PAW HeatBloC K33MAX DN 25 Installation And Operation Instructions Manual

PAW GmbH & Co. KG
Böcklerstr. 11, D-31789 Hameln, Germany Phone: +49-5151-9856-0, Fax: +49-5151-9856-98 E-mail: info@paw.eu, Web: www.paw.eu
1 99360453x-mub-en – V04 2017/11
1 General Information

Contents

1 General Information ......................................................................................................... 3
1.1 Scope of these instructions .......................................................................................... 3
1.2 Designated use ............................................................................................................ 3
2 Safety instructions ........................................................................................................... 4
3 Product description .......................................................................................................... 5
3.1 Equipment .................................................................................................................... 5
3.2 Function ....................................................................................................................... 6
3.2.1 3-way mixing valve with bypass [specialist] ........................................................... 7
3.2.2 Check valve ........................................................................................................ 12
4 Assembly and installation [specialist] .............................................................................. 13
4.1 Installation and commissioning of the HeatBloC ......................................................... 13
4.2 Accessories: Cutting-ring compression fitting (not included in the scope of delivery) .. 16
5 Scope of delivery [specialist] .......................................................................................... 16
6 Technical data ............................................................................................................... 18
6.1 Pressure drop and pump characteristic curves ........................................................... 19
Item no. 99360453x-mub-en – Version V04 – Issued 2017/11
Translation of the original instructions
We reserve the right to make technical changes without notice!
Printed in Germany – Copyright by PAW GmbH & Co. KG
2 99360453x-mub-en – V04 2017/11
PAW GmbH & Co. KG
Böcklerstraße 11
D - 31789 Hameln, Germany
1 General Information

1 General Information

Carefully read these instructions before installation and commissioning. Save these instructions in the vicinity of the installation for future reference.

1.1 Scope of these instructions

These instructions describe the installation, commissioning, function and the operation of the mixed HeatBloC K33MAX DN 25. For other components of the installation, such as the pump, the controller or the modular distribution manifold, please observe the instructions of the corresponding manufacturer. The chapters called [specialist] are intended for specialists only.

1.2 Designated use

The HeatBloC may only be used in heating circuits taking into consideration the technical limit values indicated in these instructions. The HeatBloC must Improper usage of the HeatBloC excludes any liability claims.
not be used in drinking water applications.
This product complies with the relevant directives and is therefore labelled with the CE mark. The Declaration of Conformity is available upon request. Please contact the manufacturer.
Only use PAW accessories with the HeatBloC.
The wrapping materials are made of recyclable materials and can be disposed of with recyclable materials.
2017/11 99360453x-mub-en – V04 3
2 Safety instructions
CAUTION
Personal injury and damage to property!
not
NOTICE
Material damage due to mineral oils!
NOTICE
Damage to property!

2 Safety instructions

The installation and commissioning as well as the connection of electrical components require technical knowledge commensurate with a recognised vocational qualification as a fitter for plumbing, heating and air conditioning technology, or a profession requiring a comparable level of knowledge [specialist]. The following must be observed during installation and commissioning:
relevant local and national regulations
accident prevention regulations of the professional association
instructions and safety instructions of this manual
The HeatBloC must only be used in heating circuits filled with heating water according to VDI 2035 / Ö-Norm H 5195-1.
The HeatBloC must
Mineral oil products cause lasting damage to seals made of EPDM, whereby the sealant properties get lost. We do not assume liability nor provide warranty for damage to property resulting from sealants damaged in this way.
It is imperative to avoid that EPDM gets in contact with substances containing
mineral oils.
Use a lubricant based on silicone or polyalkylene and free from mineral oils, such as
Unisilikon L250L and Syntheso Glep 1 of the Klüber company or a silicone spray.
be used in drinking water applications.
It is mandatory to mount the contact thermostat at the flow.
Only in this way, it prevents the heating circuit from overheating.
4 99360453x-mub-en – V04 2017/11
3 Product description

3 Product description

The HeatBloC K33MAX is a preassembled group of fittings for heating circuits. The PAW HeatBloC is designed such that it can be directly mounted onto a PAW distribution manifold or a mounting plate. With transition connections, the HeatBloCs can also be mounted on modular distribution manifolds of other dimensions.

3.1 Equipment

A-1 Flow to the consumer circuit
A-2 Full metal thermometer with
immersion sleeve, integrated in the ball valve (flow)
A-3 Contact thermostat, adjustable
B Heating pump
C Constant-value mixing valve
with thermal control valve and adjustable bypass 0-50%
C-1 Flow from the heat generator
C-2 Return to the heat generator
C-3 Check valve, can be opened
D Return pipe
E Design insulation
with optimised function
F-2 Full metal thermometer with
immersion sleeve, integrated in the ball valve (return)
F-1 Return from the consumer circuit
2017/11 99360453x-mub-en – V04 5
3 Product description

K33MAX - constant value control circuit with 3-way mixing valve and bypass 0-50%

Application range:

3.2 Function

The flow temperature of the heating circuit is controlled by the integrated mixing valve. Hot water from the boiler and cold return water are mixed to obtain the desired constant flow temperature of the heating circuit.
The thermal control valve is integrated in the mixing valve and prevents the flow temperature from rising above the maximum temperature set. At the rotary knob of the mixing valve, the maximum temperature can be set between 35 °C and 55 °C depending on the installation.
Application example: Radiant panel heating systems operate on low temperature levels with small temperature differences and high flow rates. It is therefore sufficient to "inject" a small amount of hot water into the "warm" return water.
Consumer circuits with a considerably lower flow temperature than the boiler flow temperature
Small heating circuits with low output and low control requirements
Can be used instead of the K32 if the existing controller cannot actuate an additional mixing valve.
6 99360453x-mub-en – V04 2017/11
3 Product description
Note

3.2.1 3-way mixing valve with bypass [specialist]

The 3-way mixing valve is a constant-value mixing valve for radiant panel heating systems (radiant floor heating, wall heating etc.) which are operated with a constant flow temperature and thus guarantee a basic heat supply. The desired flow temperature can be set at the rotary knob. The mixing valve is equipped with a bypass which must be operated separately. Via this bypass, cold return water is added to the flow of the HeatBloC. This can result in an increase of the flow rate of the HeatBloC and in a decrease of the flow temperature.
When the heating circuit is delivered, the bypass is closed.
2017/11 99360453x-mub-en – V04 7
3 Product description
Adjustable bypass
1. During commissioning, determine the optimum bypass position for the operation of the installation through a trial-and-error process.
If the slot of the bypass screw is in a vertical position, the bypass is closed (normal operation).
If the slot of the bypass screw is in a horizontal position, the bypass is completely open. A maximum flow rate from the return to the flow line is thus enabled. This adjustment may be necessary for radiant floor heating systems which require a very high water flow volume. Because of the bypass, the flow temperature decreases and the control may be affected in a negative manner.
2. Check the position of the bypass during operation. Make sure that the flow rate is sufficient and that the desired temperature is reached.
8 99360453x-mub-en – V04 2017/11
3 Product description
T
flow
< T
fix
T
flow
≈ T
fix
T
flow
> T
fix
Thermal control valve
The thermal control valve keeps the flow line of the mixing valve completely open as long as the water from the flow line to the consumer is colder than the flow temperature set of the thermal control valve.
As soon as the water in the flow line has reached the temperature set (+/- 5 K) of the thermal control valve, the valve starts closing the flow line of the storage tank / modular distribution manifold and opens the return line to the same extent (coming from the consumers). The cold water from the return line is mixed in the control valve with the hot water from the flow line. Depending on the temperature, the thermal control valve opens or closes the flow line of the storage tank / modular distribution manifold.
With rising temperature in the flow line or rising temperature from the consumer return line, the thermal control valve shuts off the inlet of even hotter water. The temperature of the flow to the HeatBloC / consumer remains approximately constant during operation.
2017/11 99360453x-mub-en – V04 9
3 Product description
Mixing valve with flow on the right
Mixing valve with flow on the left
NOTICE
Damage to property!
Flow
Flow
Change of the flow line
The HeatBloC is available in two versions: with "flow on the right" and "flow on the left".
To change the flow line, a conversion kit for the mixing valve is mandatory!
A conversion without conversion kit leads to a malfunction of the mixing valve.
Please specify the following information when ordering the conversion kit:
- Nominal diameter of the group of fittings (see designation of the pump)
- PAW item number or PAW designation
- Change from/to: "change from flow on the right to flow on the left" or
10 99360453x-mub-en – V04 2017/11
"change
from flow on the left to flow on the right"
Proceeding:
Consider the flow direction of the pump!
3 Product description
1. Take off the thermometer handles (A-2, F-2) and remove the insulating front shell.
2. Take the group of fittings out of the insulating back shell.
3. Dismount the mixing valve (C) and assemble it as described in the instructions of the conversion kit.
4.
Interchange the return pipe (D) and the pump (B).
Turn the pump head such that the terminal box is directed to the top or to the centre of the group of fittings.
5. Dismount and interchange the ball valves.
6. Mount the HeatBloC and connect it to the installation.
7. Check all union nuts before commissioning and firmly tighten them if necessary.
8. Carry out a pressure test.
9. Mount the insulation and the thermometer handles (A-2, F-2)
2017/11 99360453x-mub-en – V04 11
3 Product description
Operation Filling, draining, venting

3.2.2 Check valve

The heating circuit is equipped with a check valve (C-3, opening pressure 200 mm wc) in the return line of the mixing valve. The check valve can be opened.
During operation, the marking must be directed to "Z".
The check valve is closed.
Flow only in the direction of the arrow.
For filling, draining and venting the installation, the marking must be directed to "A".
The check valve is open.
Flow in both directions.
12 99360453x-mub-en – V04 2017/11
4 Assembly and installation [specialist]
NOTICE
Damage to property!
Option 1:

4 Assembly and installation [specialist]

The HeatBloC K33MAX can be mounted on a PAW modular distribution manifold or on a wall bracket. The modular distribution manifold and the wall bracket are optional accessories and are thus not included in the scope of delivery.
The location of installation must be dry, load-carrying, frost-proof and protected against ultraviolet radiation in order to prevent material damage of the installation.

4.1 Installation and commissioning of the HeatBloC

The HeatBloC can be installed
on a PAW modular distribution manifold.
Consumer circuit
Return
Flow
2017/11 99360453x-mub-en – V04 13
Flow
Heat generator
Return
4 Assembly and installation [specialist]
Option 2:
Option 3:
on a mounting plate
Consumer circuit
Return
Flow
directly on a wall bracket
Return
Flow
Return
Flow
Return
Flow
Heat generator
Please observe the separate and respectively corresponding instructions regarding the installation of the distribution manifold, of the mounting plate and of the wall bracket.
14 99360453x-mub-en – V04 2017/11
4 Assembly and installation [specialist]
If PAW modular distribution manifold or transition connection is used:
(top view)
1
2
3
(side view)
Sealing ring
Flange
1. Take off the thermometer handles (A-2, F-2) and remove the insulating front shell of the HeatBloC.
Nut
2. Unscrew the nuts on the lower connections of the HeatBloC and take out the sealing rings.
Flange
3. Put the two nuts over the flanges.
4. Insert the sealing rings into the nuts.
5. Put the HeatBloC onto the two nuts.
6. Tighten the nuts. Make sure that the nuts do not get jammed and that the sealing rings do not slip.
7. Connect the HeatBloC to the installation by using the pipes. The installation to the piping must be carried out without any tension.
8. Connect the pump.
9. Mount the pipe contact thermostat (A-3) at the flow pipe.
10. Carry out a pressure test and check all thread connections.
11. Mount the insulating front shell and
2017/11 99360453x-mub-en – V04 15
the thermometer handles (A-2, F-2).
5 Scope of delivery [specialist]
NOTICE

4.2 Accessories: Cutting-ring compression fitting (not included in the scope of delivery)

The connection to the heating installation can be carried out fast, pressure-proof and without soldering if you use the optionally available compression fittings.
1. Push the union nut ② and the cutting ring ③ onto the
copper pipe ①. The pipe must protrude at least 3 mm
from the cutting ring in order to ensure the force transmission and the sealing.
2. Insert the support sleeve ④ into the copper pipe.
3. Insert the copper pipe with the plugged-on individual
parts (②, ③ and ④) as far as possible into the housing of the compression fitting ⑤.
4. First, screw the union nut ② manually.
5. Tighten the union nut ② by rotating one full turn.
Secure the housing of the compression fitting ⑤
against distort, in order to avoid damaging the sealing ring.
Not included in
the scope of delivery!

5 Scope of delivery [specialist]

Complaints and requests/orders of spare parts will only be processed with information on the serial number! The serial number is placed on the return pipe of the heating circuit.
16 99360453x-mub-en – V04 2017/11
5 Scope of delivery [specialist]
Item no. heating circuit
Pump
Item no.
EEI
Accessories
Item number
360453WY6 Wilo-Yonos PARA RS 25/6-RKA E1236046 < 0.20
360453WY8 Wilo-Yonos PARA RS 25/7.5-RKA E1236048 < 0.21
360453WH6 Wilo-Stratos PICO 25/1-6 E1239625 < 0.20
360453GL9 Grundfos UPML 25-95 Auto E121394 < 0.23
360453GM6 Grundfos UPM3 Auto L 25-70 PP3 E1212460 < 0.20
360453GH6 Grundfos Alpha2.1 25-60 E121391 < 0.17
Conversion kit for 3-way mixing valve "from flow on the left to flow on the right" 34044R
Conversion kit for 3-way mixing valve "from flow on the right to flow on the left" 34044L
Working element for thermal control valve, 45 °C G3807
Sealing set for mixing valve 37013
2017/11 99360453x-mub-en – V04 17
6 Technical data
K33MAX
DN 25 (1")
Dimensions
Connections
Technical data
Materials

6 Technical data

Centre distance (1) 125 mm
Width insulation (2) 250 mm
Height insulation (3) 383 mm
Installation length (4) 340 mm
Outlet (A-1, F-1) 1" internal thread
Inlet (C-1, C-2) 1½" external thread, flat sealing
Opening pressure check valve (C-3) 200 mm wc, can be opened
Valves and fittings Brass
Gaskets EPDM
Insulation EPP
18 99360453x-mub-en – V04 2017/11
6 Technical data
K33MAX
DN 25 (1")
Hydraulics
Maximum pressure 6 bars
Maximum temperature 110 °C
KVS value [m3/h] 4.1

6.1 Pressure drop and pump characteristic curves

Pressure [m wc]
Flow rate [l/h]
Pressure [kPa]
2017/11 99360453x-mub-en – V04 19
PAW GmbH & Co. KG
Böcklerstraße 11
D-31789 Hameln, Germany
99360453x-mub-en – V04 2017/11
Phone: +49 (0) 5151 9856 - 0
Fax: +49 (0) 5151 9856 - 98
www.paw.eu
Loading...