Panduit WMPSE, WMPF1E Installation Manual

Page 1
PATCHLINK Cable Management Horizontal Panels
Part Numbers: WMP1E, WMPF1E,WMPFSE, WMPH2E, WMPHF2E, WMPSE
© Panduit Corp. 2015
WMP1E
WMPF1E
WMPFSE
WMPHF2E
WMPH2E
WMPSE
WMP1E (shown)
INSTALLATION INSTRUCTIONS
19” Rack
Cover
Screws
Install the managers to the rack with the #12-24x.5 screws provided. Built-in screw retention in mounting holes secures screws in manager during installation. Install the covers to the manager by positioning cover flat against the front of the manager fingers, then push to snap in place.
Note: The recommended assembly torque shall be 9+/-1 in-lb for #12-24 screws.
CM282D
Flange
The hinged cover opens from the top or the bot­tom. Pull flange to open and close cover.
The PatchLink cable manager is recommended for use with Panduit 24 or 48 port patch panels mounted above and below the manager.
When routing the cables for the patch panels, either of the following two methods are recommended to help maintain cable bend radius.
METHOD 1:For each row of 24 ports, place two cables in each slot on the manager.
Route half the cables through each of the ends of the manager.
METHOD 2: If the cables are coming from one side of the rack, place 2 cables in each of the slots on the manager.
NOTE: When using front and back WMPH’s to manage cables on the rear of the rack, place 2 cables in each of the 12 slots in the rear of the manager,
for each row of 24 ports.
METHOD 1
Finger
METHOD 2
For Instructions in Local Languages
and Technical Support:
Finger
www.panduit.com
Page 1 of 1
E-mail:
techsupport@panduit.com
Phone:
866-405-6654
Loading...