Panduit ZDINS24 Installation Manual

Page 1
Console
1
2
9
11
13
15
10
12
14
16
Setup
EIP Net
EIP Mod
Express Setup
Com
IN2 Ref IN1
9 12
13 16
DC -
Pwr A
DC +
DC -
Pwr A
DC +
IN1 IN2OUT
Alarm
!
Tecnology
TM
1 4
5 8
1
3
5
7
2
4
6
8
17 1
218
Console
1
2
9
11
13
15
10
12
14
16
Setup
EIP Net
EIP Mod
Express Setup
Com
IN2 Ref IN1
9 12
13 16
DC -
Pwr A
DC +
DC -
Pwr A
DC +
IN1 IN2OUT
Alarm
!
Tecnology
TM
1 4
5 8
1
3
5
7
2
4
6
8
17 1
218
2
4 6 8
1 3 5 7
18 20 22 24
17 19 21 23
10 12 14 16
9 11 13 15
48464442
47454341
32302826
31292725
40383634
39373533
1 2 3 5 6 74 + - + + -­INP SEN OUT GND
MOD NET CHG
PWR
1
0
CON 8 9
10
UPS
Maintenance-free No battery 24VDC
1 2 3 4
+ + + -
INOUT SENSE
UPS003LSM
LOAD SENSE MODULE
Panduit Pre-Configured Universal Distribution Frame (UDF) Installation Instructions Part Numbers: ZDINS24 and ZDINS25
Figure 1: Front of Universal Distribution Frame (UDF) tier, Rear of UDF tier
Table of Contents
Tier Overview ................................................................................................................................................ 1
Safety Information ........................................................................................................................................ 1
Tier Installation ............................................................................................................................................. 3
Thermal Considerations ................................................................................................................................ 8
Installing in 12RU Panduit Intermediate Distribution Frame ................................................................... 8
Installation in 26RU Panduit Intermediate Distribution Frame ................................................................ 9

Tier Overview

Panduit’s Universal Distribution Frame Tier allows two (2) industrial switches to be deployed using 19” rails. Each Panduit Universal Distribution Frame Tier also includes a patch panel, blanking panel, and cable management for a full solution.

Safety Information

The information and instructions contained in this document are not intended to be utilized as a substitute for proper training and experience in the safe installation and operation of product. Prior to installation, it is the Buyer’s responsibility to consult with the appropriate local Authority Having Jurisdiction (AHJ) for all applicable codes, permits, regulations, and standards. This product, including
00157EAO Rev00
www.panduit.com Page 1 of 9
Page 2
any equipment that may be installed inside, should only be installed and serviced by a licensed electrical contractor, or competent technician, that meets the following qualifications;
• Is thoroughly familiar with this product and the instructions for installation and operation.
• Is trained (accredited) in industry-accepted safe operating practices and procedures regarding
identification and mitigation of high- and low- voltage hazards and situations.
• Is trained to identify and install appropriately-sized Branch Circuit Disconnect(s) with
appropriately-sized Branch-Circuit Protective Rating and Short-Circuit Current Rating (SCCR), before connecting Panduit product to the branch circuit.
• Is trained and authorized to energize, de-energize, clear and ground power distribution
equipment.
• Is trained in the care and use of PPE (personal protective equipment) including, but not limited
to; arc-flash protective clothing, safety glasses, face shield, hard hat, gloves, and non-conductive tools (clamp stick, hot stick, etc.).
DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
The practices contained herein are designed as a guide for use by persons having technical skill at their own discretion and risk. Panduit does not guarantee any favorable results or assume any liability in connection with these instructions. Local, State, Federal, and Industry Codes and Regulations, as well as manufacturers requirements, must be consulted before proceeding with any project. Panduit Corp. makes no representations of nor assumes any responsibility for the accuracy or completeness set forth herein. Panduit disclaims any liability arising from any information contained herein or for the absence of same.
For Assistance:
Customer Service
800-777-3300
cs@panduit.com
General Technical Support
TechSupport@panduit.com
00157EAO Rev00
www.panduit.com Page 2 of 9
Page 3
1. Install tier
2. Remove wires from

Tier Installation

1. Install the tier on the rails using the cage nuts supplied with the tier, leaving two (2) rack units above the mounting bracket for cable management and the patch panel. Use the green cage nuts and green
screws on the top two positions to show a visibly verifiable ground.
on 19” rails using provided cage nuts and screws.
NOTE: Do not apply power prior to terminal block removal and switch installation.
2. Remove wires from terminal blocks.
3. Remove terminal blocks.
terminal blocks
3. Remove terminal blocks
Figure 2 - Front of Tier
00157EAO Rev00
www.panduit.com Page 3 of 9
Page 4
4. Install switches in the
5. Connect
recommended positions in dashed lines
Figure 3 - Front of Tier, Placement of Switches
ground wires to switches
4. Install switch.
5. Install supplied ground wire to each switch. See manufacturer’s instructions for how to ground the switch.
00157EAO Rev00
www.panduit.com Page 4 of 9
Page 5
6. Install
7. Install patch
Note: The blanking panel is optional and not required in a 12RU deployment. It is intended to be used in 26RU Universal Distribution Frame (or if space is available) to promote optimal thermal performance of the switches and prevent people from reaching the power supplies. If no space is available for the blanking panel, move the patch panel down 1RU to the tier.
panel in the 1RU above blanking panel.
blanking panel in the 1RU above the tier.
Figure 4 - Front of Tier, Installing Patch Panel and Blanking Panel (Optional)
6. Install blanking panel above the tier using included cage nuts and screws. Use the green cage nuts and green screws on the top two positions to show a visibly verifiable ground.
7. Install patch panel above blanking panel using included cage nuts and screws. Use the green cage nuts and green screws on the top two positions to show a visibly verifiable ground.
00157EAO Rev00
www.panduit.com Page 5 of 9
Page 6
8. Wire incoming
9. Wire incoming
power to the tier.
Figure 5 - Rear of Tier, Configuration shown includes Panduit 100W UPS (not included with all part numbers)
8. Wire power to tier – refer to supplied Field Wiring Diagram for proper wiring technique. Make sure circuit breakers are in the OFF position while wiring.
9. Wire switch– refer to switch manufacturer’s instructions for proper wiring technique. Make sure circuit breakers are in the OFF position while wiring.
00157EAO Rev00
power to the switch.
www.panduit.com Page 6 of 9
Page 7
11. Install fiber spool on
10. Install strain relief
9. Install strain relief bars as needed to support the weight of the cables running to the patch panel. Recommended positions are to use the deeper strain relief bar on the RU behind the patch panel to support the cables, and the more shallow bar to keep the cables from interfering with the power supplies on the back of the tier.
10. Install fiber spool against side of enclosure to manage fiber patch cord slack (if applicable).
bars.
side of enclosure.
Figure 6 - Installing Cable Strain Relief Bar and Fiber Spool
00157EAO Rev00
www.panduit.com Page 7 of 9
Page 8

Thermal Considerations

The Universal Distribution Frame tier can be installed on any 19” rails. Please use the below as a reference for the total thermal load that Panduit Intermediate Distribution Frames can support.

Installing in 12RU Panduit Intermediate Distribution Frame

Figure 7 - 12RU UDF enclosure guidelines for three recommended thermal solutions. The examples below demonstrate how to use this graph.
Example 1: An electronic load of 100 watts (sum of heat dissipation of the electronics inside the UDF). A peak ambient temperature of 35 °C (temperature outside the enclosure).
Answer 1: The intersection of the vertical 100 w line and the horizontal 35 °C line is in the blue area. Therefore, the UDF enclosure will adequately dissipate the heat and the peak internal temperature inside the UDF will not exceed 60 °C.
Example 2: An electronic load of 150 watts. A peak ambient temperature of 35 °C (temperature outside the enclosure).
Answer 2: The intersection of the vertical 150 w line and the horizontal 35 °C line is in the red area. Therefore, a fan and vent are required to keep the internal temperature of the UDF enclosure below 60 °C.
Example 3: An electronic load of 200 watts. A peak ambient temperature of 40 °C (temperature outside the enclosure).
Answer 3: The intersection of the vertical 200 w line and the horizontal 40 °C line is in the green area. Therefore, a T20 air conditioner is required to keep the internal temperature of the UDF enclosure below 60 °C.
00157EAO Rev00
www.panduit.com Page 8 of 9
Page 9

Installation in 26RU Panduit Intermediate Distribution Frame

Figure 8 - 26RU UDF enclosure guidelines for three recommended thermal solutions. The examples below demonstrate how to use this graph.
Example 1: An electronic load of 200 watts (sum of heat dissipation of the electronics inside the UDF). A peak ambient temperature of 35 °C (temperature outside the enclosure).
Answer 1: The intersection of the vertical 200 w line and the horizontal 35 °C line is in the blue area. Therefore, the UDF enclosure will adequately dissipate the heat and the peak internal temperature inside the UDF will not exceed 60 °C.
Example 2: An electronic load of 300 watts. A peak ambient temperature of 40 °C (temperature outside the enclosure).
Answer 2: The intersection of the vertical 300 w line and the horizontal 40 °C line is in the red area. Therefore, a fan and vent are required to keep the internal temperature of the UDF enclosure below 60 °C.
Example 3: An electronic load of 550 watts. A peak ambient temperature of 50 °C (temperature outside the enclosure).
Answer 3: The intersection of the vertical 550 w line and the horizontal 50 °C line is in the green area. Therefore, a N28 air conditioner is required to keep the internal temperature of the UDF enclosure below 60 °C.
Note: For more information about how to deploy a Universal Distribution Frame tier, please see the Universal Distribution Frame Thermal Management Application Guide.
00157EAO Rev00
www.panduit.com Page 9 of 9