas utiliser ceux--ci si la date d’expiration est atteinte.
L’opération sécuritaire, tel que définit par ULC S636, du système de ventilation est basé sur les instructions d’installation suivantes, ainsi que l’usage approprié de l’apprêt et ciment. Tout arrët feu et solin de toit utilisés avec ce système doivent être des matériaux listés UL. L’acceptation du standard Canadien CSA B419 est directement relié à l’installation conforme aux instructions ci-­haut mentionnées. Le standard Canadien recommande l’ inspection par un personel qualifié et ce, une fois par année.
Les autoritées ayant juridiction (inspecteurs de gas, inspecteurs en bâtiments, département des incendies, etc) devraient être consultées avant l’installation afin de déterminer si un permis est requis.
1
PG9YAA
Required Notice for Massachusetts Installations
IMPORTANT
The Commonwealth of Massachusetts requires compliance with regulation 248 CMR as follows:
5.08: Modifications to NFPA--54, Chapter 10
2) Revise 10.8.3 by adding the following additional requirements: a. For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used
in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back--up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or h ard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building o r structure served by the side wall horizontal vented gas fueled equipment. It shall b e the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors
a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard
wired carbon monoxide detector with alarm and battery back--up may be installed o n the next adjacent floor level.
b. In the event that the requirements of this subdivision can not be met at the time of completion o f installation, the owner
shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.
2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in p rint size no less than one--half (1/2) inch in size, ”GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.
4. INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.
5. EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:
(1.) The equipment listed in Chapter 10 entitled ”Equipment Not Required To Be Vented” in the most current edition of
NFPA 54 as adopted by the Board; and
(2.) Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from
the dwelling, building or structure used in whole or in part for residential purposes.
c. MANUFACTURER REQUIREMENTS -- GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the
manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
1. Detailed instructions for the installation of the venting system design or the venting system components; and
2. A complete parts list for the venting system design or venting system.
d. MANUFACTURER REQUIREMENTS -- GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When
the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems”, the following requirements shall be satisfied by the manufacturer:
1. The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and
2. The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.
e. A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled
equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.
2
START--UP CHECK SHEET
For 95% Furnace
(This sheet is optional. Keep this page for future reference.)
Date of Start--Up:
Dealer Name:
Address:
City, State(Province), Zip or Postal Code:
Phone:
Owner Name:
Address:
City, State(Province), Zip or Postal Code:
Model Number:
Serial Number:
Setup Checks
Check the box when task is complete
Calculated Firing Rate:(See Checks and Adjustments
Section).
Heating Check
Measured Line Pressure when Firing Unit:
Measured Manifold Gas Pressure:
Temperature of Supply Air: (°)
Temperature of Return Air: (°)
Temperature Rise (supply--return temperature):(°)
In Rise (see furnace rating plate)? (°)
Static Pressure (Ducts): Supply Air Return
Which blower speed tap is used? (Heating)
Optional Check: CO ? CO2 ?
Cooling Check
Temperature of Supply Air: (°)
PG9YAA
All Electrical Connections Tight?
Have hoses been relocated for furnace application
(upflow/horizontal)?
Condensate Drain Connected?
Condensate Drain Trapped?
Manual Gas Shut --Off Upstream of
Furnace/Drip--Leg?
Gas Valve turned ON?
Type of Gas: Natural: Propane:
Filter Type and Size:
Temperature of Return Air: (°)
Temperature Difference: (°)
Static Pressure (Ducts) cooling: Supply Air Return
Blower Speed Tap used for cooling: _______
Dealer Comments:
3
NOTE: Read the entire instruction manual before starting the installation.
NOTE: Please retain these instructions with the furnace after installation for future reference.
ama
CERTIFIED
SAFETY CONSIDERATIONS
!
CAUTION
FURNACE RELIABILITY HAZARD
PG9YAA
Improper installation or misapplication of furnace may require excessive servicing or cause premature component failure.
Application of this furnace should be indoors with special attention given to vent sizing and material combustion air requirements, gas input rate, air temperature rise, unit leveling, and unit sizing.
!
WARNING
These instructions cover the minimum requirements and conform to existing national standards and safety codes. In some instances, these instructions exceed certain local codes and ordinances, especially those that may not have kept up with changing residential construction practices. We require these instructions as a minimum for a safe installation.
Wear safety glasses and work gloves. Have a fire extinguisher available during start--up and adjustment procedures and service calls.
Recognize safety information. This is the safety--alert symbol
. When you see this symbol on the furnace and in instructions
or manuals, be alert to the potential for personal injury. Understand the signal words DANGER, WARNING, and
CAUTION. These words are used with the safety--alert symbol. DANGER identifies the most serious hazards which will result in severe personal injury or death. WARNING signifies a hazard which could result in personal injury or death. CAUTION is used to identify unsafe practices which may result in minor personal injury or product and property d amage. NOTE is used to highlight suggestions which will result in enhanced installation, reliability, or operation.
!
CAUTION
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing and gloves when handling parts.
FIRE, EXPLOSION, ELECTRICAL SHOCK AND CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
Improper installation, adjustment, alteration, service, maintenance, or use can cause carbon monoxide poisoning, explosion, fire, electrical shock, or other conditions which may cause personal injury or property damage. Consult a qualified installer, service agency, local gas supplier, or your distributor or branch for information or assistance. The qualified installer or agency must use only factory--authorized and listed kits or accessories when modifying this product.
Installing and servicing heating equipment can be hazardous due to gas and electrical components. Only trained and qualified
personnel should install, repair, or service heating equipment.
Untrained personnel can perform basic maintenance functions such as cleaning and replacing air filters. All other operations must be performed by trained service personnel. When working on heating equipment, observe precautions in literature, o n tags, and on labels attached to or shipped with unit and other safety precautions that may apply.
TABLE OF CONTENTS
PAGE
IMPORTANT INFORMATION 2.........................
SAFE INSTALLATION REQUIREMENTS 5...............
COMBUSTION & VENTILATION AIR 10.................
CONCENTRIC TERMINATION 30.......................
GAS SUPPLY & PIPING 32.............................
ELECTRICAL WIRING 35..............................
DUCTWORK & FILTER 36.............................
CHECKS & ADJUSTMENTS 38.........................
FURNACE MAINTENANCE 40.........................
SEQUENCE OF OPERATION & DIAGNOSTICS 40.........
4
SAFE INSTALLATION
REQUIREMENTS
!
WARNING
FIRE, EXPLOSION, AND ASPHYXIATION HAZARD
Failure to follow this warning could result in personal injury or death.
Improper adjustment, alteration, service, maintenance or installation could cause personal injury , death and/or property damage.
Installation or repairs made by unqualified persons could result in hazards to you and others. Installation MUST conform to local codes or, in the absence of local codes, with codes of all governmental authorities having jurisdiction.
The information contained in this manual is intended for use by a qualified service agency that is experienced in such work, is familiar with all precautions and safety procedures required in such work, and is equipped with the proper tools and test instruments.
NOTE: This furnace is design--certified by the CSA International (formerly AGA and CGA) for installation in the United States and Canada. Refer to the appropriate codes, along with this manual, for proper installation.
S Use only the type of gas approved for this furnace (see Rating
Plate on unit). Overfiring will result in failure of heat
exchanger and cause dangerous operation. (Furnaces can be
converted to Propane gas with approved kit.)
S Install this furnace only in a location and position as specified
in “Installation” of these instructions.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Do NOT install this furnace in DOWNFLOW applications.
S Provide adequate combustion and ventilation air to the furnace
as specified in “ Combustion and Ventilation Air” of these
instructions.
S Combustion products must be discharged outdoors. Connect
this furnace to an approved vent system only, as specified in
Vent and Combustion Air Piping” of these instructions.
S Never test for gas leaks with an open flame. Use a
commercially available soap solution made specifically for the
detection of leaks to check all connections, as specified in
Gas Supply and Piping, Final Check” of these instructions.
S Always install furnace to operate within the furnace’s intended
temperature--rise range with a duct system which has an
external static pressure within the allowable range, as specified
in “Technical Support Manual” of these instructions. See
furnace rating plate.
S When a furnace is installed so that supply ducts carry air
circulated by the furnace to areas outside the space containing
the furnace, the return air shall also be handled by a duct(s)
sealed to the furnace casing and terminating outside the space
containing the furnace.
S A gas--fired furnace for installation in a residential garage must
be installed as specified in “Installation” of these instructions.
S This furnace is not to be used for temporary h eating of
buildings or structures under construction.
S This furnace is NOT approved for installation in mobile
homes, trailers or recreation vehicles.
S Seal around supply and return air ducts.
S Install correct filter type and size.
S Unit MUST be installed so electrical components are protected
from direct contact with water.
Safety Rules
Your unit is built to provide many years of safe and dependable service providing it is properly installed and maintained. However, abuse and/or improper use can shorten the life of the unit and create hazards for you, the owner.
The U.S. Consumer Product Safety Commission encourages installation of carbon monoxide alarms. There can be various sources of carbon monoxide in a building or dwelling. The sources could be gas--fired clothes dryers, gas cooking stoves, water heaters, furnaces, gas--fired fireplaces, wood fireplaces.
Carbon monoxide can cause bodily injury and/or death. Carbon monoxide or “CO” is a colorless and odorless gas produced when fuel is not burned completely or when the flame does not receive sufficient oxygen.
Therefore, to help alert people of potentially dangerous carbon monoxide levels, you should have a commercially available carbon monoxide alarm that is listed by a nationally recognized testing agency in accordance with Underwriters Laboratories Inc. Standard for Single and Multiple Station Carbon Monoxide Alarms, ANSI/UL 2034 or the CSA 6.19--01 Residential Carbon Alarming Devices installed and maintained in the building or dwelling concurrently with the gas--fired furnace installation (see Note below). The alarm should be installed as recommended by the alarm manufacturer’s installation instructions.
There can be numerous sources of fire or smoke in a building or dwelling. Fire or smoke can cause bodily injury, death, and/or property damage. Therefore, in order to alert people of potentially dangerous fire or smoke, you should have fire extinguisher and smoke alarms listed by Underwriters Laboratories installed and maintained in the building or dwelling (see Note below).
NOTE: The manufacturer of your furnace does not test any alarms and makes no representations regarding any brand or type of alarms.
To ensure safe and efficient operation of your unit, you should d o the following:
1. Thoroughly read this manual and labels on the unit. This will help you understand how your unit operates and the hazards involved with gas and electricity.
2. Do not use this unit if any part has been under water. Immediately call a qualified service technician to inspect the unit and to replace any part of the control system and any gas control which has been under water.
3. Never obstruct the vent grilles, or any ducts that provide air to the unit. Air must be provided for proper combustion and ventilation of flue gases.
PG9YAA
5
Frozen Water Pipe Hazard
Installation
!
WATER DAMAGE TO PROPERTY HAZARD
Failure to follow this caution may result in property d amage.
Do not leave your home unattended for long periods during freezing weather without turning off water supply and draining water pipes or otherwise protecting against the risk of frozen pipes and resultant damage.
Your furnace is designed solely to provide a safe and comfortable living environment. The furnace is NOT designed to ensure that water pipes will not freeze. It is equipped with several safety devices that are designed to turn the furnace off and prevent it from restarting in the event of various potentially unsafe conditions.
If your furnace remains off for an extended time, the pipes in your home could freeze and burst, resulting in water damage.
PG9YAA
If the structure will be unattended during cold weather you should take these precautions.
1. Turn off the water supply to the structure and drain the wa­ter lines if possible and add an antifreeze for potable water to drain traps and toilet tanks. Open faucets in appropriate areas.
2. Have someone check the structure frequently during cold weather to make sure it is warm enough to prevent pipes from freezing. Instruct them on a service agency to call to provide service, if required.
3. Install a reliable remote sensing device that will notify somebody of freezing conditions within the home.
CAUTION
-- o r --
-- o r --
Winter Shutdown
If you go away during the winter months and do not leave the heat on in your home, the plastic transition box and the condensate trap on the furnace must be protected from freeze damage. (See Fig. 10 through Fig. 17)
1. Disconnect the fitting that is located downstream of the combustion blower. Insert a funnel into the hose and pour four(4) ounces of sanitary type (RV) antifreeze into the condensate trap. Reconnect the vent drain fitting. Secure with the hose clamp.
2. Disconnect the trap. Insert a funnel into the hose and and pour four(4) ounces of sanitary type (RV) antifreeze into the plastic Transition box. Squeeze the hose together near the end and quickly reconnect the the condensate trap. Secure with the hose clamp.
When you return home, your furnace will be ready to start, as it is not necessary to drain the antifreeze from the furnace.
5
/8″ OD rubber hose from the vent drain
5
/8″ OD rubber hose to the stub on the
3
/4″ OD rubber hose from the condensate
3
/4″ OD rubber hose to the stub on
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
This furnace can NOT be common vented or connected to any type B, BW or L vent or vent connector, nor to any portion of a factory--built or masonry chimney. If this furnace is replacing a previously common-vented furnace, it may be necessary to resize the existing vent and chimney to prevent oversizing problems for the other remaining appliance(s). See Venting and Combustion Air Check in Gas Vent Installation section. This furnace MUST be vented to the outside.
Location and Clearances
1. Refer to Fig. 1 for typical installation and basic connecting parts required. Refer to Fig. 4 for typical horizontal direct vent installation and basic connecting parts required. Sup­ply and return air plenums and duct are also required.
2. If furnace is a replacement, it is usually best to install the furnace where the old one was. Choose the location or evaluate the existing location based upon the minimum clearance and furnace dimensions (Fig. 2).
Aluminum or non- rusting shield recommended. (See Vent Termination Shielding for dimensions).
*8Min. 20Max. in same atmospheric zone
Vent Pipes MUST be supported Horizontally and Vertically
*
Increase minimum from 8to 18for cold climates (sustained temperatures 0 ° F
and below for 24 or more consecutive hours).
Fig. 1 -- Typical Upflow Installation
DISCHARGE AIR
Inlet Pipe (not used on Single Pipe model)
Coupling on ends of exhaust pipe. Total pipe & coupling out­side structure = 8
*8Min. 20Max. in same atmospheric zone
A07700
6
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Do NOT operate furnace in a corrosive atmosphere containing chlorine, fluorine or any other damaging chemicals, which could shorten furnace life.
Refer to Combustion & Ventilation Air section, Contaminated Combustion Air for combustion air evaluation and remedy.
!
FROZEN AND BURST PIPE HAZARD
Failure to follow this caution may result in property d amage.
Special precautions MUST be made is installing furnace in an area which may drop below freezing. This can cause improper operation or damage to equipment. If furnace environment has the potential of freezing, the drain trap and drain line must be protected. The use of electric heat tape or RV antifreeze is recommended for these installations. (See “Condensate Trap Freeze Protection Section”)
Do NOT operate furnace in a corrosive atmosphere containing chlorine, fluorine or any other damaging chemicals. Refer to Combustion & Ventilation Air section,
Contaminated Combustion Air.
CAUTION
Installation Requirements
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Do NOT install this furnace in DOWNFLOW applications.
1. Install furnace level.
2. This furnace is NOT to be used for temporary heat of buildings or structures under construction.
3. Install the vent pipes as short as practical. (See Gas Vent Installation section).
4. Do NOT install furnace directly on carpeting, tile or other combustible material other than wood flooring.
5. Maintain clearance for fire safety and servicing. A front clearance of 24(609.6 mm) required and 30(762.0 mm)recommended for access to the burner, controls and filter. See clearance requirements in Fig. 2.
6. Use a raised base if the floor is damp or wet at times.
7. Residential garage installations require:
S Burners and ignition sources installed at least 18″ above the
floor.
S Furnace must be located or physically protected from possible
damage by a vehicle.
8. If the furnace is to be suspended from the floor joists in a basement or a crawl space or the rafters in an attic, it is necessary to use steel pipe straps or an angle iron frame to
attach the furnace. These straps should be attached to the furnace with sheet metal screws and to the rafters or joists with bolts. The preferred method is to use an angle iron frame bolted to the rafters or joists.
9. Local codes may require a drain pan under the entire fur­nace and condensate trap when the furnace is installed in attic application.
This furnace may be used for construction heat provided that all the following conditions are met:
S The furnace is permanently installed with all electrical wiring,
piping, venting and ducting installed according to these
installation instructions. A return air duct is provided, sealed
to the furnace casing, and terminated outside the space
containing the furnace. This prevents a negative pressure
condition as created by the circulating air blower, causing a
flame rollout and/or drawing combustion products into the
structure.
S The furnace is controlled by a thermostat. It may not be “hot
wired” to provide heat continuously to the structure without
thermostatic control.
S Clean outside air is provided for combustion. This is to
minimize the corrosive effects of adhesives, sealers and other
construction materials. It also prevents the entrainment of
drywall dust into combustion air, which can cause fouling and
plugging of furnace components.
S The temperature of the return air to the furnace is maintained
between 55° F(13° C) and 80° F(27° C) , with no evening
setback or shutdown. The use of the furnace while the
structure is under construction is deemed to be intermittent
operation per our installation instructions.
S The air temperature rise is within the rated rise range on the
furnace rating plate, and the firing rate has been set to the
rating plate value.
S The filters used to clean the circulating air during the
construction process must be either changed or thoroughly
cleaned prior to occupancy.
S The furnace, ductwork and filters are cleaned as necessary to
remove drywall dust and construction debris from all HVAC
system components after construction is completed.
S After construction is complete, verify furnace operating
conditions including ignition, input rate, temperature rise and
venting according to these instructions.
Knockouts
!
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate clothing, safety glasses and gloves when handling parts and servicing furnaces.
Use a hammer and screwdriver to strike a sharp blow (See Fig. 3) directly to the knockout tie points or use a hammer in the upper left corner of the desired knockout. Remove any burrs and sharp edges.
CAUTION
PG9YAA
7
PG9YAA
21/
4
131/
4
17/
8
D
C
Unit
Ca pacity
PG9YAA036060
PG9YAA036080
PG9YAA048080
PG9YAA060100
F
AIR INTAKE
VENT
TOP
H
G
E
811/
LEFT SIDE
TRAP (KO) (COUNTERFLOW)
GAS
16
11/
4
ELECTRICAL
11/
16
VENT
AIR INTAKE (KO) (ALTERNATE)
TRAP (KO) UPFLOW/HORIZONTAL
THERMOSTAT
(KO)
215/
13
/
4
16
13/
8
7
11
1
7
/
8
4
8
283/
241/
16
175/
16
/
16
24
Drawing is representative, but some models may vary
BOTTOM
ALL DIMENSIONS IN INCHES
231/
8
Cabinet Bottom Top
ABC DEFGH
191/8175/821/8143/443/841/221/291/
223/4211/4115/16183/443/841/225/8113/
223/4211/4115/16183/443/841/225/8113/
241/2237/
23 43/841/221/4121/
16
37/
8
1IN=25.4MM
297/
4
3111/
8
1311/
16
1913/
MINIMUM CLEARANCES TO
COMBUSTIBLE MATERIALS FOR ALL UNITS
REAR 0
FRONT (combustion air openings in furnace and in structure)
A
B
Required For Service
ALL SIDES Of SUPPLY PLENUM 1
3
*
24
SIDES 0
VENT 0
FRONT
16
TOP OF FURNACE 1
*
30clearance recommended for furnace removal.
Horizontal position: Line contact is permissible only between lines formed by intersections of top and two sides of furnace jacket, and building joists, studs or framing.
NOTE: Evaporator “A” coil drain pan dimensions
16
may vary from furnace duct opening size. Always consult evaporator specifications for duct size requirements.
Furnace is designed for bottom return or side return.
Return air through back of furnace is NOT allowed.
1
/
1
4
27/
8
281/
2
181/
5
4
/
16
23/
8
11/
16
GAS
2
8
8
4
13/
16
297/
913/
16
3311/
16
8
273/
16
215/
8
175/
413/
16
111/
16
7
16
111/
16
RIGHT SIDE
TRAP (COUNTERFLOW)
ELECTRICAL (KO)
VENT (KO)
TRAP (KO) UPFLOW/HORIZONTAL
THERMOSTAT
2
AIR INTAKE (KO) (ALTERNATE)
21/
1
/
19
4
4
(KO)
3
/
TYP.
40
4
KO = Knockout
Specifications are subject to change without notice
Fig. 2 -- Dimensions and Clearances
8
47/
8
215/
8
17/
8
24
A07701
A07702
Fig. 3 -- Hammer and Screwdriver used for Knockout
NOTE: If a knockout does not come out after two sharp blows,
pull and snip as needed to remove the knockout.
Installation Positions
This furnace can be installed in an upflow or horizontal (either left or right) airflow position. DO NOT install this furnace in the downflow position or on its back. For the upflow position, the return air ductwork can be attached to either the left or right side panel and/or the bottom. For horizontal positions, the return air ductwork must be attached to the bottom:
!
WARNING
ULC--S636. ULC--S636 certified plastic vent system material or the components of ULC--S636 certified vent systems must not be interchanged with other vent systems or unlisted pipe/fittings. Vent components supplied with the furnace and components in factory authorized vent kits may be used with ULC--S636 certified vent systems.
The ULC--S636 certified plastic components, and specified primers and glues of the certified system must be from a single system manufacturer and not intermixed with other system manufacturer’s vent system parts.
The first 3 ft. (900 mm) of the venting system must be readily accessible for inspection.
In some provinces the combustion air system may also be required to be ULC--S636 certified.
The vent and combustion air pipes attach to the furnace through the top panel or to the alternate locations on the furnace side panels.
Note: Repositioning of the combustion blower is required for the vent pipe connection to the furnace through the “right side” panel. See “Vent and Combustion Air Piping” sectio n for further details.
Horizontal Furnace Installation
Inlet Pipe (not used on Single Pipe model)
Vent Pipe
PG9YAA
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Do NOT install this furnace in DOWNFLOW applications.
Furnace Installation Considerations
The installation of the furnace for a given application will dictate the position of the furnace, the airflow, ductwork connections, vent and combustion air piping. Consideration must be given to the following:
Condensate Trap and Drain Lines
The supplied condensate trap must be attached to the furnace side panel on either the left or right side. For horizontal installations, the drain trap is vertically attached to the side panel below the furnace. A minimum clearance of 6below the furnace is required for the condensate trap. Downward slope of the condensate drain line from the condensate trap to the drain location must be provided. Adequate freeze protection of the drain trap and the drain line must be provided. See “Condensate Drain Trap” section for further details.
Leveling
Proper leveling of the furnace must be provided to insure proper drainage of the condensate from the furnace. The furnace must be level to within side for upflow installations or top to bottom for horizontal installations.
1
/4″ (6.35 mm) from front to back and from side to
Vent and Combustion Air Connections
For venting information literature, contact www.cac--bdp.com with the complete model and serial number of the furnace.
NOTE: Furnaces installed in Canada must use vent systems that are certified to the standard for Type BH Gas Venting Systems,
Condensate Trap
NOTE: 6
bottom clearance required for condensate trap.
A07703
Fig. 4 -- Typical Horizontal Installation
This furnace can be installed horizontally in an attic, basement, crawl space, alcove, or suspended from a ceiling in a basement or utility room. See Fig. 4.Donotinstall furnace on its back or in the reverse airflow positions as safety control operation will be adversely affected.
If the furnace is to be installed in a crawl space, consult local codes. A suitable concrete pad or blocks are recommended for crawl space installation on the ground.
NOTE: 6bottom clearance required for condensate trap. Twenty four (24) inches between the front of the furnace and
adjacent construction or other appliances MUST be maintained for service clearance.
Keep all insulating materials clear from louvered door. Insulating materials may be combustible.
The horizontal furnaces may be installed directly on combustible wood flooring or supports as long as all required furnace clearances are met. See Fig. 4.
9
Gas Vent
Ventilated Attic
Top Above Insulation
Outlet Air (1)
This installation NOT approved in Canada
Gable Vent
Alternate Inlet Air (1)
Soffit Vent
Gas Vent
Ventilated Attic
Top Above Insulation
Gable Vent
Outlet Air (1)
Gas Vent
Outlet Air (2)
Ventilated Crawl Space
alternate Inlet Air (1)
Inlet Air (1)
PG9YAA
(This is ONLY a guide. Subject to codes of country having jurisdiction).
This furnace MUST NOT be installed directly on carpeting or tile or other combustible material other than wood flooring or supports.
COMBUSTION & VENTILATION AIR For Single Pipe Installation
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Use methods described here to provide combustion and ventilation air.
OutletAir (1)
Fig. 5 -- Outside Air
For horizontal installation over a finished living space. A field fabricated auxiliary drain pan with drain p ipe is required to prevent damage by overflow due to blocked condensate drain.
Check” in this section. This furnace MUST be vented to the outside.
When the installation is complete, check that all appliances have adequate combustion air and are venting properly. See Venting And Combustion Air Check in “Gas Vent Installation” Section in this manual.
Outdoor Combustion Air Method
A space having less than 50 cubic feet per 1,000 BTUH input rating for all gas appliances installed in the space requires outdoor air for combustion and ventilation.
Soffit Vent
Inlet Air (2)
Inlet Air (1)
Minimum One Inlet and One Outlet Air Supply is Required MaybeinanyCombinationShown
Inlet Air Opening Must be Within12of floor
Outlet Air Opening Must be Within12of ceiling
(1) 1 Square Inch per 4000 BTUH
(2) 1 Square Inch per 2000 BTUH
Inlet Air (2)
A07704
Furnaces require ventilation openings to provide sufficient air for proper combustion and ventilation of flue gases. All duct or openings for supplying combustion and ventilation air must comply with the gas codes, or in the absence of local codes, the applicable national codes.
Combustion and ventilation air must be supplied in accordance with one of the following:
NOTE: The Combustion & Ventilation Air Section in this document, uses tables and information from the ANSI Z223.1/NFPA 54. For use in Canada, u se CSA B149.1 for this information.
1. Section 9.3, Air for Combustion and Ventilation, of the National Fuel Gas Code, (NFGC), ANSI Z223.1--2006/NFPA 54 --2006 in the U.S.,
2. Sections 8.2, 8.3, 8.5, 8.6, 8.7, and 8.8 of National Stand­ard of Canada, Natural Gas and Propane Installation Code (NSCNGPIC), CSA B149.1--05 in Canada,
3. Applicable provisions of the local building code.
This furnace can NOT be common vented or connected to any type B, BW or L vent or vent connector, nor to any portion of a factory-- built or masonry chimney. Multistory venting is NOT permitted. If this furnace is replacing a p reviously common-vented furnace, it may be necessary to resize the existing vent and chimney to prevent oversizing problems for the other remaining appliance(s). See “Venting and Combustion Air
Air Openings and Connecting Ducts
1. Total input rating for all gas appliances in the space MUST be considered when determining free area of open­ings.
2. Connect ducts or openings directly to the outdoors.
3. When screens are used to cover openings, the openings MUST be no smaller than
1
/4″ (6.35 mm) mesh.
4. The minimum dimension of air ducts MUST NOT be less than 3″ .
5. When sizing a grille, louver, or screen use the free area of opening. If free area is NOT stamped or marked on grill or louver, assume a 20% free area for wood and 60% for met­al. Screens shall have a mesh size not smaller than
1
/4″
(6.35 mm) .
Confined Space Installation
NOTE: A confined space is defined as an area with less than 50 cubic feet per 1,000 BTUH input rating for all gas appliances installed in the area.
Requirements
1. Provide the space with sufficient air for proper combustion and ventilation of flue gases using horizontal or vertical ducts or openings.
10
2. Fig. 5 illustrates how to provide combustion and ventila­tion air when two permanent openings, one inlet and one outlet, are used.
f. One opening MUST commence within 12of the floor
and the second opening MUST commence within 12
of the ceiling. g. Size openings and ducts per Ta ble 1 . h. Horizontal duct openings require 1 square inch of free
area per 2,000 BTUH (1,100 mm
input for all gas appliances in the space (see Ta ble 1 ) .
i. Vertical duct openings or openings directly communic-
ating with the outdoors require 1 square inch of free
area per 4,000 BTUH (550 mm
input of all gas appliances in the space (see Ta ble 1 ) .
3. When one permanent outdoor opening is used, the opening requires:
a. 1 sq. in of free area per 3,000 BTUH (700 mm
for combined input of all gas appliances in the space (see Table 1) and
b. not less than the sum of the areas of all vent connect-
ors in the space.
BTUH
Input
Rating
60,000 30 sq. in. 20 sq. in. 15 sq. in. 5
80,000 40 sq. in. 26.7 sq. in. 20.0 sq. in. 5
100,000 50 sq. in. 33.3 sq. in. 25 sq. in. 6
EXAMPLE: Determining Free Area
Furnace 100,000 Furnace 100,000
Two Horizontal Ducts
(sq. in./2,000 BTUH)
Water Heater
+
+
30,000
Water Heater
30,000
2
/kW) of combined
2
/kW) for combined
2
Minimum Free Area Required for Each Opening or Duct to Outdoors
=
=
/kW)
Single Opening
(sq. in./3,000 BTUH)
Total Input
(130,000 ÷ 4,000)
Total Input
(130,000 ÷ 2,000)
The opening shall commence within 12of the top of the enclosure. Appliances shall have clearances of at least 1from the sides and back and 6from the front. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces (crawl or attic) that freely communicate with the outdoors.
4. Combination of Indoor and Outdoor Air shall have: a. Indoor openings that comply with the Indoor Com-
bustion Air Method below and
b. Outdoor openings located as required in the Outdoor
Combustion Air Method above and
c. Outdoor openings sized as follows.
(3.) Calculate the Ratio of all Indoor Space volume
divided by required volume for Indoor Combus- tion Air Method.
(4.) Outdoor opening size reduction Factor is 1 minus
the Ratio in 1) above.
(5.) Minimum size of Outdoor openings shall be the
size required in Outdoor Combustion Air Me th­od above multiplied by reduction Factor.
Two Vertical Ducts or Openings
(sq. in./4,000 BTUH)
= 32.5 Sq. In. Vertical
= 65 Sq. In. Horizontal
PG9YAA
Round Duct
(sq. in. /4,000 BTUH)
T able 1 – Free Area
Indoor Combustion Air (Unconfined Space)
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Most homes will require additional air from outdoors for combustion and ventilation. A space with at least 50 cubic feet per 1,000 Btuh Input rating or homes with tight construction may need outdoor air, supplied through ducts, to supplement air infiltration for proper combustion and ventilation of flue gasses.
Standard and Known- Air- Infiltration Rate Methods
© NFPA&AGA
Indoor air is permitted for combustion and ventilation, if the Standard or Known--Air--Infiltration Rate Method is used.
The Standard Method may be used, if the space has no less volume than 50 cubic feet per 1,000 BTUH input rating for all
gas appliances installed in the space. The standard method permits indoor air to be used for combustion and ventilation air.
The Known Air Infiltration Rate Method shall be used if the infiltration rate is known to be less than 0.40 air changes per hour (ACH) and equal to or greater than 0.10 ACH. Infiltration rates greater than 0.60 ACH shall not be used. The minimum required volume of the space varies with the number of ACH and shall be determined per Ta b le 2 or Equations 1 and 2. Determine the minimum required volume for each appliance in the space, and add the volumes together to get the total minimum required volume for the space.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to supply additional air by means of ventilation grilles or ducts could result in personal injury or death.
An unconfined space or homes with tight construction may not have adequate air infiltration for proper combustion and ventilation of flue gasses. Most homes will require additional air.
11
Other Than Fan-Assisted Total
(1,000 Btuh)
ACH 30 40 50 50 75 100 125
0.60 1,050 1,400 1,750 1,250 1,875 2,500 3,125
0.50 1,260 1,680 2,100 1,500 2,250 3,000 3,750
0.40 1,575 2,100 2,625 1,875 2,813 3,750 4,688
0.30 2,100 2,800 3,500 2,500 3,750 5,000 6,250
0.20 3,150 4,200 5,250 3,750 5,625 7,500 9,375
0.10 6,300 8,400 10,500 7,500 11,250 15,000 18,750
0.00 NP NP NP NP NP NP NP
Table 2 – Minimum Space Volume for 100% Combustion and Ventilation Air from Indoors (ft3)
Fan- assisted Total (1,000’s Btuh)
NP = Not Permitted NO TAG Minimum Space Volumes were determined by using
the following equations from the National Fuel Gas Code ANSI Z223.1/NFPA 54--2006, 9.3.2.2:
1. For appliances other than fan--assisted appliances (such
PG9YAA
as a draft hood--equipped water heater), calculate using the following equation:
(
1000 Btu / hr
(
1000 Btu / hr
I
other
I
fan
3
Required Volume
2. For fan--assisted appliances (such as this furnace), calcu- late using the following equation:
Required Volume
where:
I
= all appliances other than fan--assisted input in Btu
other
per hour
I
= fan--assisted appliance input in Btu per hour
fan
ACH = air change per hour (percent of volume of space
exchanged per hour, expressed as a decimal)
3. For purposes of this calculation, an infiltration rate greater than 0.60 ACH shall not be used in the equations above.
The following requirements apply to the Standard Method and to the Known Air Infiltration Rate Method.
S Adjoining rooms can be considered part of a space, if there are
no closeable doors between rooms.
S Combining spaces on the same story. Each opening shall have
a minimum free area of at least 1 in.
2
/kW) of the total input rating of all appliances in the space
mm
but not less than 100 in.
commence within 12 in. (304.8 mm) of the top, and one
opening shall commence within 12 in. (304.8 mm) of the
bottom, of the enclosure. The minimum dimension of air
openings shall not be less than 3 in. (76.2 mm).
S Combining spaces in different stories. The volumes of spaces
on different stories shall be considered as communicating
spaces where such spaces are connected by one or more
openings in doors or floors having a total minimum free area of
2
2in.
/1,000 BTUH (4,400 mm2/kW) of total input rating of all
appliances.
S An attic or crawl space may be considered a space that freely
communicates with the outdoors provided there are adequate
ventilation openings directly to outdoors. Openings MUST
remain open and NOT have any means of being closed off.
other
fan
21 ft
²
ACH
3
15 ft
²
ACH
2
/1,000 BTUH (2,200
2
(0.06 m2). One opening shall
)
)
Ventilation openings to outdoors MUST be at least 1 square
2
inch of free area per 4,000 BTUH (550 mm
rating for all gas appliances in the space.
S In spaces that use the Indoor Combustion Air Method,
infiltration should be adequate to provide air for combustion,
ventilation and dilution of flue gases. However, in buildings
with unusually tight construction, additional air MUST be
provided using the methods described in section titled Outdoor
Combustion Air Method:
S Unusually tight construction is defined as Construction with:
1. Walls and ceilings exposed to the outdoors have a continu­ous, sealed vapor barrier. Openings are gasketed or sealed and
2. Doors and openable windows are weather stripped and
3. Other openings are caulked or sealed. These include joints around window and door frames, between sole plates and floors, between wall--ceiling joints, between wall panels, at penetrations for plumbing, electrical and gas lines, etc.
/kW) of total input
Ventilation Air
Some provincial codes and local municipalities require ventilation or make--up air be brought into the conditioned space as replacement air. Whichever method is used, the mixed return air temperature across the heat exchanger MUST not fall below 60° so that flue gases will not condense excessively in the heat exchanger. Excessive condensation will shorten the life of the heat exchanger and possibly void your warranty.
Venting and Combustion Air Check
NOTE: If this installation replaces an existing furnace from a commonly vented system, the original venting system may no longer be sized to properly vent the attached appliances. An improperly sized venting system may cause the formation of condensate in the vent and the leakage or spillage of vent gases. To make sure there is adequate combustion air for all appliances, MAKE THE FOLLOWING CHECK.
Vent Pipe
Typical Gas Water Heater
Fig. 6 -- Vent Check
Draft Hood
Match
A07688
12
The following information is supplied to allow the installer to make adjustments to the setup of existing appliances, IF REQUIRED, based on good trade practices, local codes, and good judgement of the installer. Manufacturer does NOT take responsibility for modifications made to existing equipment.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation, could result in carbon monoxide poisoning or death:
The following steps shall be followed for each appliance connected to the venting system being placed into operation, while all other appliances connected to the venting system are not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and horizontal pitch, as required in the National Fuel Gas
Code, ANSI Z223.1/NFPA 54 or CSA B149.1, Natural Gas and Propane Installation Code and these
instructions. Determine that there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.
3. As far as practical, close all building doors and windows and all doors between the space in which the appliance(s) connected to the venting system are located and other spaces of the building.
4. Close fireplace dampers.
5. Turn on clothes dryers and any appliance not connected to the venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they are operating at maximum speed. Do not operate a summer exhaust fan.
6. Follow the lighting instructions. Place the appliance being inspected into operation. Adjust the thermostat so appliance is operating continuously.
7. Test for spillage from draft hood equipped appliances at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle. (Fig. 6)
8. If improper venting is observed, during any of the above tests, the venting system must be corrected in accordance with the National Fuel Gas Code, ANSI
Z223.1/NFPA 54 and/or CSA B149.1, Natural Gas and Propane Installation Code.
9. After it h as been determined that each appliance connected to the venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas--fired burning appliance to their previous conditions of use.
For Two Pipe Installation (Direct Vent)
This furnace can NOT be common vented or connected to any type B, BW or L vent or vent connector, nor to any portion of a factory--built or masonry chimney. If this furnace is replacing a previously common-vented furnace, it may b e necessary to resize
the existing vent and chimney to prevent oversizing problems for the other remaining appliance(s). See “Venting and Combustion Air Check” in this section. This furnace MUST be vented to the outside.
VENT AND COMBUSTION AIR PIPING
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Use methods described here to provide combustion and ventilation air.
Dual Certified (PG9YAA Models)
This furnace is certified as a category IV appliance. This furnace can be installed as a direct vent furnace using outside air for combustion or the furnace can use air from inside the structure for combustion. The INLET air pipe is optional. If combustion air comes from inside the structure, adequate make up air MUST be provided to compensate for oxygen burned. See Confined Space Installation in the Combustion and Ventilation Air chapter. If combustion air is drawn from outside the structure, it MUST be taken from the same atmospheric pressure zone as the vent pipe.
Contaminated Combustion Air
Installations in certain areas or types of structures will increase the exposure to chemicals or halogens that may harm the furnace.
The following areas or types of structures may contain or have exposure to the substances listed below. The installation must b e evaluated carefully as it may be necessary to provide outside air for combustion.
S Commercial buildings.
S Buildings with indoor pools.
S Furnaces installed in laundry rooms.
S Furnaces installed in hobby or craft rooms.
S Furnaces installed near chemical storage areas.
S Permanent wave solutions for hair.
S Chlorinated waxes and cleaners.
S Chlorine based swimming pool chemicals.
S Water softening chemicals.
S De-- icing salts or chemicals.
S Carbon tetrachloride.
S Halogen type refrigerants.
S Cleaning solvents (such as perchloroethylene).
S Printing inks, paint removers, varnishes, etc.
S Hydrochloric acid.
S Sulfuric Acid.
S Solvent cements and glues
S Antistatic fabric softeners for clothes dryers.
S Masonry acid washing materials.
Vent and Combustion Air Piping Guidelines
This furnace is approved for venting with Schedule 40 PVC, CPVC, ABS fittings, and Cellular Core and SDR--26 PVC pipe.
.
PG9YAA
13
Applicable ASTM Standards for Vent Materials
Materi-
ABS D1527 __ F628
PVC D1785 D2241 F891
CPVC F441 F442 -- -- F438 -- -- F493
ABS
PVC
als
Sch. 40
Pipe
to
-- -- -- -- -- -- -- -- -- -- D3138
SDR Pipe
Cell
Core
Pipe
Fittings Primer
D2468
&
D2661
D2466
&
D2665
-- -- D2235
F656 D2564
NOTE:
1. In Canada, all pipe, fittings & cements must conform to applicable CSA standards or to local codes having juris­diction.
PG9YAA
2. Only use solvent cements that are marked for use with the specific venting material.
3. ABS to PVC transition joints REQUIRE a special solvent cement that meets the requirements of ASTM D3138.
4. Refer to ASTM D2855 for general procedure to use for cementing plastic pipe and fittings.
NOTE: In order to create a seal that allows future removal of pipe, RTV sealant MUST be used on the inlet pipe where it joins to the furnace.
NOTE: All vent piping MUST be installed in compliance with local codes or ordinances, these instructions, good trade practices, and codes of country having jurisdiction.
1. Determine the best routing and termination for the vent pipe and air inlet pipe by referring to all of the instructions and guidelines in this Section.
2. Determine the size required for the v ent pipe and air inlet pipe.
3. Loosely assemble all venting parts without adhesive (pipe joint cement) for correct fit before final assembly.
4. Furnace shall be installed so as to prevent the accumula­tion of condensate.
5. Use of vertical piping is preferred because there will be some moisture in the flue gases that may condense as it leaves the vent pipe (See Instructions For Horizontal Vents).
6. The vertical vent pipe MUST be supported so that no weight is allowed to rest on the combustion blower.
7. Exhaust vent piping or air inlet piping diameter MUST NOT be reduced.
8. All exhaust vent piping from the furnace to termination MUST slope upwards. A minimum of
1
/4″ (6.35 mm) per foot of run is required to properly return condensate to the furnace drain system.
9. Use DWV type long radius elbows whenever possible, as they provide for the minimum slope on horizontal runs and they provide less resistance in the vent system. If DWV elbows cannot be used, use two, 45° elbows when pos­sible. On horizontal runs the elbows can be slightly mis­aligned to provide the correct slope.
10. All horizontal pipe runs MUST be supported at least every five feet with galvanized strap or other rust resistant ma­terial. NO sags or dips are permitted.
Solvent
Cement
11. All vertical pipe runs MUST be supported every six feet where accessible.
12. The minimum pipe run length is 2(.6 M).
13. The piping can be run in the same chase or adjacent to supply or vent pipe for water supply or waste plumbing. It can also be run in the same chase with a vent from another 90+ furnace.
NOTE:InNO case can the piping be run in a chase where temperatures can exceed 140° F(60° C). or where radiated heat from adjacent surfaces would exceed 140° F(60° C).
14. The vent outlet MUST be installed to terminate in the same atmospheric pressure zone as the combustion air in­let.
15. The vent system can be installed in an existing unused chimney provided that:
S Both the exhaust vent and air intake run the length of the
chimney.
S No other gas fired appliance or fireplace (solid fuel) is vented
into the chimney.
S The top of the chimney MUST be sealed flush or crowned up
to seal against rain or melting snow so ONLY the piping
protrudes.
S The termination clearances showninFig.7and8 are
maintained.
16. Furnace applications with vertical vents requiring vent dia­meter increaser fittings must have increaser fittings in­stalled in v ertical portion of the vent. Condensate will be trapped in the vent if the vent diameter is increased prior to having an elbow turned upward. This could cause nuis­ance tripping of the pressure switch.
Combustion Air and Vent Piping Insulation Guidelines
NOTE: Use closed cell, neoprene insulation or equivalent. If Fiberglass or equivalent insulation is used it must have a vapor barrier. Use R values of 7 up to 10,(2.1 --3.0M) R--11if exposure exceeds 10. If Fiberglass insulation is used, exterior to the structure, the pipe MUST be boxed in and sealed against moisture.
1. When the vent or combustion air pipe height above the
roof exceeds 3 0(762.0 mm), or if an exterior vertical riser is used on a horizontal vent to get above snow levels, the exterior portion MUST be insulated.
2. When combustion air inlet piping is installed above a sus­pended ceiling, the pipe MUST be insulated with moisture resistant insulation such as Armaflex or other equivalent type of insulation.
3. Insulate combustion air inlet piping when run in warm, hu­mid spaces.
Sizing Combustion Air and Vent Pipe
Consult Ta b le 3 to select the proper diameter exhaust and combustion air piping. Exhaust and combustion air piping is sized for each furnace BTUH size based on total lineal vent length (on inlet or outlet side), and number of 90° elbows required. Two 45° elbows can be substituted for one 90° elbow. The elbow or elbows used for vent termination outside the structure ARE counted, including elbows needed to bring termination above expected snow levels. The elbow inside the furnace on the PG9YAA IS NOT included in the count.
14
PIPE DIAMETER TABLE
PG9YAA MODEL
60,000 BTUH Furnaces
40& (5) 90° elbows with 2PVC pipe or
70& (5) 90° elbows with 3PVC pipe
80,000 BTUH Furnace
40& (5) 90° elbows with 2PVC pipe or
40& (5) 90° elbows with 3PVC pipe
100,000 BTUH Furnace
30& (4) 90° elbows with 2PVC pipe or
40& (5) 90° elbows with 3PVC pipe
Elbows are DWV Long Radius Type for 2and 3vents.
If more than five elbows are required, reduce the length of both the inlet and exhaust pipes 5for each additional elbow used. If less than five elbows are required, the length can be INCREASED by 5for each additional elbow NOT used.
Table 3 – Pipe Diameter Table
NOTE: It is allowable to use larger diameter pipe and fitting than shown in the tables but not smaller diameters than shown.
For “Concentric Termination Kit” Venting see Table 4 in this manual.
Vent Termination Clearances
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Inlet and outlet pipes may NOT be vented directly above each other.
1. Determine termination locations based on clearances spe­cified in following steps and as shown in Fig. 7, Fig. 8, Fig. 19 through Fig. 27.
For “Concentric Termination Kit” clearances, see Fig. 28
through Fig. 33 in this manual.
2. For Single Pipe Installation refer to Fig. 8 for vent termin­ation clearances.
3. For Direct Vent Installation refer to Fig. 7 for vent termin­ation clearances.
PG9YAA
15
PG9YAA
12 inches (30 cm) for applieances >10,000 Btuh(3 kW) and <
100,000 Btuh(30kW), 36 inches (91cm) for
appliances > 100,000 Btuh(30kW)
A06675
Fig. 7 -- Direct Vent Termination Clearance
16
PG9YAA
Fig. 8 -- Other than Direct Vent Termination Clearance
17
Condensate Drain Trap
This furnace removes both sensible and latent heat from the products of combustion. Removal of the latent heat results in condensation of the water vapor. The condensate is removed from the furnace through the drains in the plastic transition and the vent fitting. The d rains connect to the externally mounted condensate drain trap on the left or right side of the furnace.
The startup of a new furnace will involve a cycle or two of the furnace to properly prime the condensate trap with water. Until the trap is fully primed, some condensate will be pulled into the combustion blower. The furnace may cycle on the pressure switch connected to the plastic transition box due to condensate buildup. After the trap is primed, the condensate will start draining from the furnace. The combustion blower will clear out any remaining condensate in the blower housing through the vent fitting downstream of the blower. Note that the condensate trap can also be primed by pouring water into the
1
the
/2″ ID drain hose from either the gutter or the white PVC tee trap. Using a funnel pour eight (8) ounces of water into1/2″ ID drain hose. Water will flow through the drain hose and into the
PG9YAA
condensate drain trap. This will prime both the vent and the transition sides of the trap. Reconnect the the original component, either the gutter or the PVC tee trap.
The condensate drain trap supplied with the furnace MUST be used. The drain connection on the condensate drain trap is sized
3
for
/4″ PVC or CPVC pipe, however alternate1/2″ CPVC
(nominal
5
/8″ O.D.) or vinyl tubing with a minimum inner diameter (I.D.) of5/8″ may also be used, as allowed by local codes. Alternate drain pipes and hoses may be used as allowed by local codes.
The drain line must maintain a slope toward the drain.
1
1
/4″ (6.4 mm) per foot is recommended. Installation of an overflow line is recommended when the1/4″ (6.4 mm) per foot slope to the condensate drain cannot be maintained. A drain tube clip is included in the furnace to prevent kinking/buckling of the drain tube. The clip should remain in the furnace (between the door switch plate and the blower shelf, Fig.
9) during operation. See Fig. 17 for proper routing and installation of the overflow.
DO NOT trap the drain line in any other location than at the condensate drain trap supplied with the furnace.
!
CAUTION
FROZEN AND BURST WATER PIPE HAZARD
Failure to follow this caution may result in property d amage.
If a condensate pump is installed, a plugged condensate drain or a failed pump may cause the furnace to shut down. Do not leave the home unattended during freezing weather without turning off water supply and draining water pipes or otherwise protecting against the risk of frozen pipes.
1
/2″ drain hose. Remove
1
/2″ ID drain hose to
/4″ (6.4 mm) per foot downward
If possible, DO NOT route the drain line where it may freeze. The drain line must terminate at an inside drain to prevent freezing of the condensate and possible property damage.
1. A condensate sump pump MUST be used if required by local codes, or if no indoor floor drain is available. The condensate pump must be approved for use with acidic condensate.
2. A plugged condensate drain line or a failed condensate pump will allow condensate to spill. If the furnace is in­stalled where a condensate spill could cause damage, it is recommended that an auxiliary safety switch be installed to prevent operation of the equipment in the event of pump failure or plugged drain line. If used, an auxiliary safety switch should be installed in the R circuit (low voltage) ONLY.
3. If the auxiliary switch in the condensate pump is used, the furnace may shut down due to a blocked condensate line or failed pump. To prevent frozen water pipes see the “Frozen Water Pipe Hazard” Installation Section of this manual.
Drain Tube
Blower Shelf
Representative drawing only, some models may vary in appearance.
Clip
Door Switch
A07705
Fig. 9 -- Drain Tube Clip Location
Condensate Drain Trap Freeze Protection
Special precautions MUST be made if installing furnace in an area which may drop below freezing. This can cause improper operation or damage to the equipment. If the the furnace environment has the potential of freezing, the drain trap and drain line must be protected. Use 3 to 6 watt per foot at 115 volt, 40° F (4.4° C) self--regulating shielded and waterproof heat tape. Wrap the drain trap and drain line with the heat tape and secure with the ties. Follow the heat tape manufacturer’s recommendations.
18
Plastic Caps (2) Yellow or black
Vent Drain &Clamps
Dual Pressure Switch Detail
FLOW
AIR
Coupling & Clamps (Optional)
Drain Tee
Drain Tube Black Rubber
1
/
ID & Clamps
2
EXHAUST
INLET
On Some Models ONLY
V
E
N
T
IN
ON
OFF
Relief Tube Black Rubber
3
/
ID
16
Drain Tube Corrugated & Clamps
Drain Connector Black PVC
3
/
PVC X1/
4
(Loose parts bag)
2
CPVC
5
/
ID
8
Casing Grommet Black Rubber
5
/
ID
8
(Loose parts bag)
Drain Line Vent Tee
1
/
CPVC (Field supplied)
2
3
/
4
PVC or
Representative drawing only, some models may vary in appearance.
Fig. 10 -- Upflow Installations Top Vent
Upflow Installations Top Vent (See Fig.
10)
S Remove knockout from the side of the furnace casing where
drain tube will exit.
5
S Install casing grommet (black rubber
loose parts bag)
S Install the
1
/2″ CPVC street elbow on discharge of trap
S Install the black PVC tube connector (
from loose parts bag) as shown in the illustration above.
S Cut the black drain tube (5/8″ ID -- in loose parts bag) to length
to fit between trap and tube connector through grommet.
S Clamp both ends of the drain tube using clamps provided.
S Glue the CPVC street elbow to the trap using appropriate
/8″ ID grommet -- in
3
/4″ PVC x1/2″ CPVC
Single Pressure Switch
Street Elbow
1
/
CPVC
2
(Loose parts bag)
Drain Tube Black Rubber Cut length to fit (Loose parts bag)
5
/
ID & Clamps,
8
2 5 -- 2 4 -- 8 0
cleaner and solvent cement.
3
S The field supplied
/4″ PVC or1/2″ CPVC drain line vent tee
must vent outside the furnace cabinet (see exploded view
above).
NOTE: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Tr ap must be primed before operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing o f the vent system.
NOTE: “PVC” is used as a generic term. Pipe and fitting materials used must be acceptable to the local code officials having jurisdiction.
PG9YAA
A07706
19
Plastic Cap
°
°
Yellow or black
Coupling & Clamps (Optional)
PVC Coupling
2
INLET
On Some Models ONLY
PG9YAA
Vent Drain &Clamps
Either: The PVC Drain Tee or a field supplied 2
Dual Pressure Switch Detail
FLOW
FLOW
AIR
AIR
Drain Connector Black PVC
3
/
PVC X1/
4
(Loose parts bag)
2
CPVC
Casing Grommet Black Rubber
5
/
ID
8
(Loose parts bag)
PVC Tee
EXHAUST
Tee Trap White PVC (loose parts bag)
Drain Tube Black Rubber
1
/
ID & Clamps
2
Drain Tube Corrugated
5
/
ID & Clamps
8
V
E
N
T
IN
ON
OFF
3
/
ID Rubber Tube
16
Single Pressure Switch
SIDE VIEW
Rotate downward
to 10
5
NOTE: Built-- in channel will
be angled 5° to 10° also.
Drain Line Vent Tee
3
/
4
PVC or1/
CPVC (Field supplied)
2
Representative drawing only, some models may vary in appearance.
Fig. 11 -- Upflow Installations Vent through Left Side
Upflow Installations Vent through Left Side (See Fig. 11)
S Remove drain tee from inducer discharge and remove black
drain tube (1/2″ ID) from bottom of drain tee.
S Install Vent Pipe grommet in side of casing.
S Cut an appropriate length of 2PVC pipe long enough to exit
the cabinet and connect the vent drain to either:
— A standard field supplied 2PVC tee, or —A2″ PVC coupling fastened onto the drain tee.
S Install tee trap into bottom of tee.
S Remove knockout from the side of the furnace casing where
drain tube will exit.
S Install the1/2″ CPVC street elbow on discharge of trap
S Install the black PVC drain connector (
3
/4″ PVC x1/2″ CPVC
25--24--81
A07707
from loose parts bag) as shown in the illustration above.
5
S Cut the black drain tube (
/8″ ID -- in loose parts bag) to length
to fit between trap and tube connector through grommet.
S Clamp both ends of the drain tube using clamps provided.
S Glue the CPVC street elbow to the trap using appropriate
cleaner and solvent cement.
S Connect the tee trap and the main drain line exiting the casing
as shown in Fig. 17.
NOTE: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Both
the internal trap and the external tee trap must be primed before operation. Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.
20
°
°
Plastic Cap
Yellow or black
INLET
On Some Models ONLY
Vent Drain &Clamps
Dual Pressure Switch
Drain Tube Corrugated
5
/
ID&Clamps
8
SIDE VIEW
Rotate downward 5
to 10
Relief Tube Black Rubber
3
/
ID
16
V
E
N
T
IN
ON
OFF
2
PVC
Either: The PVC Drain Tee or a field supplied 2
PVC Tee
Single Pressure Switch Detail
Coupling
EXHAUST
AIRFLOW
PG9YAA
Tee Trap White PVC (loose parts bag)
Elbows Tubes (2) & Clamps Black,
1
/
ID (loose parts bag)
2
Barbed Coupling, (loose parts bag)
1
/
OD
2
2
3
/
4
CPVC
PVC
Drain Line Vent Tee
1
/
CPVC (Field supplied)
or
2
Drain Connector Black PVC
3
/
PVC X1/
4
(Loose parts bag)
NOTE: Built-- in channel will
be angled 5° to 10° also.
Representative drawing only, some models may vary in appearance.
Fig. 12 -- All Models Vent Through Right Side
All Models Vent through Right Side (See Fig. 12)
S Disconnect the black drain tube between the drain vent and the
trap.
S Rotate the inducer 180° for a right side vent after loosening the
4 inducer attachment screws. Reinstall and retighten the
inducer screws to 20pounds torque.
S Using the
connect together with the 2 short
connect the lower discharge port of the vent drain to the trap.
Secure all connections with clamps.
S Install the vent pipe grommet into the casing
S Cut an appropriate length of 2PVC pipe long enough to exit
the cabinet and connect the vent drain to either:
S Install tee trap into bottom section of tee.
S Remove knockout from the side of the furnace casing where
drain tube will exit.
1
/2″ OD barbed coupling in the loose parts bag
1
/2″ ID elbow tubes and
— A standard field supplied 2PVC tee, or —A2″ PVC coupling fastened onto the drain tee.
Casing Grommet Black Rubber
5
(Loose parts bag)
S Install casing grommet (black rubber
5
/8″ ID grommet -- in
loose parts bag)
S Install the1/2″ CPVC street elbow on discharge of trap
S Install the black PVC tube connector (
from loose parts bag) as shown in the illustration above
3
/4″ PVC x1/2″ CPVC
S Cut the black drain tube (5/8″ ID -- in loose parts bag) to length
to fit between trap and tube connector through grommet.
S Clamp both ends of the drain tube using clamps provided.
S Glue the CPVC street elbow to the trap using appropriate
cleaner and solvent cement.
S Connect the tee trap and the main drain line exiting the casing
as shown in Fig. 17.
S Note: It is recommended that all PVC piping and fitting
connections be fit up and inspected before final cementing.
Both the internal trap and the external tee trap must be primed
before operation. Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag)
may be installed as shown for future servicing of the vent
system.
/
8
CPVC
A07708
21
PG9YAA
Vent Drain &Clamps
EXHAUST
Plastic Caps Yellow or black
Alternate Orientation
Dual Pressure Switch
ON
OFF
T
N E V
IN
AIR
FLOW
Single Pressure Switch Detail
AIR FLOW
Relief Tube Black Rubber
3
/
ID
16
Flexible Tubing Connector
3
/
OD (Loose Parts Bag)
16
Relief Tube Extension Black Rubber Cut to Fit (Loose Parts Bag)
Trap Connection
“Clamp ears” Pointed OUT
Preassemble & insert into furnace
3
/
ID
16
Field Supplied Tee
Coupling & Clamps (Optional)
Drain Tube Black Rubber
1
/
2
Cap and Clamp
Tee Trap White PVC
Open End
(loose parts bag)
Representative drawing only, some models may vary in appearance.
Fig. 13 -- Horizontal Left through Top
Horizontal Left through Top (See Fig. 13)
S Disconnect the hoses from the trap assembly, and remove trap
and trap mounting bracket from the blower compartment.
Using cover plate and gasket provided in the loose parts bag,
cover the hole from the burner compartment to the blower
compartment and secure with screws.
S Remove knockout from the side of the furnace casing where
drain tube will exit.
S Mount the trap externally to the bottom side o f the unit using
the 2 screws provided in the location shown.
S Cut the corrugated tube as shown in the illustration above.
Connect the corrugated hose from the transition to the trap.
Secure connections with clamps.
S Remove the black
a yellow cap and clamp over the open drain port of the drain
tee.
S Connect the black
1
/2″ ID drain tube from the drain tee. Install
1
/2″ ID drain tube from the Vent Drain to the
ID & Clamps
Remove KO before mounting Trap
5
/
Drain Tube Corrugated Cutatstraightsection
Leave room for clamp
ID & Clamps
8
Cut Here
A07709
trap. Secure connections with clamps.
S Connect the3/16″ ID relief tube to the middle port on the trap.
If an extension is required, use the3/16″ OD flexible tubing
connector and the black
3
/16″ ID relief tube in the loose parts
bag. Cut tube to length. Secure all connections with clamps.
S Cut an appropriate length of 2″ PVC pipe, long enough to exit
the cabinet and connect the vent drain to either:
— A standard field supplied 2PVC tee, or —A2″ PVC coupling fastened onto the drain tee.
S Install tee trap into bottom section of tee.
S Connect the tee trap and the main drain line exiting the casing
as shown in Fig. 17.
NOTE: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Both
the external trap and the external tee trap must be primed before operation. Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.
22
Alternate Orientation
Field Supplied Tee
Single Pressure Switch Detail
Yellow or black Plastic Cap
EXHAUST
Level or Sloped towards Tee
Dual Pressure Switch
Relief Tube Black Rubber
3
/
ID
16
FLOW
AIR
Vent Drain &Clamps
Elbow Tube Black Rubber
1
/
ID & Clamps
2
(Loose Parts Bag)
Tee Trap White PVC (loose parts bag)
On Some Models ONLY
INLET
ON
OFF
T
N
E
V
IN
Flexible Tubing Connector
3
/
OD (Loose Parts Bag)
16
Relief Tube Extension Black Rubber (Loose Parts Bag)
Representative drawing only, some models may vary in appearance.
Fig. 14 -- Horizontal Left--Side Vent
Horizontal Left--Side Vent (See Fig. 14)
S Remove the drain tee from the Vent Drain if installed. S Rotate the inducer 180° for a side vent after loosening the 4
inducer attachment screws. Reinstall and retighten the inducer
screws to 20pounds torque.
S Disconnect the hoses from the trap assembly, and remove trap
and trap mounting bracket from the blower compartment.
Using cover plate and gasket provided in the loose parts bag,
cover the hole from the burner compartment to the blower
compartment and secure with screws.
S Remove knockout from the side of the furnace casing where
drain tube will exit.
S Mount the trap externally to the bottom side o f the unit using
the 2 screws provided in the location shown.
S Cut the corrugated tube as shown in the illustration above.
Connect the corrugated hose from the transition to the trap.
Secure connections with clamps.
S Connect the black
1
/2″ ID drain tube from the Vent Drain to the
trap. If an extension is required, use the black
tubing connector and the black
1
/2″ ID drain tube in the loose
1
/2″ OD flexible
3
/
16
Barbed Coupling
1
/
OD (Loose Parts Bag)
2
Drain Tube Black Rubber
1
/
ID & Clamps
2
WARN ING Move Caps to top of trap
Drain Tube Black,5/
Cut at straight section
ID Corrugated
8
ID Cut to Fit
Leave room for clamp
Cut Here
parts bag. Cut tube to length. Secure connections with clamps.
3
S Connect the
/16″ ID relief tube to the middle port on the trap.
If an extension is required, use the3/16″OD flexible tubing
connector and the black
3
/16″ ID relief tube in the loose parts
bag. Cut tube to length.
S Cut an appropriate length of 2″ PVC pipe, fittings and
extension pipe long enough to exit the cabinet and connect the
vent drain to either:
— A standard field supplied 2PVC tee, or —A2″ PVC coupling fastened onto the drain tee.
S Install tee trap into bottom section of tee.
S Important: The pipe to the tee trap must be level o r sloping
towards the tee trap
S Connect the tee trap and the main drain line exiting the casing
as shown in Fig. 17.
NOTE: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Both the external trap and the external tee trap must be primed before operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.
PG9YAA
2 5 -- 2 4 -- 8 8
A07710
23
Trap Connection
“Clamp ears” Pointed OUT
Single Pressure Switch Detail
FLOW
AIR
Plastic Cap Yellow or black
Alternate Orienta­tion
PG9YAA
Preassemble & insert into furnace
Relief Tube Rubber Tube
3
/
ID
16
Flexible Tubing Connector
3
/
OD (Loose Parts Bag)
16
Relief Tube Extension Black Rubber Cut to Fit (Loose Parts Bag)
3
/
ID
16
Drain Tube Corrugated Cut at straight section
Coupling & Clamps (Optional)
WARN ING Add Cap and Clamp
Dual Pressure Switch
5
/8″″ID & Clamps
Vent Drain &Clamps
IN
V E N T
OFF
ON
Drain Tube Black Rubber
1
/
ID & Clamps
2
Field Supplied Tee
EXHAUST
Tee Trap White PVC (loose parts bag)
Elbow Tube Black Rubber1/ ID & Clamps (Loose Parts Bag)
INLET
On Some Models ONLY
Barbed Coupling1/ (Loose Parts Bag)
OD
2
2
Leave room for clamp
Representative drawing only, some models may vary in appearance.
Fig. 15 -- Horizontal Right through Top
Horizontal Right through Top (See Fig.
15)
S Disconnect the hoses from the trap assembly, and remove trap
and trap mounting bracket from the blower compartment.
Using cover plate and gasket provided in the loose parts bag,
cover the hole from the burner compartment to the blower
compartment and secure with screws.
S Remove knockout from the side of the furnace casing where
drain tube will exit.
S Mount the trap externally to the bottom side o f the unit using
the 2 screws provided in the location shown.
S Cut the corrugated tube as shown in the illustration above.
Connect the corrugated hose from the transition to the trap.
Secure connections with clamps.
S Connect the black
the trap. If an extension is required, use the black1/2″ OD
barbed coupling and the black
1
/2″ ID drain tube from the Vent Drain to
1
/2″ ID drain tube in the loose
Cut Here
parts bag. Cut tube to length. Secure connections with clamps.
S Connect the
If an extension is required, use the clear
tubing connector and the black
3
/16″ ID relief tube to the middle port on the trap.
3
/16″ OD flexible
3
/16″ ID relief tube in the loose
parts bag. Cut tube to length.
S Cut an appropriate length of 2″ PVC pipe, fittings and
extension pipe long enough to exit the cabinet and connect the
vent drain to a standard field supplied 2PVC tee
S Install tee trap into bottom section of tee.
S Connect the tee trap and the main drain line exiting the casing
as shown in Fig. 17.
NOTE: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Both the external trap and the external tee trap must be primed before operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.
A07711
24
AIR FLOW
Plastic Cap Yellow or black
Coupling & Clamps (Optional)
Single Pressure Switch Detail
Relief Tube Black Rubber
3
/
ID
16
Flexible Tubing Connector
3
/
OD (Loose Parts Bag)
16
Relief Tube Extension Black Rubber Cut to Fit (Loose Parts Bag)
3
/
ID
16
Drain Tube Corrugated,
Cut at straight section
Dual Pressure Switch
5
/
ID & Clamps
8
Vent Drain &Clamps
Level or Sloped towards Tee
IN
V E N
T
OFF
ON
Drain Tube Black Rubber
1
/
ID & Clamps
2
EXHAUST
Elbow Tube Black Rubber
1
/
ID & Clamps
2
(Loose Parts Bag)
On Some Models ONLY
INLET
Alternate Orientation
Barbed Coupling (Loose Parts Bag)
Field Supplied Tee
Tee Trap White PVC (loose parts bag)
1
/
OD
2
PG9YAA
Leave room for clamp
Cut Here
Representative drawing only, some models may vary in appearance.
Fig. 16 -- Horizontal Right Side Vent
Horizontal Right Side Vent (See Fig. 16)
S Disconnect drain tee if installed
S Disconnect the hoses from the trap assembly, and remove trap
and trap mounting bracket from the blower compartment.
Using cover plate and gasket provided in the loose parts bag,
cover the hole from the burner compartment to the blower
compartment and secure with screws.
S Remove knockout from the side of the furnace casing where
drain tube will exit.
S Mount the trap externally to the bottom side o f the unit using
the 2 screws provided in the location shown.
S Cut the corrugated tube as shown in the illustration above.
Connect the corrugated hose from the transition to the trap.
Secure connections with clamps.
S Connect the black
trap. If an extension is required, use the1/2″ OD barbed
coupling and the black
1
/2″ ID drain tube from the Vent Drain to the
1
/2″ ID drain tube in the loose parts bag.
A07712
Cut tube to length. Secure connections with clamps.
S Connect the3/16″ ID relief tube to the middle port on the trap.
If an extension is required, use the clear3/16″OD splice
connector and the black
bag. Cut tube to length.
S Cut an appropriate length of 2″ PVC pipe, fittings and
3
/16″ ID relief tube in the loose parts
extension pipe long enough to exit the cabinet and connect the
vent drain to either:
— A standard field supplied 2PVC tee, or —A2″ PVC coupling fastened onto the drain tee.
S Install tee trap into bottom section of tee.
S Important: The pipe to the tee trap must be level o r sloping
towards the tee trap.
S Connect the tee trap and the main drain line exiting the casing
as shown in Fig. 17.
NOTE: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Both
the external trap and the external tee trap must be primed
25
before operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.
Connecting Vent and Combustion Air Piping
!
WARNING
INLET
EXHAUST
V
E
N
T
IN
ON
OFF
PG9YAA
Open Tee
Tee Trap
Evaporator
Coil Drain Line (Optional)
Main Drain Line
Condensate Trap
Representative drawing only, some models may vary in appearance.
Fig. 17 -- Connecting Tee Trap to Condensate Trap and Main
Drain Line
The tee trap must be connected to the main condensate drain line as conceptually shown above. Different installations may require slightly different orientations. The following steps apply to all installations.
1. The tee trap should be installed as close to the side or top of the furnace as practical. Minimize the distance between the inducer and the tee trap as much as possible.
2. An open tee is to be used at the tee trap discharge. The top end of the tee should be open to the atmosphere to elimin­ate potential air lock problems.
3. The drain line from the tee trap is to be connected to the furnace condensate trap drain line as shown above.
4. Condensate drain lines from a cooling coil may be connec­ted downstream of the connection point of the tee trap and furnace condensate trap.
IMPORTANT: Prime both traps with water before operation. Failure to prime the traps may result in discharge of flue gases from the condensate drain line and open tee for a period of time, and may result in temporary lockout of the furnace upon start up. Main drain line construction is left to the discretion of the installer. It may be made o f either rigid pipe or flexible tube.
1
/
Tube ID should NOT be less than
.
2
A07713
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Cement or mechanically seal all joints, fittings, etc. to prevent leakage of flue gasses.
Refer to Fig. 10 through Fig. 16 that corresponds to the installation position of the furnace for the application.
Preassemble the vent and combustion air piping from the furnace to the vent termination. Do not cement the pipe joints until the pipe preassembly process is complete.
Combustion Air Pipe Connection (Dual Certified or
Direct Vent)
Install the air intake coupling and gasket to the furnace with the four(4) screws:
NOTE: The air intake coupling and gasket can be installed to the top panel, or to the alternate air intake locations on either the left or right side panels of the furnace.
For installation in the alternate air intake location on either the left or right side panels, remove the 3” knockout from the side panel and relocate to the air intake hole in the top panel. Use four (4) screws to seal the four (4) mounting holes in the top panel next to the hole plug. Drill four (4) casing using the air intake coupling as the template.
The air intake coupling is sized for 2PVC pipe. Install the combustion air pipe to the air intake coupling using
RTV sealant to provide for future serviceability.
7
/
diameter holes in the
64
Vent Pipe Connection
Install the vent pipe grommet to the furnace panel. Locate the grommet in the furnace panel at a location directly away from the vent fitting on the combustion blower. The grommet snaps into the 3hole on the furnace panel. NOTE: Depending on the installation position, the vent pipe grommet will be installed to the top panel or to the alternate location on the side panels. If needed, remove the 3hole plug from the loose parts bag and relocate to the open hole in the furnace panel. (See Fig. 10 or Fig.
17) Install the vent pipe to the rubber coupling, the vent fitting or the
PVC vent extension pipe. Securely attach using the clamp or PVC cement as required.
NOTE: The vent fitting MUST be installed w ith the air flow marking arrow pointed toward the vent pipe. (See Fig. 18 Some installations require the vent fitting to be installed with a5° to 10° downward slope. (See Fig. 10 through Fig. 17)
26
Rubber Coupling
°
°
°
°
&Clamps
Vent Pipe
Elbow
90
Vent Extension Pipe (Side Panel Exit)
SIDE VIEW
Tee
NOTE: Built--in channel will be angled 5° to 10° also.
Rotate downward 5
Vent Pipe (Top Panel Exit)
NOTE: The 90° elbow is approved for use inside the furnace ONLY.
Vent Fitting &Clamps
Combustion Blower
to 10
A07714
Fig. 18 -- Proper Sealing Procedure for Combustion Blower
Joining Pipe and Fittings
SEE VENT AND COMBUSTION AIR PIPING, vent and Combustion Air Piping Guidelines in this manual for applicable
ASTM Standards for vent materials.
primer to inside surface of socket and outside of pipe. Do NOT allow primer to dry before applying cement.
3. Apply a thin coat of cement evenly in the socket. Quickly apply a heavy coat of cement to the pipe end and insert pipe into fittings with a slight twisting movement until it bottoms out.
NOTE: Cement MUST be fluid while inserting pipe. If NOT, recoat pipe.
4. Hold the pipe in the fitting for 30 seconds to prevent the tapered socket from pushing the pipe out of the fitting.
5. Wipe all excess cement from the joint with a rag. Allow 15 minutes before handling. Cure time varies according to fit, temperature and humidity.
Connecting Vent Pipes and Termination (Direct Vent)
NOTE: For direct vent applications, combustion air intake and vent MUST terminate in the same atmospheric pressure zone. If installation is in a cold climate (sustained temperatures 0°F (--17.8°C)and below for 24 or more consecutive hours), increase the minimum distance between vent pipe and air intake from 8 to 18(203.2 to 457.2 mm).
6. Install all couplings, nipples and elbows using proper pro­cedures for Joining Pipe and Fittings and maintain spa­cing between vent and combustion air piping as indicated in Fig. 19 through Fig. 27 .
8” *
MIN.
20’
MAX
*18″Minimum for cold climates (sustained temperatures 0 and below for 24 or more con­secutive hours)
F
PG9YAA
!
WARNING
FIRE HAZARD
Failure to follow this warning could result in personal injury, death, and/or property damage.
Observe all cautions and warnings printed on material containers.
Provide adequate ventilation and do NOT assemble near heat source or open flame. Do NOT smoke while using solvent cements and avoid contact with skin or eyes.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Do NOT use solvent cement that has become curdled, lumpy or thickened and do NOT thin. Observe precautions printed on containers. For applications below 32_F(0_C), use only low temperature type solvent cement. Poor joints may lead to disconnected or leaking vent pipe joints allowing carbon monoxide to enter the living space.
1. Cut pipe end square, remove ragged edges and burrs. Chamfer end of pipe, then clean fitting, socket and pipe joint of all dirt, grease, or moisture.
NOTE: Stir the solvent cement frequently while using. Use a natural bristle brush or the dauber supplied with the cement. The proper brush size is one inch.
2. After checking pipe and socket for proper fit, wipe socket and pipe with cleaner-primer. Apply a liberal coat of
8”
MIN.
EXHAUST
INLET
12 ” MIN.
GRADE LEVEL
OR
SNOW LEVEL
2 5 -- 0 0 -- 0 5 F
A07715
Fig. 19 -- Sidewall Termination 12” (304.8 mm) or More
Above Snow Level or Grade Level
Horizontal Termination
1. Cut two holes. 21/2″ for 2″ pipe, 3″ for 21/2″ pipe, or 31/2″
for 3pipe. Do NOT make the holes oversized, or it will be necessary to add a sheet metal or plywood plate on the outside with the correct size hole in it.
2. Check hole sizes by making sure it is smaller than the couplings or elbows that will be installed on the outside. The couplings or elbows MUST prevent the pipe from be­ing pushed back through the wall.
3. Extend vent pipe and combustion air pipe through the wall
3
/4″ to 1″ and seal area between pipe and wall.
4. Install the couplings, nipple and termination elbows as shown and maintain spacing between vent and combustion air piping as indicated in Fig. 19 and Fig. 20.
A metal shield is recommended 18x18″ min. or 18″ (457.2 mm) min. diameter around the vent termination at the exterior wall to protect the house exterior materials from flue product or condensation (freezing) damage.
27
8” *
°
)
MIN.
20’
MAX
12 ” MIN.
INLET
EXHAUST
PG9YAA
Fig. 20 -- Sidewall Termination with Exterior Risers to Get
GRADE LEVEL
OR
SNOW LEVEL
*18″Minimum for cold climates (sustained temperatures 0 low for 24 or more consecutive hours
8”
MIN.
Above Snow Level or Grade Level
Using Exterior Risers
1. Install elbows and pipe to form riser as shown in Fig. 20.
2. Secure vent pipe to wall with galvanized strap or other rust resistant material to restrain pipe from moving.
3. Insulate pipe with Armaflex or equivalent moisture resist­ant closed cell foam insulation or fiberglass insulation if boxed in and sealed against moisture.
Vent Termination Shielding
Under certain wind conditions some building materials may be affected by flue products expelled in close proximity to unprotected surfaces. Sealing or shielding of the exposed surfaces with a corrosion resistant material (such as aluminum sheeting) may b e required to prevent staining or deterioration. The protective material should be attached and sealed (if necessary) to the building before attaching the vent terminal.
Fandbe-
A07716
Vertical Termination
1. Fig. 21 shows the proper installation and clearances for vertical vent termination. The vertical roof termination should be sealed with a plumbing roof boot or equivalent flashing. The inlet of the intake pipe and end of the ex­haust vent must be terminated no less than 12(304.8 mm) above the roof or snow accumulation level, and 12(304.8 mm) away from a vertical wall or other protrusion.
2. If the vent system is installed in an existing chimney make sure clearances shown in Fig. 21 are maintained. Horizont­al section before the termination elbow can be extended on the inlet air to provide necessary clearance.
Multi Vent Termination Clearances
When two (2) or more furnaces are vented near each other, each furnace must be individually vented.
Two (2) vent terminations may be installed as shown in Fig. 22, 23, 24, 25, 26 and 27, but the next vent termination must be at least 36away from first 2 terminations. It is important that vent terminations be made as shown to avoid recirculation of flue gases.
12″Min. Grade or Snow Level
Combustion Air
2”
36”
OR
Fig. 22 -- Concentric Vent and Combustion--Air
Roof Termination
36”
Exhaust
A07718
B
A
A
A=12″ Above roof or snow accumulation level B=8″ Min., 20′ Maximum, except in areas with extreme cold temperatures (sustained temperatures 0°F and below for 24 or more consecutive hours), then 18 Min.
Fig. 21 -- Rooftop Termination
1″Maximum
Combustion Air
Exhaust
Vent
(TYP.)
Vent
“A”
25-- 22--02d
Dimension “A” is touching or 2maximum separation.
A07717
A07695
Fig. 23 -- Concentric Vent and Combustion Air
Sidewall Termination
28
Inlet
°
°
°
°
12″Min. Grade or Snow Level
“A”
“A”
Exhaust
8″Min. 20
Max.
18″Min. for Cold Climates (Sustained temperatures 0 andbelowfor24ormorecon­secutive hours)
8″Min.
F
Dimension “A” is touching or 2maximum separation.
A07696
Fig. 24 -- Sidewall Inlet Vent and Exhaust--Air Termination
18″Min. for Cold Climates (Sustained temperatures 0
F and below for 24 or
more consecutive hours)
12″Min. Grade or Snow
Inlet
8″Min. 20
Max.
Exhaust
Level
Fig. 26 -- Rooftop Inlet Vent and Exhaust--Air Termination
A07698
18″Min. for Cold Climates (Sustained temperatures 0 and below for 24 or more con­secutive hours)
Exhaust
F
8″Min.
Max.
20
“A”
“A”
Inlet
8″Min.
12″Min. Grade or Snow Level
Dimension “A” is touching or 2maximum separation.
A07697
Fig. 25 -- Sidewall Inlet Vent and Exhaust--Air Termination
with Exterior Risers
12
90
INLET
12
MIN. Ground Level OR Snow Level
SIDE VIEW
12
FRONT VIEW
Same Joist
Space
EXHAUST
OVERHANG
MIN.
Fig. 27 -- Recommended Alternate Installation
for Sustained Cold Weather
(0_F & below for 24 or more consecutive hours)
PG9YAA
A07699
29
CONCENTRIC TERMINATION
Vent Termination Clearances
!
WARNING
CARBON MONOXIDE POISONING, FIRE AND EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
Inlet and outlet pipes may NOT be vented directly above each other (standard vent terminals).
1. Determine termination locations based on clearances spe­cified in following steps and as shown in Fig. 7, Fig. 28 through Fig. 33.
2. The vent termination must be located at least 12(304.8
PG9YAA
mm) above ground or normally expected snow accumula­tion levels.
3. Do NOT terminate over public walkways. Avoid areas where condensate may cause problems such as above planters, patios, or adjacent to windows where steam may cause fogging.
4. The vent termination shall be located at least 4(1.2 M)ho­rizontally from any electric meter, gas meter, gas regulator, and any relief equipment. These distances apply ONLY to U.S. installations.
5. The vent termination is to be located at least 3(.91 M) above any forced air inlet located within 10(3.1 M); (3. 1 M) and at least 10(3.1 M) from a combustion air intake of another appliance, except another direct vent furnace in­take.
6. In Canada, the Canadian Fuel Gas Code takes precedence over the preceding termination instructions.
terials, 2) possible damage to the terminal from foreign ob­jects, 3) wind effects that may cause recirculation of flue products, debris or light snow and 4) visible vent vapor.
3. Cut one 5diameter hole through the structure for the KGAVT0601CVT Kit or one 4diameter hole for the KGAVT0501CVT Kit .
Kit Contents:
3Rain Cap or 2Rain Cap 3Diameter SDR-- 26 Pipe, 19 4Diameter SDR-- 26 Pipe, 24Long, 2Diameter SDR-- 26 Pipe, 31
1
/2″ Diameter SDR-- 26 Pipe, 371/8″ Long,
2 3Y Concentric Fitting or 2Y Concentric Fitting
2
or 3″Dia.
Y Concentric Fitting
1
/2″ Long or
5
/8″ Long or
Nominal 3″or 4″Dia. SDR- 26 Pipe
2or21/2″″Dia. SDR- 26 Pipe
2″or 3″Dia. Rain Cap
Fig. 28 -- Kit Components
Vent
Maintain 12″min. clearance above highest anticipated snow level. Max.
above roof.
of 24
Combustion Air
Roof Boot/ Flashing (Field Supplied)
Support (Field Supplied)
A07719
Concentric Vent Termination - Kit # KGAVT0601CVT & KGAVT051CVT
These k its are for vertical or horizontal termination of the combustion air inlet and the exhaust v ent pipes on Category IV gas--fired condensing furnaces. The KGAVT0601CVT kit can be used for 3diameter pipe systems. The KGAVT0501CVT kit can be used for 2diameter pipe system. Refer to Table 4 for the correct pipe size for the furnace. Both the combustion air inlet and the exhaust vent pipes must attach to the termination kit. The termination kit must terminate outside the structure and must be installed per the instructions outlined below for vertical or horizontal termination. Vertical termination is preferred. Field supplied pipe and fittings are required to complete the installation.
Vertical & Horizontal Termination
1. Determine the pipe diameters required for the installation from Table 4 and Fig. 30.
2. Determine the best location for the termination kit. See Fig. 29 for vertical termination or Fig. 33 for horizontal termination. Roof termination is preferred since it is less susceptible to damage, has reduced intake contaminants and less visible vent vapor. For side wall termination, con­sideration should be given to: 1) possible damage from the vapors to plants/shrubs, other equipment and building ma-
45°Elbow (Field Supplied)
Vent
Combustion Air
Note: Support must be field installed to secure termination kit to structure.
A07720
Fig. 29 -- Concentric Vent Roof Installation
4. Dimension D may be lengthened to 60(1524 mm) max. or shortened by cutting the pipes to 12(304.8 mm) min. Dimension A will change according to D dimension. (See Fig. 30).
5. Partially assemble the concentric vent termination k it. Clean and cement the parts using the procedures for Join­ing Pipe and Fittings section of the manual. A) Cement the Y Concentric fitting to the longest of the two straight kit pipes. (See Fig. 28) B) Cement the rain cap to the shortest of the straight kit parts. (See Fig. 28).
NOTE: A field supplied stainless steel screw may be used to secure the rain cap to the pipe instead of cementing when field disassembly is desired for cleaning (See Fig. 31).
30
B PVC
Vent/Exhaust
C
1
/
1
2
B PVC Intake/Combustion Air
Model A* B C D**
7
KGAVT0601CVT 38
KGAVT0501CVT 333/
* = Dimension will change accordingly as dimension D is lengthened or shortened. **= Dimension D may be lengthened to 60may also be shortened by cutting the pipes provided in the kit to 12minimum.
/
8
8
D
A
34
23
1
/
2
1
/
2
211/
165/
8
8
A07721
Fig. 30 -- Concentric Vent Dimensional Drawing
Drill clearance hole in rain cap and pilot hole in vent pipe.
Stainless steel screw (Field supplied)
A07722
Fig. 31 -- Rain Cap to Vent Pipe Assembly
6. Install the Y concentric fitting and the pipe assembly through the structure’s hole. For vertical termination, in­stall the parts through the field supplied roof boot/flashing.
NOTE: Do not allow insulation or other materials to accumulate inside the pipe assembly when installing through the structure’s hole.
!
WARNING
PG9YAA
Concentric Termination Kit KGAVT0801CVT &
KGAVT0701CVT Venting Table for
PG9YAA Models
60,000 Btuh Furnaces
KGAVT0701CVT -- 35& (4) 90° elbows with 2PVC pipe or KGAVT0801CVT -- 65& (4) 90° elbows with 3PVC pipe
80,000 Btuh Furnace
KGAVT0701CVT -- 35& (4) 90° elbows with 2PVC pipe or KGAVT0801CVT -- 35& (4) 90° elbows with 3PVC pipe
100,000 Btuh Furnace
KGAVT0701CVT -- 25& (3) 90° elbows with 2PVC pipe or KGAVT0801CVT -- 35& (4) 90° elbows with 3PVC pipe
1. Do not include the field supplied 45° elbow in the total el­bow count.
2. If more elbows are required, reduce the length of both the inlet and the exhaust pipes five feet for each additional elbow used.
3. Elbows are DWV long radius type for 2 NOTE: Feet of pipe is whichever pipe run is the longest, either inlet or outlet side.
Table 4 – Concentric Termination Kit
If assembly needs to be extended to meet height or side wall thickness requirement, the two pipes supplied in the kit may be replaced by using the same diameter solid, single (no coupling connections) field supplied SDR--26 PVC (ASTM D2241) pipes. Do not extend dimension D more than 60.(SeeFig.30).
Do not use field supplied couplings to extend the pipes. Airflow restriction will occur and the furnace pressure switch may cause intermittent operation.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
When using the alternate screw assembly method, drill a clearance hole in the rain cap and a pilot hole in the vent pipe for the screw size being used. Failure to drill adequate holes may cause cracking of the PVC components, allowing flue gasses to be recirculated.
and 3vents.
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Do not operate the furnace with the rain cap removed as recirculating of the flue gasses may occur. Water may also collect inside the larger combustion air pipe and flow to the burner enclosure.
7. Secure the assembly to the structure as shown in Fig. 29 or Fig. 33 using field supplied metal strapping or equivalent material.
NOTE: Ensure the termination height is above the roof surface or anticipated snow level as shown in Fig. 29 for vertical termination. Ensure the termination location clearance dimensions are as shown in Fig. 32 and Fig. 33 for horizontal termination.
8. Install the rain cap and the small diameter pipe assembly in the Y concentric fitting and the large pipe assembly. Ensure that the small diameter pipe is bottomed out and securely cemented in the Y concentric fitting.
Roof Overhang
12″min.
1″max.
Combustion Air
Vent
Maintain 12″clearance above highest antici­pated snow level or grade whichever is greater.
A07736
Fig. 32 -- Concentric Vent and Combustion--Air
Side Termination
9. Cement the furnace combustion air and vent pipes to the concentric vent termination assembly. See Fig. 32 or Fig. 33 for proper pipe attachment.
31
10. Operate the furnace through one heat cycle to ensure com-
bustion air and vent pipes are properly connected to the concentric termination connections.
GAS SUPPLY AND PIPING
!
WARNING
Gas Pressures
Gas Type
Natural 7 14 4.5
Propane 11 14 11
Recommended Max. Min.
Supply Pressure
FIRE AND EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death, and/or property damage.
Models designated for Natural Gas are to be used with Natural Gas ONLY, unless properly converted to use with Propane gas.
NOTE: The rating plate is stamped with the model number, gas type and gas input rating. In addition, models manufactured for sale in Canada have orifice size information stamped on the rating plate.
PG9YAA
Gas Supply Requirements
Gas supply pressure should be within minimum and maximum values listed on rating plate. Pressures are usually set by gas suppliers.
(See Propane Gas Conversion Kit instruction manual for furnaces converted to Propane gas)
S Use only the Type of gas approved for this furnace. See rating
plate for approved gas type.
1
S A
/8″ NPT plugged tapping, accessible for a test gauge
connection,must be installed immediately upstream of the gas
supply connection to furnace.
S Gas supply pressure should be within minimum and maximum
values listed on rating plate. Pressures are usually set by gas
suppliers.
S Gas input must not exceed the rated input shown on the rating
plate. Overfiring will result in failure of heat exchanger and
cause dangerous operation.
S Do not allow minimum supply pressure to vary downward.
Doing so will decrease input to furnace. Refer to Table 5 for
Gas supply. Refer to Table 6 o r Table 7 for manifold pressures.
Strap (Field Supplied)
Vent
Combustion Air
Note: Securing strap must be field installed to prevent movement of termination kit in side wall.
Fig. 33 -- Concentric Vent Sidewall Attachment
45°Elbow (Field Supplied)
Combustion Air
Vent
Flush to 1
max.
A07723
Table5–GasPressures
Gas Piping Requirements
NOTE: The gas supply line must be installed by a qualified service technician in accordance with all building codes.
NOTE: In the state of Massachusetts.
a. Gas supply connections MUST be performed by a li-
censed plumber or gas fitter.
b. When flexible connectors are used, the maximum
length shall not exceed 36(914.4 mm).
c. When lever handle type manual equipment shutoff
valves are used, they shall be T--handle valves.
d. The use of copper tubing for gas piping is NOT ap-
proved by the state of Massachusetts.
1. Install gas piping in accordance with local codes, or in the absence of local codes, the applicable national codes. Re­fer to the current edition of NFPA 54/ANSI Z223.1 for proper gas pipe size.
2. It is recommended that a manual equipment shutoff valve be installed in the gas supply line outside the furnace. Locate valve as close to the furnace as possible where it is readily accessible. Refer to Fig. 34.
3. Use black iron or steel pipe and fittings or other pipe ap­proved by local code.
4. Use pipe thread compound which is resistant to natural and Propane gases.
5. Use ground joint unions and install a drip leg no less than 3long to trap dirt and moisture before it can enter gas control valve inside furnace.
NOTE: Refer to Fig. 34 for the general layout at the furnace. The rules listed apply to natural and Propane gas pipe installations.
NOTE: Install the gas pipe grommet to the furnace side panel with the gas pipe entry. If needed, remove the 2” hole plug from the plastic accessory bag and relocate to the open hole in the furnace side panel.
6. Use two pipe wrenches when making connections to pre­vent gas valve from turning.
7. Install a manual shut--off valve external to furnace casing and tighten all joints securely.
8. If local codes allow the use of flexible gas appliance con­nectors, always use a new listed connector. Do not use a connector which has previously serviced an­other gas appliance.
9. Flexible corrugated metal gas connector may NOT be used inside the furnace or be secured or supported by the furnace or ductwork.
10. Properly size gas pipe to handle combined appliance load or run gas pipe directly from gas meter o r Propane gas reg­ulator.
11. Install correct pipe size for run length and furnace rating.
12. Measure pipe length from gas meter or Propane second stage regulator to determine gas pipe size.
32
Additional Propane Connection
*
Requirements
1. Have a licensed Propane gas dealer make all connections at storage tank and check all connections from tank to fur­nace.
2. If copper tubing is used, it MUST comply with limitation set in National Fuel Gas Code or CGA codes.
3. Two--stage regulation of Propane gas is recommended.
Propane Conversion
!
WARNING
FIRE, EXPLOSION HAZARD
Failure to follow this warning could result in personal injury or death.
A Propane conversion accessory kit is required when operating the furnace with Propane gas.
An accessory kit shall be used to convert to propane gas use, see the furnace rating p late for the Propane conversion accessory kit part number.
Supply Pressure
!
WARNING
FIRE HAZARD
Failure to follow this warning could result in personal injury or death.
Do NOT set input rating above that shown on rating plate.
1. A1/8″ NPT plugged tapping, accessible for a test gauge connection, must be installed immediately upstream of the gas supply connection to the furnace.
2. Gas input to burners MUST NOT exceed the rated input shown on rating plate.
3. Do NOT allow minimum gas supply pressure to vary downward. Doing so will decrease input to furnace. Refer to Table 6 and Table 7 for normal gas supply and manifold pressures.
Manifold Gas Pressure Adjustment
SEE CHECKS AND ADJUSTMENTS, Manifold Gas Pressure Adjustment in this manual.
PG9YAA
Drip Leg and Union, Union* should be outside the cabinet. Manual shut- off valve MUST be upstream of dripleg, union, and furnace.
Use elbows and 3″pipe nipple to connect valve to piping when using right side gas pipe entry.
O
O
F
F
Propane Low pres­sure switch REQUIRED.
3
O
N
O
F
F
pipe
nipple
Union may be installed inside the cabinet when necessary
because of clearances.
Representative drawing only, some models may vary in appearance.
Fig. 34 -- Typical Gas Piping for Upflow
Manual shut-off valve
N
Vent Pipe Grommet (Single Pipe)
O
N O
F
F
Models may have 1 or 2 pressure switches
Alternative installation
A07724
33
NATURAL GAS MANIFOLD PRESSURE (in wc)
HEATING
VAL UE
at ALTITUDE
BTU/CU. FT.
700 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 42 3.6
725 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 42 3.5 42 3.4
750 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 42 3.3 42 3.2
775 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 41 2.9 43 3.7 43 3.6
800 -- -- -- -- -- -- -- -- -- -- -- -- 42 3.1 43 3.6 43 3.5 43 3.4
825 -- -- -- -- -- -- -- -- 43 3.7 43 3.6 43 3.4 43 3.3 44 3.6
850 -- -- -- -- -- -- -- -- 43 3.5 43 3.4 44 3.7 44 3.6 44 3.4
875 -- -- -- -- 43 3.4 43 3.3 44 3.6 44 3.5 44 3.4 44 3.2
900 -- -- -- -- 44 3.7 44 3.6 44 3.4 44 3.3 44 3.2 44 3.1
925 44 3.7 44 3.5 44 3.4 44 3.2 44 3.1 45 3.6 45 3.5
950 44 3.5 44 3.3 44 3.2 44 3.1 45 3.6 45 3.5 45 3.3
PG9YAA
975 44 3.3 44 3.1 45 3.7 45 3.5 45 3.4 45 3.3 45 3.2
1000 44 3.2 45 3.6 45 3.5 45 3.4 45 3.2 45 3.1 46 3.1
1050 46 3.6 45 3.3 45 3.2 45 3.1 46 3.1 -- -- -- -- -- -- -- --
1100 46 3.3 45 3.0 46 3.0 46 2.9 -- -- -- -- -- -- -- -- -- -- -- --
Conversion: 1 in wc = .25 kPa NOTE:
Natural gas data is based on 0.60 specific gravity. For fuels with different specific gravity consult the National Fuel Gas Code ANSI Z223.1---2006/NFPA 54---2006 or National Sta ndard of Canada, Natural Gas And Propane Installation Code CSA B149.1--- 05.
Orifice
No.
0to
2000
Manifold
Pressure
Orifice
No.
MEAN ELEVATION FEET ABOVE SEA LEVEL
2001 to
3000
Manifold Pressure
Orifice
No.
3001 to
4000
Manifold Pressure
Orifice
Table 6 – Natural Gas Manifold Pressure
No.
4001 to
5000
Manifold Pressure
Orifice
No.
5001 to
6000
Manifold
Pressure
Orifice
No.
6001 to
7000
Manifold
Pressure
Orifice
No.
7001 to
8000
Manifold
Pressure
PROPANE GAS MANIFOLD PRESSURE (in wc)
HEATING VALUE
at ALTITUDE
BTU/CU. FT.
2500 10.0 8.9 8.4 10.0 10.0 10.0 10.0
Orifice Size #55 #55 #55 #56 #56 #56 #56
Conversion: 1 in wc = .25 kPa NOTE:
Propane data is based on 1.53 specific gravity. For fuels with different specific gravity consult the National Fuel Gas Code ANSI Z223.1---2006/NFPA 54--- 2006 or National Stan dard Of Canada, Natural Gas And Propane Installation Code CSA B149.1--- 05.
NOTE: The derating of these furnaces at 2% (Natural Gas) and 4% (Propane Gas) has been tested and design ---certified by CSA.
In Canada, the input rating must be derated 5% (Natural Gas) and 10% (Propane Gas) for altitudes of 2,000 to 4,500 above sea level. Use the 2001 to 3000 column in Table 6 and Table 7.
0to
2000
2001 to
3000
Table 7 – Propane Gas Manifold Pressure
The burner orifice part nos. are as follows: Orifice #41 333730--701
Orifice #42 333730--702 Orifice #43 333730--703 Orifice #44 333730--704 Orifice #45 333730--705 Orifice #46 333730--709
Orifice #54 333730--706 Orifice #55 333730--707 Orifice #56 333730--708
General Derating Rules
1. These furnaces may be used at full input rating when in-
stalled at altitudes up to 2,000. When installed above 2,000, the input must be decreased 2% (natural) or 4% (Propane) for each 1000above sea level in the USA. In Canada, the input rating must be derated 5% (natural) or 10% (Propane) for each 1000above sea level. See Table 6 or Table 7 for required high altitude input rate.
2. For operation with natural gas at altitudes above 2,000′,
orifice change and/or manifold pressure adjustments may be required for the gas supplied. First consult your local gas supplier, then refer to Table 6 for required pressure change and/or orifice change for high altitudes.
MEAN ELEVATION FEET ABOVE SEA LEVEL
3001 to
4000
4001 to
5000
5001 to
6000
3. For operation with Propane gas, gas orifices MUST be changed and manifold pressure MUST be maintained as per Table 7. Orifices can be ordered through our distribut­or. (See Fig. 35).
High Altitude Input Rate =
Nameplate Sea Level Input Rate x (Multiplier)
[USA]
Elevation
2001- 3000 0.95 0.90
3001- 4000 0.93 0.86
4001- 5000 0.91 0.82
5001- 6000 0.89 0.78
6001- 7000 0.87 0.74
7001- 8000 0.85 0.70
* Based on mid---range of elevation.
High Altitude Multiplier
Natural Gas Propane Gas
High Altitude Air Pressure Switch
Altitudes over 4,000may require a different air pressure switch than the one installed at the factory. Check parts list for pressure switch and consult your distributor for part number and availability. In Canada, provincial codes may govern installation of switch. Check with governing authorities.
34
6001 to
7000
7001 to
8000
Changing Orifices for High Altitude
!
WARNING
ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death, and/or property damage.
Turn OFF electric power (at disconnect) and gas supply (at manual valve in gas line) when installing orifices. Installation of orifices requires a qualified service technician.
NOTE: Main burner orifices can be changed for high altitudes.
1. Disconnect gas line from gas valve.
2. Remove manifold from furnace.
3. Remove the orifices from the manifold and replace them with properly sized orifices.
4. Tighten orifices so it is seated and gas tight. (See Fig. 35)
5. Reinstall manifold. Ensure burners do NOT bind on new orifices.
Natural Gas Input Rating Check
SEE CHECKS AND ADJUSTMENTS, Natural Gas Input Rating Check in this manual.
Measure from face of orifice tothebacksideofthe manifold.
1.11″ (28.2mm)
1.21(30.8mm)
sure testing of the gas supply system at test pressure equal to or less than
4. Apply a commercial soap solution to all joints to test for leaks. Correct any leaks indicated by bubbles.
5. Correct even the smallest leak at once.
6. Check for leaks at gas valve and orifice connections to the burner manifold while the furnace is operating.
1
/2PSI (3.5 kPa).
ELECTRICAL WIRING
Power Supply Wiring
The furnace MUST be electrically wired and grounded in accordance with local codes, or in the absence of local codes with the latest edition of The National Electric Code, ANSI NFPA 70 and/or The Canadian Electric Code CSA C22.1.
The power supply to the furnace connections must be between 104 VAC and 127 VAC during furnace operation for acceptable performance.
Field wiring connections must be made inside the furnace connection box. A suitable strain relief should be used at the point the wires exit the furnace casing.
Copper conductors shall be used. Line voltage wires should conform to temperature limitation o f 63° F(35° C) rise and be sized for the unit maximum amps stated on the rating plate. Add the full load amps for potential field-- installed accessories such as electronic air cleaners and humidifiers that would receive power from the furnace control. The furnace contro l is rated for a maximum of 1.0 amp combined for EAC and HUM. Consult NEC or local codes for proper wire and circuit sizing.
NOTE: Furnace will not have normal operation if line polarity is reversed. Check ALL field and control connections prior to operation.
PG9YAA
Fig. 35 -- Changing Orifices
Final Gas Piping Check
!
WARNING
FIRE OR EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death, and/or property damage.
Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections. A fire or explosion could result causing property damage, personal injury and/or loss of life.
1. The furnace and the equipment shut off valve must be dis­connected from the gas supply piping system during any pressuretestingofthatsystemattestpressuresinexcessof
1
/2PSIG. Close the manual shut--off valve before testing
at such pressures.
2. When installation is complete, test all pipe connections for leaks w ith the gas pressure less than valve.
3. The furnace must be isolated from the gas supply system by closing the equipment shut off valve during any pres-
1
/2PSIG to the gas
A07725
Junction Box (J- Box) Relocation
The J--box is installed on left side of casing. An alternate j--box location on right side can be used.
1. Remove bag containing two hole plugs and two self tap­ping screws from loose parts bag in blower compartment.
2. Remove two screws holding J--Box to casing.
3. Move large hole plug from right to left J--Box location.
4. Clip wire tie holding J--Box wires.
5. Move J-- Box to alternate location and attach using two self
tapping screws from bag.
6. Apply two hole plugs from bag at left J--Box location.
Thermostat
Thermostat location has an important effect on the operation of the unit. Follow instructions included with thermostat for correct mounting and wiring.
Low voltage connections to furnace must be made on terminal board of furnace control.
Heat anticipator setting will need to be measured if 24VAC humidifier is installed. Measure current in series from R to W at the thermostat. Be sure 24VAC humidifier is wired up to control. Allow furnace to operate for 2 minutes before recording the AC amperage reading. Set anticipator on thermostat to recorded value.
35
Optional Equipment
All wiring from furnace to optional equipment MUST conform to local codes or, in the absence of local codes with the latest edition of The National Electric Code, ANSI NFPA 70 and/or The Canadian Electric Code CSA C22.1. Install wiring in accordance with manufacturer’s instructions. The wiring MUST have a minimum temperature rating of 105° C.
Humidifier/Electronic Air Cleaner
The furnace is wired for humidifier and/or electronic air cleaner connection.
PG9YAA
!
REDUCED FURNACE LIFE HAZARD
Failure to follow this caution may result in reduced furnace life.
Do NOT exceed 115V/1.0 amp. maximum current load for both the EAC terminal and the HUM terminal combined.
CAUTION
Furnace Control Fuse
The 24V circuit contains a 5--amp, automotive-- type fuse located on furnace control. (See Fig. 37) Any electrical shorts of 24V wiring during installation, service, or maintenance may cause fuse to blow. If fuse replacement is required, use only a fuse of identical size (5 amp.)
Blower Off Delay Jumper
24 VAC HUM
FUSE
Diagnostic Light
115 VAC HUM
EAC
HUMIDIFIER -- The HUM (115) is energized when the p ressu re switch closes on a call for heat. The HUM is energized when the inducer is energized.
ELECTRONIC AIR CLEANER -- EAC is energized when there is a blower speed call, except is NOT energized when blower operates in the hard--wired continuous fan mode.
Furnace Control
The furnace control is preset at the factory with a fixed blower ON delay of 30 seconds in the heating mode. The blower OFF timing is preset at 140 seconds. If d esired, the fan OFF delay can be reset to obtain the longest delay times while still maintaining comfort levels. See “Furnace Wiring Diagram” .
NOTE: Junction Box can be mounted to either the left or right side.
115V. 6 0 Hz
HOT
NEUT.
W BK
G
Connection
Box
Ground
Low Voltage Terminal Board
W
G
R
NOTE: 115 VAC/60Hz/single-- phase Operating voltage range*: 127 VAC max, 104 VAC min.
* Permissible limits of voltage at which unit will operate satisfactorily
Representative drawing only, some models may vary in appearance.
R
G
W
Y
G
Fig. 36 -- Electrical Connections
O N
O F
F
Models may have 1 or 2 pressure switches
A07726
A07727
Fig. 37 -- Control Board
DUCTWORK AND FILTER
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Do NOT draw return air from inside a closet or utility room where furnace is located. Return air duct MUST be sealed to furnace casing.
Installation
NOTE: Design and install the air distribution system to comply with Air Conditioning Contractors of America manuals and/or NFPA pamphlets 90A and 90B or other approved methods that conform to local codes and good trade practices.
1. When furnace supply ducts carry air outside furnace area, seal return air duct to furnace casing and terminate duct outside furnace space.
2. Install air conditioning cooling coil (evaporator) on outlet side of furnace.
3. For furnaces installed without a cooling coil it is recom­mended that the outlet duct be provided with a removable access panel. This panel should be accessible when the furnace is installed so the exterior of the heat exchanger can be viewed for inspections. The access panel MUST be sealed to prevent leaks.
4. If separate evaporator and blower units are used, install good sealing dampers for air flow control. Chilled air go­ing through the furnace could cause condensation and shorten the furnace life.
NOTE: Dampers (field supplied) can be either automatic or manual. Manually operated dampers MUST be equipped with a means to prevent furnace or air conditioning operation unless damper is in the full heat or cool position.
36
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Cool air passing over heat exchanger can cause condensate to form resulting in heat exchanger failure.
Connections
NOTE: On upflow installations, return air can enter through either side, both sides, or the bottom. On horizontal installations the return air must enter through the knockout opening in the lower panel of the furnace. Return air can not of the furnace. When the furnace is located in an area near or adjacent to the living area, the system should be carefully designed with returns to minimize noise transmission through the return grille. Any blower moving a high volume of air will produce audible noise which could be objectionable to when the unit is located very close to living areas. It is advisable to route the return air ducts under the floor or through the attic.
1. For side connections using a 16x25″ (406.4 x 635.0
mm) filter, cut out the embossed area shown in Fig. 38. This will provide a 14 approximate opening.
NOTE: Furnaces with 5 ton cooling rating may require both (left and right) side return or one side and bottom return. Side return air duct(s) is not permitted with horizontal furnace installation.
1
A=14
/2″ Height of Cutout for 16″ x25″ Filter
1
B=22
/2″ Width of Cutout for 16″ x25″ Filter
1
/2″ x221/2″ (368.3 x 571.5 mm)
enter through rear
Sizing
Existing or new ductwork MUST be sized to handle the correct amount of airflow for either heating only or heating and air conditioning.
Insulation
1. Insulate ductwork installed in attics or other areas exposed to outside temperatures with a minimum of 2(50.8 mm) insulation and vapor barrier.
2. Insulate ductwork in indoor unconditioned areas with a minimum of 1(25.4 mm) insulation with indoor type va­por barrier.
Filters
A Filter must be used: Filters are not supplied with these furnaces, but can be purchased
from the distributor. Use either filter type:
S Washable, high velocity filters are based on a maximum
air flow rating o f 600 FPM.
S Disposable, low velocity filters are based on a maxim-
um air flow o f 300 FPM when used with filter grille.
S See Circulating Air Blower Data for additional d ata.
NOTE: Disposable, low velocity filters may be replaced with washable, high velocity filter providing they meet the minimum size areas. Washable, high velocity filters can be replaced ONLY with same type and size.
PG9YAA
B
Embossed Area on Side of Furnace
A
Furnace Bottom
A07728
Fig. 38 -- Side Return Air Cutout
2. Bottom returns can be made by removing the knockout panel in the furnace base. Do NOT remove knock-out ex­cept for a bottom return.
3. Installation of locking-type dampers are recommended in all branches, or in individual ducts to balance system’s air flow.
4. Non-combustible, flexible duct connectors are recommen­ded for return and supply connections to furnace.
5. If air return grille is located close to the fan inlet, install at least one, 90° air turn between fan and inlet grille to re­duce noise.
NOTE: To further reduce noise, install acoustical air turning vanes and/or line the inside of duct with acoustical material.
A07729
Fig. 39 -- Side Mounted Filter Rack
Filter Installation using Optional Filter Rack
When installing or removing a bottom mounted filter, slide the two side filter clips to the back of the furnace BEFORE installing or removing. This will allow the filter to clear the front raised edge of the furnace. Insert filter into side clips first and push filter back until it is fully engaged into back clip. When filter is in place, slide clips b ack into place midway on filter as shown in Fig. 40 and Fig. 41.
37
Center Clip s i d e -- t o -- s i d e
application. The coil installation instructions must be consulted for p roper coil location and installation procedures. With a parallel flow arrangement, dampers must be installed to prevent chilled air from entering the furnace. If manually operated dampers are used, they must be equipped with a means to prevent operation of either unit unless the damper is in full heat or full cool position.
A3″ (76.2 mm) clearance is required on the right side of the furnace in order to run the copper or plastic tubing for the condensate drain line.
9
Fig. 40 -- Bottom Mounted Filter Rack
PG9YAA
11/2″
3
26 Ga. Galvanized Steel FAST part number 1008482
Fig. 41 -- Filter Clip Construction
Refer to Fig. 42 and for guidelines to install filters. Furnaces which require larger filter media and have limited clearances on one side of furnace, require a standoff filter rack, see Fig. 42, available from your distributor.
11/4″
11
/16″
A07691
A07730
!
UNIT OPERATIONAL HAZARD
Failure to follow this caution may result in improper unit operation.
This furnace is not approved for use with “N” style evaporator coils. If installed with an “N” style evaporator coil, improper limit operation may occur.
CAUTION
CHECKS AND ADJUSTMENTS
NOTE: Verify the input rate of the furnace.
!
WARNING
FIRE OR EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death and /or property damage.
Turn OFF gas at shut off before connecting manometer.
Startup
NOTE: Refer to the start--up procedures in the “User’s Information Manual”ortothe“Operating Instructions Label”on
the furnace.
!
WARNING
Using Optional Standoff Filter Rack
A07731
Fig. 42 -- Standoff Filter Rack
Addition Of Air Conditioning
When a refrigeration coil is used in conjunction with this unit, it must be installed parallel with or on the discharge side of the unit to avoid condensation on the heat exchanger. All furnaces are designed with a b reak--away duct flange on the supply air side of the furnace. This allows for installation in the horizontal right
ELECTRICAL OPERATION HAZARD
Failure to follow this warning could result in personal injury, death, and/or property damage.
If any sparks, odors or unusual noises occur, immediately shut OFF power to the furnace. Check for wiring errors or obstruction to blower.
Gas Supply Pressure
Gas supply pressure should be within minimum and maximum values listed on rating plate (minimum and maximum pressures, refer to Table 5). Pressures are usually set by g as suppliers.
Manifold Gas Pressure Adjustment
NOTE: Make adjustment to manifold pressure with burners operating.
1. Remove the burner compartment door.
2. Remove the blower compartment door. Place a jumper across furnace controls R to W. Replace blower compart­ment door.
3. With gas OFF, connect manometer to tapped opening on gas valve. Use manometer with a 0 to 15 inches of water column range.
38
4. Turn gas ON and remove adjustment screw cover on gas valve. Turn adjusting screw counterclockwise to decrease manifold pressure and clockwise to increase pressure.
NOTE: Adjustment screw cover MUST be replaced on gas control valve before read ing manifold pressure and operating furnace.
5. Set manifold pressure to value as shown in Table 6 or Table 7 under GAS SUPPLY AND PIPING section in this manual.
6. When the manifold pressure is properly set, replace the ad­justment screw cover on the gas control valve.
Burner Face
A07734
Fig. 44 -- Main Burner
Regulator Adjustment Under Cap
INLET
Inlet Pressure
1
/8NPT
Tap
ON
IN
OFF
HONEYWELL
Outlet Pressure Tap
1
/8NPT
OUTLET
A07732
Fig. 43 -- Typical Gas Valve
7. Remove blower compartment door. Remove jumper wire from thermostat connection on furnace control board. Re­move manometer connection from manifold pressure tap, and replace plug in manifold.
8. Check for leaks at plug.
9. Replace the burner and blower compartment doors.
Natural Gas Input Rating Check
NOTE: The gas meter can be used to measure input to furnace. Rating is based on a natural gas BTU content of 1,000 BTU’s per cubic meter. Check with gas supplier for actual BTU content.
1. Turn OFF gas supply to all appliances and start furnace. Use jumper wire on R to W for Heat.
2. Time how many seconds it takes the smallest dial on the gas meter to make one complete revolution. Refer to
Example.
NOTE: If meter uses a 2 cubic foot dial, divide results
(seconds) by two.
NOTE: For Ignite location see Fig. 45
1/
2
(52.4)
5
/16(8)
16
1
/4(6.4)
A07735
Fig. 45 -- Igniter Location
Temperature Rise Check
The blower speed MUST be set to give the correct air temperature rise through the furnace as marked on the rating plate. Temperature rise is the difference between supply and return air temperatures.
To check temperature rise,use the following procedure:
1.Place thermometers in supply and return air registers as close to furnace as possible, avoiding direct radiant heat from heat exchangers.
2.Operate furnace continuously for 15 minutes with all registers and duct dampers open.
3.Take reading and compare with range specified on rating plate.
4.If the correct amount of temperature rise is NOT obtained, it may b e necessary to change blower speed. A higher blower speed will lower the temperature rise. A lower blower speed will increase the temperature rise.
Changing Blower Speed
PG9YAA
Example
Natural Gas BTU Content
1,000 3,600 48 75,000
No. of Seconds Per Hour
1,000 x 3,600 ÷ 48 = 75,000 BTUH
3. Remove jumper wire from R to W.
4. Relight all appliances and ensure all pilots are operating.
Time Per Cubic Foot in Seconds
Main Burner Flame Check
Allow the furnace to run approximately 10 minutes then inspect the main burner. See Fig. 44.
Check for the following (Fig. 44):
S Stable and blue flames. Dust may cause orange tips or wisps of
yellow, but flames MUST NOT have solid, yellow tips.
S Flames extending directly from burner into heat exchanger.
S Flames do NOT touch sides of heat exchanger
If any problems with main burner flames are noted, it may be necessary to adjust gas pressures, or ch eck for drafts.
.
BTU Per
Hour
!
WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
Turn OFF power to furnace before changing speed taps.
NOTE: The speed taps that the manufacturer sets from the factory for this product are based on a nominal 400 CFM per ton cooling and the basic mid range on the temperature rise for heating.
Since the manufacturer cannot establish the static pressure that will be applied to the unit, it is the responsibility of the installer dealer/contractor to select the proper speed taps for the application when the unit is installed.
If it is necessary to change speeds, refer to steps below.
39
!
REDUCED FURNACE LIFE HAZARD
Failure to follow this caution may result in reduced furnace life.
Use ONLY the blower motor speed taps insert indicated in the Circulation Air Blower Data for setting air temperature rise.
CAUTION
Wire Color Motor Speed
Black High
Orange* Med--High
Blue Medium
Red Low
* Med--High speed may not be provided on all models.
PG9YAA
1. Refer to Furnace Wiring Diagram for location of the heat­ing and cooling speed taps located on the furnace control as well as location of unused blower motor speed leads. Use the chart (Table 8) to determine the blower motor speed settings.
2. Change the heat or cool blower motor speed by removing the motor lead from the “Heat”or“Cool” terminal and replace it with the desired motor s peed lead from the “Unused Motor Lead” location. Connect the wire previ­ously removed from the “Heat”or“Cool” terminal to the vacated “Unused Motor Lead” terminal.
3. If the same speed must be used for both heating and cool­ing, remove the undesired motor speed lead from the “Heat”or“Cool” terminal and connect that lead to the open terminal at “Unused Motor Lead” location. Attach a jumper between the “Heat”and“Cool” terminals and the remaining motor speed lead.
NOTE: For motors with (4) speed leads, it will be necessary to tape off the terminal of the motor speed lead removed from the “Heat”or“Cool” terminal with electrical tape since an open terminal will not be available at the “Unused Motor Lead” location.
Table 8 – Blower Speed Chart
Continuous- Fan Operation using “G”
Energizing the “G” terminal on the furnace control provides continuous fan operation. This is done by connecting the G terminal of the thermostat to the G terminal on the furnace control. When the FAN switch is turned from auto to ON the fan will operate continuously at “HEAT” speed. EAC will be energized in this mode.
NOTE: In heating, the fan will turn off during furnace ignition and warm up then restart at heating speed.
Hard Wired Continuous Fan Operation
A terminal is provided on the furnace control board located in the circulating blower compartment for operation of the continuous fan option. This connection is intended for the low speed motor tap, and has a lower contact rating (8 amps) than the heat and cool taps. When the low speed blower lead is connected to this terminal, this will provide low speed blower operation whenever the other two speeds (Heat or Cool) are not energized.
Thoroughly check the system after modification to ensure the proper operation of the circulating air blower in all modes of operation.
Separate Speed Selections for Heat, Cool, and Continuous Fan
Connect low speed lead from circulating motor to the “Cont.” terminal at the furnace control. The appropriate motor leads should already be connected to the “Heat”and“Cool” terminals.
Heating a nd Continuous Blower Speed the Same
If it is necessary to operate the heating speed and continuous blower speed using the same blower speed, connect a jumper between the “Heat”and“Cont.” terminals on the furnace control.
NOTE: There should be only ONE motor lead going to the “Heat”and“Cont.” terminals.
FURNACE MAINTENANCE
!
WARNING
FIRE, EXPLOSION, OR CARBON MONOXIDE HAZARDS
Failure to follow this warning could result in personal injury, death and/or property damage.
It is recommended that the furnace be inspected and serviced on an annual basis (before the heating season) by a qualified service technician.
!
WARNING
ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death, and/or property damage.
Before servicing, disconnect all electrical power to furnace.
When servicing controls, label all wires prior to disconnecting. Reconnect wires correctly.
Verify proper operation after servicing.
See “User’s Information Manual” and the “Ser vice Manual”.
SEQUENCE OF OPERATION
& DIAGNOSTICS
Following is the normal operating sequence:
Cooling (Y) Request:
24VAC signals applied to Y & G terminals of FCB (furnace control board)
S Cool motor speed is energized after 5 second Cool Fan On
Delay time.
Y & G signals removed from FCB
S Cool motor speed is de --energized after 90 second Cool Fan
Off Delay time.
Continuous Circulating Fan (G) Request:
S 24 VAC signal is applied to G terminal of the FCB.
S Heat motor speed is energized without delay.
S G signal removed from FCB.
40
S Heat motor speed is de --energized after 5 second delay.
NOTE:
(1.) Furnace de-- energizes the fan during the heat ex-
changer warm--u p period on a call for Heating that occurs during a G request unless a blower motor lead is connected to the Cont terminal on the FCB, in which case see NOTE 2).
(2.) Heating or Cooling requests received during a Fan
request cause the fan speed to change to the ap­propriate heat or cool speed after the Fan on Delay time expires. The fan returns to continuous circulating speed after the selected Fan Off Delay time expires following loss of the Heating or Cooling request.
Continuous Circulating Fan Hard-Wired (Cont) Request
Field selected low speed motor tap installed on “CONT” terminal.
S Low speed is energized when power applied to furnace.
Operates at this speed continuously while there are no other
blower demands from furnace control. Fan demands from
furnace control for heat, cool or “G” will override hard--wired
speed tap.
NOTE: EAC is NOT active for hard --wired mode but IS active for fan demands from furnace control for heat, cool and “G”.
Heating (W) Request:
Heating (W) Request:
S 24 VAC signal applied to W terminal of FCB.
S Inducer motor turns on and the pressure switch(es) close(s)
S Following a 15 second prepurge delay, after the pressure
switches closes, the igniter begins a 17 second warm--up.
S The gas valve is energized, the main burners light and flame is
sensed.
S The igniter is d e--energized after the main burners ignite.
S FCB will delay blower operation for the 30 seconds timed from
the opening of the gas valve.
S W signal removed from FCB.
S The gas valve de--energizes and the main burners go out.
S The inducer runs for a 15 second postpurge period.
S The fan stays at Heat speed.
S The fan de--energizes after the selected Heat Fan Off Delay
time expires, timed from the gas valve de--energizing.
HUMIDIFIER -- The 24V HUM is energized when the pressure switch closes on a call for heat. The 115V HUM (called HUM on Control) is energized when the inducer is energized.
ELECTRONIC AIR CLEANER -- EAC is energized when there is a blower speed call. It is NOT energized when blower operates in the hard--wired continuous fan mode.
NOTE: If a new Heating request arrives while the control is waiting in the Heat Fan Off Delay time, the FCB will wait for the selected Heat Fan Off Delay then start a new heating cycle as long as the heat call remains.
Heating Request with Gas Shut Off:
24 VAC signal applied to W terminal of FCB. The FCB will attempt 4 cycles for ignition then go to soft lockout for 3 hours then try for ignition again as long as the heat call remains. Power reset will clear lockout.
S Inducer motor turns on
S Following a 15 second prepurge delay, the igniter b egins warm
up.
S The igniter glows red--hot for 22 seconds, then turns off. The
FCB flashes error code 6.
S The igniter stays off for 17 seconds, then begins to warm up
again.
S The igniter glows red hot for 22 seconds then turns off. The
FCB continues flashing error code 6.
S The igniter stays off for 17 seconds, then begins to warm up
again.
S The igniter glows red hot for 22 seconds then turns off. The
FCB continues flashing error code 6.
S The igniter stays off for 17 seconds, then begins to warm up
again.
S The igniter glows red hot for 22 seconds then turns off. The
FCB proceeds to soft lockout and stops flashing error code 6
and begins flashing error code 6 + 1.
S The inducer motor de--energizes after a 15 second post purge.
Blower Off Delay Jumper
24 VAC HUM
FUSE
Fig. 46 -- Control Board
Diagnostic Light
115 VAC HUM
A07733
PG9YAA
41
Control Board Diagnostic Codes
OFF = 24VAC or 115VAC is off, fuse is open Heartbeat = Normal operation or no previous Diagnostic Code ON SOLID = Soft Lockout --- Furnace Control Error (1 hr. delay) If code repeats immediately following power reset
then replace control 1Flash =Notused 2Flashes = Pressure switch(es) closed when should be open 3Flashes = Pressure switch open when should be closed 4Flashes = Limit or roll ---out switch open (less than 2 minutes) 5Flashes = Flame sensed out of sequence 6Flashes = Failure to ignite or flame sense lost while running 6+1Flashes = Soft Lockout --- Max trials for ignition reached (3 hr delay) 7Flashes = Soft Lockout --- Limit or roll --- out switch open longer than two minutes (1 hr delay) (roll --- out switch
requires manual reset) 8Flashes = Permanent Lockout --- Gas valve relay contact stuck closed or miswired gas valve (power reset only) 10 Flashes = Line voltage (115VAC) polarity reversed. If twinned, refer to twinning kit instructions
* If status code recall is needed, briefly (2--- 3 seconds) remove then reconnect one limit switch wire (main or rollout) to display last stored status code. Do not removepowerorblowerdoorbeforeinitiatingstatus code recall or code will be lost. Code is automatically cleared after 72 hours or upon power reset.
* Proper flame sense microamps: 0.7 microamps D.C. minimum, 2.0 --- 4.0 microamps nominal
PG9YAA
Copyright 2009 CAC / BDP D 7310 W. Morris St. D Indianapolis, IN 46231 Printed in U.S.A. Edition Date: 03/09
Manufacturer r eserves the right to change, at any time, specifications and designs without notice and without obligations.
C a t a l o g N o : I M --- P G 9 Y A A --- 0 3
R ep l a c es : I M --- P G 9Y A A --- 0 2
42
Loading...