The information and instructions contained in this document are not intended to be utilized as a substitute for proper training and
experience in the safe installation and operation of product. Prior to installation, it is the Buyer’s responsibility to consult with the
appropriate local Authority Having Jurisdiction (AHJ) for all applicable codes, permits, regulations and standards.
This product, including any equipment that may be installed inside, should only be installed and serviced by a licensed electrical
contractor, or competent technician, that meets the following qualifications;
•Is thoroughly familiar with this product and the instructions for installation and operation
•Is trained (accredited) in industry-accepted safe operating practices and procedures regarding identification and mitigation of
high- and low- voltage hazards and situations.
•Is trained to identify and install appropriately-sized Branch Circuit Disconnect(s) with appropriately-sized Branch-Circuit
Protective Rating and Short-Circuit Current Rating (SCCR), before connecting Panduit product to the branch circuit.
•Is trained and authorized to energize, de-energize, clear and ground power distribution equipment.
• Is trained in the care and use of PPE (personal protective equipment) including, but not limited to; arc-flash protective clothing,
safety glasses, face shield, hard hat, gloves, and non-conductive tools (clamp stick, hot stick, etc
WARNING
Be sure wall is capable of supporting cabinet and equipment.
DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
The practices contained herein are designed as a guide for use by persons having technical skill at their own discretion
and risk. Panduit does not guarantee any favorable results or assume any liability in connection with these instructions.
Local, State, Federal, and Industry Codes and Regulations, as well as manufacturers requirements, must be consulted
before proceeding with any project. Panduit Corp. makes no representations of nor assumes any responsibility for the
accuracy or completeness set forth herein. Panduit disclaims any liability arising from any information contained
herein or for the absence of same.
For Technical Support: http://www.panduit.com/wcs/Satellite?pagename=PG_Wrapper&friendlyurl=/en/support/contact-us
Note: The enclosure may be mounted to the wall without the mounting brackets
Step 1: Turn enclosure on its side with the locks orientated
towards the top. Using Latch Tool, turn both locks
towards each other to open door.
Step 2: Install Wall Mounting Brackets into back of the
enclosure aligning threaded studs on brackets to holes
located in back of the enclosure. Be sure obround mounting holes on the wall mounting bracket align outward.
Step 3: Secure wall mounting brackets using the supplied
sealing washers use (1) per threaded stud.
Torque spec:
Steel Enclosure: 5/16" washers = 30 in-lbs
Stainless Steel Enclosure: 3/8" washers = 40 in-lbs
Step 4: Close Door. Using Latch Tool, turn both locks to
secure the door.
If Mounting Flanges are not used:
For Steel Enclosure: Use 5/16" Sealing Washer (supplied)
and a 5/16" Bolt (not supplied) in the locations where the
threaded studs in the mounting flanges would go to mount
enclosure directly to wall.
For Stainless Steel Enclosure: Use 3/8" Sealing Washer
(supplied) and a 3/8" Bolt (not supplied) in the locations
where the threaded studs in the mounting flanges would
go to mount enclosure directly to wall.
Step 1
Latch Tool
V00028MW
Wall Mounting Brackets
Step 2
Sealing Washer
Hex Nut
Detail View
4 Places
(not provided)
Screw
Step 3
Washer
(provided)
Mounting Flanges not
used (4 places)
For Technical Support: http://www.panduit.com/wcs/Satellite?pagename=PG_Wrapper&friendlyurl=/en/support/contact-us
Enclosure may be mounted on any wall utilizing Unistrut or by
drilling directly into any concrete wall. There are two mounting
hole locations on the top flange and two locations at the bottom
flange.
Step 1:
Drill holes 19.25"-22" apart horizontally and 38" apart vertically.
Step 2:
Mount the enlosure with the locks to the right and secure.
If mounting flanges are not used:
The holes in the wall will be 22.5" apart horizontally and 34.5"
apart vertically.
Hole Locations for Wall Mounting
19.25” - 22.0”
22.5”
38”
34.5”
Dimensions for Wall Mounting
without Flanges
Removable Gland Plate
Remove the gland plate prior to drilling holes for conduit entry. Accommodations for incoming conduit have been supplied on the enclosure. This will help prevent metal shavings from entering the electronic components in the enclosure.
Recommend installation of IP66 rated conduit fittings that comply with the IEC codes that are applicable to the intended application.
The Gland Plate, located on bottom of the enclosure, is removable for machining to accept bulkhead connectors or compression fittings.
To remove gland plate,(12) screws and (12) flat washers attached to the threaded studs of the gland plate and remove plate from the enclosure.When reinstalling the gland plate, ensure the nuts are tightened until the gland plate flanges make contact with the enclosure surface.
Gland Plate
For Technical Support: http://www.panduit.com/wcs/Satellite?pagename=PG_Wrapper&friendlyurl=/en/support/contact-us
The enclosure comes with the door opening to the left.
The door may be reversed to open to the right.
Step 1: Remove pins from the door hinges.
Step 2: Remove screws and door hinges
Step 3: New Hole locations will have to be drilled or punched out. Reinstall hinges and screws on opposite side.
Step 4: Turn door 180 degrees and mount to the opposite side of the enclosure. Insert the same pins to secure the door.
V00028MW
Step 1
Add silicone to bolts
(6x)
(Not Supplied)
Step 2
Step 4
Step 3
Torque 33 in-lbs.
For Technical Support: http://www.panduit.com/wcs/Satellite?pagename=PG_Wrapper&friendlyurl=/en/support/contact-us
Remove plug in gland plate
and replace with conduit
fitting.
Recommend installation
of IP66 rated conduit fittings that comply with the
IEC codes that are applicable to the intended application.
Connect Infrastructural
ground to ground bar
Power Conduit Entry
Recommended Installation
Instructions for Uplink Entry
Uplink cable (fiber
shown) spooled in the
surface mount box
Uplink Cable
Conduit Entry
Recommended Installation
Instructions for Downlink Entry
Service loop formed
behind the patch panel
or on top of the cable
management L rings.
Downlink Cable
Conduit Entry
For Technical Support: http://www.panduit.com/wcs/Satellite?pagename=PG_Wrapper&friendlyurl=/en/support/contact-us
Patch cords supported
by the strain relief bar
and L-ring managers,
routed from the switch
to the patch panel
(Switch not included)
Secure with hook and
loop that is provided
INSTALLATION INSTRUCTIONS
Recommended Installation Instructions
for Patch Cord Routing
V00028MW
Route fiber cord from surface
mount box to switch. Route
fiber patch cord slack on the
fiber spool in between box and
switch.
For Instructions in Local Languages
and Technical Support:
For Technical Support: http://www.panduit.com/wcs/Satel-