ASSEMBLY
INSTRUCTIONS
DOUBLE
ONE PIECE DOOR
WALL BEDS
STREAMLINE 3000

Piano
hinge
Both
edges to
be cut
at
17
degrees
Detail
DIAGRAM
1
17
deg.
angle
to
both
edges
(refer
to
detail
above)
370mm
220mm
Board
is
to
lean
back
against
the
back
rail
Pillowcatch
Head
Board
with 4 x
holes
Bolt
thru
back
of
pillowcatch
so
that
the
nut
is
on
the
inside
of
the
frame
Piano
Hinge
Cupboard
1.
Panels
(Double)
1 x Top
1 x Top
Back
Rail
1 x Back
Rail
1 x Front
Skirting
1 x Bottom
1 x Right
Hand
End
1 x Left
Hand
End
1 x Door
1 x Left
Hand
Frame
Rail
1 x Right
Hand
Frame
Rail
2 x Mid
Frame
Rail
1 x Top
Frame
Rail
1 x Bottom
Frame
Rail
2
x
3mm
Packers
Panel
#
1
2
3
4
5
6
7
8
9
10
11,
12
13
14
15,
16
Size
(mm)
1460 x 446 x 16
1460 x 250 x 16
1460 x 570 x
16
1460 x 100 x 16
1460 x 439 x
16
2100 x 480 x 16
2100 x 480 x 16
1996 x 1456 x 16*
1902 x 160 x 16
1902 x 160 x 16
1870 x 160 x 16
1364 x 160 x 16
1364 x 160 x 16
1800 x 30 x 16
This
is
the
recommended
cabinet
construction
method
to
ensure
the
mechanism
operates
correctly.
Variations
of
construction
should
be
checked
with
Pardo.
16
or
18mm
thick
particleboard
doors
are
recommended.
Mattress
size
1400 x 1900 x 250D
MAXIMUM
depth
Door + Mattress
58
kgs
MAXIMUM
weight
Cabinet
Components
Pillowcatch
Cabinet
Construction
10.
13.
11.
12.
14.
1.
2.
6.
3.
5.
4.
8.
9.
7.
*If door is produced in 2 x pieces additional structural support is required. Refer to detail H.

2 x
Counter
Balance
Mechanism
2 x Cabinet Angle Brackets
Bolts
/ Nuts / Screws - Various
2 x Mounting Brackets
2 x
Bed
Straps
28 Slats
56 Slat Cup Holders
1 x
Manual
Foot
64 x Cam
Bolts
10 x Green
Wall
Plugs
64 x Fix
Cams
2 x Handles
1 x Piano
Hinge
15 x Large
Trim
Caps
2.
Cabinet
Hardware
Mechanism
Components
4 x Nut,
Bolt
and
Double
Washer
setup

Skirting
Board
Wall
Cut
skirting recess
before
pushing cabinet
against
the
wall
End
Panel
Front
Panel
Base
Panel
DETAIL
B
Fastening
with
angle
brackets
DETAIL
A
Wall
plugs
Refer
to
detail
B
Refer
to
detail
A
3.
Step1 - Fixing
Cabinet
To
Wall
*
Lay
cabinet
face
down
with
bottom
facing
the
wall.
* To
ensure
the cabinet is flush against the wall when upright,
it
may
be
necessary
to
cut a larger recess
into
bottom
of
left
and
right hand
end
of cabinet.
*
Lift
cabinet
at
top,
pushing
towards
wall,
being
careful
to
have
sufficient
ceiling
clearance.
*
Place
cabinet
into
position
against
the
wall
and,
using a spirit
level
against
either
the
right
or
left
hand
end
and
the
top,
find
the
correct
vertical
and
horizontal
position.
Mark
this
position
on
the
wall
with a pencil.
PLEASE
NOTE
As
there is a lot
of tension
in
the
Wallbed when
in
the
open
position,
it
is
very
important
that
the
cabinet is
securely
fixed to
the
wall.
*
Locate
wall
studs
and
mark
clearly
with
pencil.
*
Sit
angle
brackets
in
cabinet
top,
flush
with
top
and
back
edge
and
against
the
wall
studs.
Ensure
that
the
twin
hole
side
of
bracket
is
against
the
wall.
*
Fix
angle
brackets
through
wall
into
studs
using
65mm
screws
.
*
Ensure
cabinet
is
in
correct
vertical
position.
Fix
bottom
of
brackets
into
cabinet
top
using
16mm
screws.
FASTENING
OPTIONS
1
(for
gyprock,
fibro
or timber walls)
FASTENING
OPTIONS
2
*
Ensure
cabinet
is
in
correct
vertical
position.
*
With a pencil
or
nail,
mark
the
wall
through
the
predrilled
holes
in
the
top
back
rail
and
the
bottom
back
rail.
*
Move
cabinet
aside.
Using a 6.5mm
masonry
bit,
drill
60mm
deep
holes
into
wall
and
insert
wall
plugs
supplied.
*
Move
cabinet
back
into
place
against
wall.
*
Fix
top
back
rail
to
wall
through
predrilled
holes
using
65mm
screws.
put
on
cover
caps.
(for
brick/masonry
walls)
*
Fix
bottom
back
rail
to
wall.
Countersink
screws
to avoid
pillow
catch
scraping
on
them.
*
Fix
bottom
back
rail
to
wall.
Countersink
screws
to avoid
pillow
catch
scraping
on
them.

DIAGRAM
4
DIAGRAM
5
5.
ADJUST
TENSION
COUNTER
BALANCE
MECHANISMS
Turn
tension
handles
clockwise
to
increase
tension
ADJUSTING LEVELLING SCREWS
Final
adjustment
of
doors
may
be
made
by
adjusting
levelling
screws
in
mounting
block
whilst
bed
is
open
at
30
degrees
Lift
doors up
to
within
30
degrees
of
closing
30
_
+

28
DOOR
1400
35
160
DETAIL F
N.T.S
Carcass Construction - Double
Manual
Foot
Wall
Bed
Mechanism
PLASTIC
CUP
(SLAT
HOLDER)
608
DOOR
160
32
62
SIDE
7mm
DIA.
THROUGH
HOLES
32
60
64
7
1996
SCREW
POINTS
FOR
FOOT / LEG
DETAILS G & H
N.T.S
1215
1368
1456
79
64
48
48
16
3
7.
Add full width 70MM x 45MM
timber structural support if door is
produced in 2 x pieces.
CONTINUOUS ANGLE
ALLROUND TO FIX