Note: If the installer does not wish to
fully remove the door while finishing
the Vertical Cable Manager installation then he/she may opt to open the
side of the door closest to the rack.
Door opening is illustrated on page 7
of this document.
Door Removal
INSTALLATION INSTRUCTIONS
V00029MX
For Technical Support: www.panduit.com/resources/install_maintain.asp
Regardless of the height of the part, and regardless of whether the rack is 2-Post or 4-Post, the Vertical Cable Manager will
mount to the rack in 3 places using (3) M12 Serrated Flange Bolts and (3) M12 Serrated Flange Nuts.
The racks have pairs of mounting holes where the Vertical
Cable Manager can be mounted, but the Vertical Cable
Manager is designed to use only one mounting hole per
pair.
If mounting with the larger capacity side facing forward,
the bottom will use the front rack hole, the middle will use
the rear rack hole, and the top will use the front rack hole.
If mounting with the smaller capacity side facing forward,
the bottom will use the rear rack hole, the middle will use
the front rack hole, and the top will use the rear rack hole.
Install Vertical Cable Manager to Rack using (3) M12
Serrated Flange Bolts and (3) M12 Serrated Flange Nuts.
For Technical Support: www.panduit.com/resources/install_maintain.asp
To remove door, follow instructions given on page 3.
To open door to the right, turn left knob counterclockwise until engaged.
To open door to the left, turn right knob clockwise until engaged.
V00029MX
For Technical Support: www.panduit.com/resources/install_maintain.asp
Using a flathead screwdriver, gently
pry up plastic latches in (4) places
indicated while at the same time applying
forward pressure to the finger section.
Latch
location
Latch
location
Latch
location
Latch
location
Fingers removed for clarity
Step 2:
Push out the finger section
toward the inside of the manager.
Fingers removed for clarity
To Replace Fingers:
Align finger mounting pegs
with mounting slots on manager.
Place the finger mounting pegsunder the steel flange on the
manager, aligning them with the
mounting slots,then push the
finger section toward outside of
the manager until an audible
“click” is heard.
Note: Because the part is long,
the installer may have to push the
finger section out in several spotsbefore it issecured.
INSTALLATION INSTRUCTIONS
V00029MX
For Technical Support: www.panduit.com/resources/install_maintain.asp
(2) M6 x 16mm serrated hex
head bolts and (2) M6 serrated
hex head nuts
(1) M10 x 16mm serrated hex
head bolt and (1) M10 serrated
hex head nut
7 foot rack
(2) M6 x 16mm serrated hex
head bolts and (2) M6 serrated
hex head nuts
(1) M10 x 16mm serrated hex
head bolt and (1) M10 serrated
hex head nut
8 foot rack
Installing Top Panel:
INSTALLATION INSTRUCTIONS
V00029MX
Step 1: Use integrated hooks at top of panel to attach over the top of the manager, aligning mounting
as shown.
Step 2: Fasten using (2) M6 x 16mm serrated hex head bolts and (2) M6 serrated hex head nuts.
Step 3: Fasten (1) additional M10 x 16mm serrated hex head bolt and (1) M10 serrated hex head nut.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Waterfall Installation for PATCHRUNNERTM 2 Vertical Managers and Open Racks
Part numbers:
R2PPR2VWF, R2PPR2VWFWH,
R4PPR2VWF, R4PPR2VWFWH
Hole near top of flange indicates front of rack.
Installation of R2PPR2VWF:
For R2P:
1) Align waterfall slots around the backbone
part of the manager as shown.
2) Place waterfall mounting bracket under
rack between the top angles so that flanges
will stop the bracket. Align holes in bracket
with holes in waterfall.
3) Fasten components together using (4)
#12-24 x 1/2” screws.
For R2P6S:
1) Align waterfall slots around the backbone part of the manager as show.
2) Place waterfall mounting bracket
under rack between the top angles so
that the flanges will stop the bracket.
Align holes in bracket with holes in
waterfall.
3) Fasten components together using
(4) #12-24 x 1/2” screws.
V00029MX
Installation of R4PPR2VWF:
For R4P:
1) Align waterfall slots around the backbone part of the manager as shown.
2) Fasten components together using
(4) 1/4-20 Carriage Bolts and (4) Serrated Flange Hex Nuts in locations
shown.
For Technical Support: www.panduit.com/resources/install_maintain.asp