Panduit T568A, T568B Installation Instructions Manual

1
Thread boot and collar onto the cable first.Remove 2.0" of the outer jacket from the cable end using
wire stripping tool (CJAST).
Remove matrix foil to expose twisted pairs.Fan twisted pairs into respective quadrants. The brown
pair should be opposite the orange pair.
When a cable spline (X-shaped filler) is present, cut spline
flush to fanned pairs using wire snipping tool (CWST).
Thread on boot and collar first!
(Cable ends 1 & 2)
90°
CWST
2
Note orientation of the divider depending on cable end 1
or cable end 2. The “V” channel should be aligned with the green pair.
Insert divider posts into the cable. If the cable has an
internal spline, insert divider posts into the brown and orange quadrants of the spline.
BLU
GRN
“V” channel
BRN
ORG
GRN
BLU
BRN
ORG
(Cable end 2)
(Cable end 1)
“V” channel
3
Arrange conductors to T568B wiring scheme while
minimizing untwist and smooth conductors.
Seat conductors into proper divider slots while holding
divider near the end of the cable jacket.
“V” channel
(Cable end 1)
(Cable end 2)
Category 6A UTP Modular Plug
for Panduit Patch Cable
T568B & T568A
Part Number: SP6X88P-*
© Panduit Corp. 2013
Contact slots
INSTALLATION INSTRUCTIONS
T568B Wiring Scheme
Strain Relief Collar
Divider
Load Bar
Plug Housing
Load Bar
Conductor holes and Contact slots
Pins
1
8
Conductor holes
Strain Relief Boot
PN575B
Pin #
T568B BRN
8
7
BRN/ WHT
6
GRN
BLU/ WHT
4
3
5
GRN/
BLU
WHT
2
ORG
ORG/ WHT
Specifications
• Cable jacket diameter 0.285 in. max.
• Maximum conductor insulation diameter 0.041 in.
Divider
Conductor slots and “V” channel
“V” channel
Divider post
1
* Denotes packaging quantity.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 1 of 4
© Panduit Corp. 2013
6
(Cable end 1)
7
Guide conductors into load bar holes while holding
conductors in the divider.
Slide load bar towards divider until flush.
Ensure the divider/load bar is centered and perpendicular
to the cable axis.
Trim conductors flush with load bar face.
Ver if y Load Bar orientation
5
Orient load bar with contact slots facing downward.
(Cable end 1)
(Cable end 2)
1
8
Pins
1
8
Pins
4
While holding conductors in respective divider slots,
straighten and align untwisted conductors using a circular motion.
Do not release grip of conductors until load bar is applied
in order to maintain conductor alignment.
Trim conductors on an angle approximately 1.00" from
divider leading edge.
1.00"
T568B BRN
8
WHT
7
BRN/
6
GRN
WHT
5
BLU/
4
BLU
WHT
3
GRN/
2
ORG
WHT
1
ORG/
Pin #
(Cable end 1)
10
MPT5-8AS
9
Grip and squeeze across collar arms as sub-assembly
is inserted into plug housing.
Push sub-assembly into housing until collar locking tabs
clear the plug housing pocket. Although not required, TX6 PLUS Plug Assembly Tool (CSPT) is available to facilitate this step.
Slide boot forward and fully seat onto strain relief collar.
Use tool MPT5-8AS to complete termination.
Assembly is complete. Visually check plug.
While holding load bar and divider stationary, slide collar
and boot forward until there is no gap between collar and divider. Do not exert pressure onto divider as collar can push load bar off conductors.
Confirm orientation of collar.
Align pin #1 of cable sub-assembly with pin #1 of plug
housing.
8
(Cable end 1)
(Cable end 2)
1
8
1
8
Pins
Pins
Collar locking tabs
INSTALLATION INSTRUCTIONS
PN575B
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 2 of 4
© Panduit Corp. 2013
1
Thread boot and collar onto the cable first.Remove 2.0" of the outer jacket from the cable end using
wire stripping tool (CJAST).
Remove matrix foil to expose twisted pairs.Fan twisted pairs into respective quadrants. The brown
pair should be opposite the green pair.
When a cable spline (X-shaped filler) is present, cut spline
flush to fanned pairs using wire snipping tool (CWST).
Thread on Boot and Collar first!
(Cable ends 1 & 2)
90°
CWST
2
Note orientation of the divider depending on cable end 1
or cable end 2. The “V” channel should be aligned with the orange pair.
Insert divider posts into the cable. If the cable has an
internal spline, insert divider posts into the brown and green quadrants of the spline.
BLU
ORG
“V” channel
BRN
GRN
ORG
BLU
BRN
GRN
(Cable end 2)
(Cable end 1)
“V” channel
3
Arrange conductors to T568A wiring scheme while
minimizing untwist and smooth conductors.
Seat conductors into proper divider slots while holding
divider near the end of the cable jacket.
“V” channel
(Cable end 1)
(Cable end 2)
INSTALLATION INSTRUCTIONS
T568A Wiring Scheme
PN575B
Divider
Load Bar
Plug Housing
Load Bar Divider
Conductor holes and Contact slots
Pins
1
Contact slots
Strain Relief Collar
8
Conductor holes
Strain Relief Boot
Pin #
T568A BRN
8
7
BRN/ WHT
6
ORG
BLU/ WHT
4
3
5
ORG/
BLU
WHT
2
GRN
GRN/ WHT
Specifications
• Cable jacket diameter 0.285 in. max.
• Maximum conductor insulation diameter 0.041 in.
Conductor slots and “V” channel
“V” channel
Divider post
1
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 4
© Panduit Corp. 2013
4
While holding conductors in respective divider slots,
straighten and align untwisted conductors using a circular motion.
Do not release grip of conductors until load bar is applied
in order to maintain conductor alignment.
Trim conductors on an angle approximately 1.00" from
divider leading edge.
1.00"
T568A BRN
8
WHT
7
BRN/
6
ORG
WHT
5
BLU/
4
BLU
WHT
3
ORG/
2
GRN
WHT
1
GRN/
Pin #
(Cable end 1)
5
Orient load bar with contact slots facing downward.
(Cable end 1)
(Cable end 2)
1
8
Pins
Ver if y Load Bar orientation
1
8
Pins
6
(Cable end 1)
7
Guide conductors into load bar holes while holding
conductors in the divider.
Slide load bar towards divider until flush.
Ensure the divider/load bar is centered and perpendicular
to the cable axis.
Trim conductors flush with load bar face.
10
MPT5-8AS
9
Grip and squeeze across collar arms as sub-assembly
is inserted into plug housing.
Push sub-assembly into housing until collar locking tabs
clear the plug housing pocket. Although not required, TX6 PLUS Plug Assembly Tool (CSPT) is available to facilitate this step.
Slide boot forward and fully seat onto strain relief collar.Use tool MPT5-8AS to complete termination. Assembly is complete. Visually check plug.
While holding load bar and divider stationary, slide collar
and boot forward until there is no gap between collar and divider. Do not exert pressure onto divider as collar can push load bar off conductors.
Confirm orientation of collar.
Align pin #1 of cable sub-assembly with pin #1 of plug
housing.
8
(Cable end 2)
1
8
1
8
Pins
Pins
(Cable end 1)
Collar locking tabs
INSTALLATION INSTRUCTIONS
PN575B
For Instructions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
Page 4 of 4
E-mail:
techsupport@panduit.com
Phone:
866-405-6654
Loading...