Note: The 4-Post Rack Mounting Brackets in the depicted
configurations are capable of supporting Wyr-Grid Pathways
at their safe working load unless otherwise noted.
Direct Mount Installation (R4P)
M10 Bolt
Torque both screws to a maximum of 7 Lb-ft
(9.5 N-m) with 8mm Hex key
INSTALLATION INSTRUCTIONS
WGR4PK30**
V00029FC
M10 Lockwasher
M10 Flat Washer
Step 1: Attach Strut to top of Rack
using thru holes with (1) M10 Bolt,
(1) M10 Flat Washer, (1) M10 Lockwasher & (1) M10 Nut (per side).
Note: Strut can also be installed
perpendicular to the Racks depth.
M10 Nut
Strut
FiberRunner/WyrGrid Quiklock Clip
Assemblies
(See page 5 & 6 for Pathway installation.)
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 1 of 6
Page 2
INSTALLATION INSTRUCTIONSV00029FC
Standard Elevated Installation (R4P)
Step 1: Assemble the Threaded Rod
using (1) M10 Hex Nuts, (1) M10 Lock
Washers, & (1) M10 Flat Washers as
shown.
Threaded Rod
assembly
Step 2: Install Threaded Rod assembly
in thru holes & secure with (1) M10 Nut.
Threaded Rod
M10 Hex Nut
M10 Flat Washer
M10 Lock Washer
M10 Nut
M10 Lockwasher
M10 Flat Washer
M10 Flat Washer
Step 3: Attach Strut to top of Threaded Rods
using (1) M10 Flat Washer, (1) M10 Lock
Washer, & (1) M10 Hex Nut (per side). Bracket
load rating is 300 lbs. maximum.
(Torque all M10 Nuts to a maximum of 7 lb-ft.
(9.5 N-m) typical)
(See page 5 & 6 for Pathway installation.)
M10 Nut
Strut
M10 Nut
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 2 of 6
Page 3
INSTALLATION INSTRUCTIONSV00029FC
Economy Rack Direct Installation (ER4P)
1/4-20 Hex Nut
Step 1: Assemble Mounting Clip to
Strut using (1) 1/4 - 20 Square Neck
Carriage Bolt, (1) Mounting Clip, (1) 1/4
Flat Washer, (1) 1/4 Lockwasher, & (1)
1/4 - 20 Hex Nut. Attach Strut to top of
Rack by sliding the Mounting Clip over
the lip of the Rack & tightening the (1)
1/4 - 20 Hex Nut (per side). Torque to a
minumum of 4 lb-ft (5.4 N-m) per bolt.
Mounting Clip
(See page 5 & 6 for Pathway installation.)
Economy Rack Elevated Installation (ER4P)
Step 1: See Direct Installation Step 1.
Step 2: Assemble Threaded Rod using (1)
M10 Hex Nut, (1) M10 Lockwasher, (1)
M10 Flat Washer, (1) Channel Washer, &
(1) M10 Channel Nut.
1/4 Lockwasher
1/4 Flat Washer
1/4-20 Square Neck
Carriage Bolt
Lip of Rack
Step 3: Attach Threaded Rod Assembly to
Strut by inserting the Channel Nut into the
Strut parallel with the Strut, turning 1/4 turn
& lifting so that the grooves on the Channel
Nut engage with the flanges on the Strut.
Tighten the M10 Hex Nut.
Install (1) M10 Hex Nut & (1) M10 Flat
Washer to the top of the Threaded Rod &
adjust to desired height of the Upper Strut.
Step 4: Attach Pathway Bracket (not provided) to the top of Threaded Rods using
(1) M10 Flat Washer, (1) M10 Lock
Washer, & (1) M10 Hex Nut (per side)
Bracket load rating is 300 lbs maximum.
(Torque all M10 Nuts to a maximum of 7
lb-ft (9.5 N-m) typical)
Pathway Bracket
(not provided)
(See page 5 & 6 for Pathway installation.)
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 6
Page 4
INSTALLATION INSTRUCTIONSV00029FC
Optional field Strut length modification
The Strut length may be customized to the actual application requirements by
cutting excess length off according to the corresponding Cut-Line Indicators
Optional R4P23 & R4P Front
Cut-Line Indicators
Optional R4P23 Rear
Cut-Line Indicators
Optional ER4P23 Rear
Cut-Line Indicators
Optional R4P Rear
Cut-Line Indicators
For Technical Support: www.panduit.com/resources/install_maintain.asp
Step 1: Loosen Clips & slide Clips outside
the pathway’s width.
Step 2: Install the Center Support in the
desired location by inserting the Support in
the strut perpendicular with the length of
the Strut & rotate 1/4 turn.
Wyr-Grid Pathway
Step 3: Position Wyr-Grid & place clips
over the pathway’s wires.
Step 4: Tighten both clips
to 4 Lb-ft (5.4 N-m)
Both
Sides
FR716DR
For Technical Support: www.panduit.com/resources/install_maintain.asp