The information contained in this manual is intended as a guide for use by persons having technical
skill at their own discretion and risk. The recommended practices are based on average conditions.
Panduit makes no representation or warranty, express or implied, nor assumes any responsibility for
the accuracy or completeness of these installation instructions. Panduit does not guarantee any
favorable results nor assume any liability for damages, improper installation, system failures, or any
other problems that could arise in connection with the use of these installation instructions.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Cable Management Fingers
Single Hinge Door
Single Hinge Door
Rear Split Doors
Side Panel Side Panels
Vertical Blanking Panels (
Cabinet to Cabinet Seal
Rear Floor Seal Installation
Top of Cabinet Cable Manager Installation
Top of Cabinet Cable Manager Installation
INSTALLATION INSTRUCTIONS
(front of cabinet).................................................................................. 8
(rear of cabinet) .................................................................................. 9
This cabinet can easily be tipped. Use extreme caution when unpacking or moving the cabinet.
Use
at least [2] persons to remove cabinet from pallet and move cabinet into position (refer to
page 5).
When rolling the cabinet on its casters, gaps in the floor, including elevator thresholds, should be
covered with a rigid plate capable of bearing the cabinet’s load.
When rolling the cabinet on casters, push the cabinet from the front or rear only, to prevent
the cabinet from tipping on its side.
V00029KU
FAILURE TO FOLLOW THESE INSTRUCTIONS CAN LEAD TO SERIOUS INJURY, DEATH, OR
DAMAGE TO YOUR EQUIPMENT.
Safety Notes:
The maximum static weight load of the cabinet is 3000 lbs. [1361 kg]. The maximum weight load when
the cabinet is rolling on casters is 2500 lbs. [1134 kg]. The weight load should be evenly distributed
across the height of the cabinet, with the heaviest components mounted at the bottom of the cabinet.
The maximum weight load on the integral cabinet top cable routing system is 200 lbs. [91 kg].
The maximum weight load on the following shelves: RSHLF, RSHLF23, RSHLF36 is 275 lbs. [125 kg].
The maximum operating temperature is 50º C; so that the installer is able to determine acceptability of
use of accessories and components in the operating state.
The equipment shall be installed or serviced by trained service personnel in accordance with the applicable requirements of the National Electric Code, ANSI/NFPA 70 or Canadian Electrical Code and the
applicable sections of ANSI C2, the National Electrical Safety Code. The instruction shall not result in
the risk of fire, electric shock, or injury to persons.
UL Listing covers enclosure cabinet only
For Technical Support: www.panduit.com/resources/install_maintain.asp
Inspect cabinet for damage before accepting cabinet.
Before handling cabinet:
Small glide strips are installed at various locations around the cabinet to protect the cabinet’s finish during shipping. These
strips are to be removed prior to handling of cabinet.
“Shipping Hold Down Bracket” Doubles as Floor Mounting Bracket. Retain bracket if floor mounting is desired.
(see Page 6)
•Remove all stretchwrap and protective cardboard from outside of cabinet
•Remove all Shipping Brackets (if necessary)
•Remove [4] Hold Down Brackets at front and rear of cabinet
•Use [2] people to carefully lift and remove cabinet from pallet
IMPORTANT:
Leveling Legs must be fully retracted before the cabinet is moved into place. Sliding cabinet on leveling legs may
result in damage to the leveling legs. (Leveling Legs ship in retracted position)
[2] M14 Hex Nuts
(use 22mm socket wrench)
[4] Shipping
Hold Down
Brackets
Front Door
Shipping Brackets
[2] M14 Flat Washer
[8] M10 Hex Head Screws
(use 15mm socket wrench)
[4] M10 Bolt
(use 15mm socket wrench)
Pallet
Note: Doors, Side panels, and other components are removed for clarity.
For Technical Support: www.panduit.com/resources/install_maintain.asp
•Secure Ganging Brackets to cabinets at [2] front locations shown below
•Do not use Ganging Brackets to cinch cabinets together
IMPORTANT:
Ensure cabinets are level by following the guidelines on page 5. Leveling the cabinet prior to ganging is important
to ensure proper door operation.
[2] Front Ganging
Brackets
[4] M6 Torx Screws
(use T25 Torx bit)
V00029KU
FRONT OF CABINETS
For Technical Support: www.panduit.com/resources/install_maintain.asp
•Secure Ganging Brackets to cabinets at [2] rear locations shown below
•Do not use Ganging Brackets to cinch cabinets together
IMPORTANT:
Ensure cabinets are level by following the guidelines on page 5. Leveling the cabinet prior to ganging is important to ensure
proper door operation.
[2] Rear Ganging
Brackets
[4] M6 Torx Screws
(use T25 Torx bit)
REAR OF CABINETS
For Technical Support: www.panduit.com/resources/install_maintain.asp
Top of Cabinet Cable Manager Installation (Optional)
•Disassemble front fascia assemblies (packaged in cabinet) by removing (2) M5x0.8 button head screws (use T25 Torx bit).
•Remove (2) M5x0.8 button head screws (use T25 Torx bit) from front and rear of Cable Manager base.
•Install vertical walls on front and back of Cable Manager base using (5) M5x0.8 button head Torx screws (use T25 Torx bit).
Re-install screws from previous step to secure to the frame.
•Attach front fascia to the front vertical wall by sliding fascia over studs in vertical wall.(see detail view). Tighten with (4) M5x0.8
button head screws (use T25 Torx bit).
•Attach rear fascia to the rear vertical wall by sliding fascia over studs in vertical wall (see detail view). Tighten with (4) M5x0.8
button head screws (use T25 Torx bit).
- Remove [4] M5 Torx Screws
(use T25
[2] Vertical Walls
V00029KU
[2] Vertical Walls
Front Fascia
Rear Fascia
[4] M5 Torx Screws
(use T25 Torx bit)
[5] M5 Torx Screws
(use T25 Torx bit)
Studs
For Technical Support: www.panduit.com/resources/install_maintain.asp
Top of Cabinet Cable Manager Installation (for vertical exhaust ducts)
IMPORTANT - INSTALL VERTICAL EXHAUST DUCT PRIOR TO INSTALLING REAR VERTICAL WALL
•Disassemble front fascia assemblies (packaged in cabinet) by removing (2) M5x0.8 button head screws (use T25 Torx bit).
•Remove (2) M5x0.8 button head screws (use T25 Torx bit) from front of Cable Manager base.
•Install vertical wall on front of Cable Manager base using (5) M5x0.8 button head Torx screws (use T25 Torx bit). Re-install screws
from previous step to secure to the frame.
•Attach front fascia to the front vertical wall by sliding fascia over studs in vertical wall (see detail view). Tighten with (4) M5x0.8
button head screws
•Attach rear vertical wall to the Cable Manger with (4) M5x0.8 button head screws (use T25 Torx bit) from underneath Top of
Cabinet Cable Manager.
Front Vertical Wall
- Remove [2] M5 Torx Screws
(use T25 Torx bit)
Rear Vertical Wall
[5] M5 Torx Screws
(use T25 Torx bit)
Front Vertical Wall
[4] M5 Torx Screws
(use T25 Torx bit)
Studs
IMPORTANT
VERTICAL EXHAUST DUCT
MUST BE INSTALLED
PRIOR TO INSTALLATION
OF REAR VERTICAL WALL
For Instructions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
Page 23 of 23
[4] M5 Torx Screws
(use T25 Torx bit)
E-mail:
techsupport@panduit.com
Phone:
866-405-6654
Rev. 01
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.