Panduit R4PAK-OSHPD, R4PWF Installation Manual

PATCHRUNNERTM 2 Vertical Managers and Racks
© Panduit Corp. 2018
INSTALLATION INSTRUCTIONS
V00029MX
Table of Contents
Description Page
Part Numbers and Part Contents.....................................................................................................2
Door Removal..................................................................................................................................3
Installation of Vertical Managers to Racks.......................................................................................4
End of Row Bracket Condition (7ft Vertical Managers Only)............................................................5
Door Installation................................................................................................................................6
Finger Removal and Replacement...................................................................................................8
End Panel Installation.......................................................................................................................9
Waterfall Installation.......................................................................................................................11
Other Compatible Accessories.......................................................................................................12
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 1 of 13
© Panduit Corp. 2018
INSTALLATION INSTRUCTIONS
V00029MX
PATC HRUNNERTM 2 Vertical Cable Managers may be installed with either side facing forward.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 2 of 13
© Panduit Corp. 2018
Door(s)
Vertical Cable Manager
To remove door(s), turn both knobs outward.
Note: If the installer does not wish to fully remove the door while finishing the Vertical Cable Manager installa­tion then he/she may opt to open the side of the door closest to the rack. Door opening is illustrated on page 7 of this document.
Door Removal
INSTALLATION INSTRUCTIONS
V00029MX
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 13
© Panduit Corp. 2018
Vertical Cable Manager
Rack
Rack
Vertical Cable Manager
Installation view with larger capacity side of Vertical Cable Manager facing forward
Installation view with smaller capacity side of Vertical Cable Manager facing forward
Top Position (Use front rack hole)
Middle Position (Use rear rack hole)
Bottom Position (Use front rack hole)
Top Position (Use rear rack hole)
Middle Position (Use front rack hole)
Bottom Position (Use rear rack hole)
Detail Views for Larger Capacity Side Facing Forward
Detail Views for Smaller Capacity Side Facing Forward
M12 Serrated Flange Bolt & M12 Serrated Flange Nut
M12 Serrated Flange Bolt & M12 Serrated Flange Nut
M12 Serrated Flange Bolt & M12 Serrated Flange Nut
INSTALLATION INSTRUCTIONS
V00029MX
Installation of Vertical Cable Managers to Racks
Regardless of the height of the part, and regardless of whether the rack is 2-Post or 4-Post, the Vertical Cable Manager will mount to the rack in 3 places using (3) M12 Serrated Flange Bolts and (3) M12 Serrated Flange Nuts.
The racks have pairs of mounting holes where the Vertical Cable Manager can be mounted, but the Vertical Cable Manager is designed to use only one mounting hole per pair.
If mounting with the larger capacity side facing forward, the bottom will use the front rack hole, the middle will use the rear rack hole, and the top will use the front rack hole.
If mounting with the smaller capacity side facing forward, the bottom will use the rear rack hole, the middle will use the front rack hole, and the top will use the rear rack hole.
Install Vertical Cable Manager to Rack using (3) M12 Serrated Flange Bolts and (3) M12 Serrated Flange Nuts.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 4 of 13
© Panduit Corp. 2018
End of Row Bracket
Inside face of Vertical Cable Manager
Inside face of rack post
M6 x 30mm Socket Head Cap Screws
INSTALLATION INSTRUCTIONS
End of row bracket condition (7ft Vertical Cable Managers Only)
V00029MX
Place end row bracket around inside face of rack post and inside face of Vertical Cable Manager as shown
Tighten down End of Row Bracket using (2) M6 x 30mm Socket Head Cap Screws.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 5 of 13
© Panduit Corp. 2018
Slots
Pegs
Door Knobs in locked position
Slots (1) not shown
Pegs
Door Installation
INSTALLATION INSTRUCTIONS
V00029MX
Align Door Pegs on 4 sides to slots on door supports and simply push closed. The door knobs will be in locked position as shown.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 6 of 13
© Panduit Corp. 2018
Left knob shown in engaged position
Door open to right
Right knob shown in engaged position
Door open to left
INSTALLATION INSTRUCTIONS
To remove door, follow instructions given on page 3. To open door to the right, turn left knob counterclockwise until engaged. To open door to the left, turn right knob clockwise until engaged.
V00029MX
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 7 of 13
© Panduit Corp. 2018
Finger Removal and Replacement
To Remove Fingers: Step 1:
Using a flathead screwdriver, gently pry up plastic latches in (4) places indicated while at the same time applying forward pressure to the finger section.
Latch location
Latch location
Latch location
Latch location
Fingers removed for clarity
Step 2:
Push out the finger section toward the inside of the manager.
Fingers removed for clarity
To Replace Fingers:
Align finger mounting pegs with mounting slots on manager.
Place the finger mounting pegs under the steel flange on the manager, aligning them with the mounting slots,then push the finger section toward outside of the manager until an audible “click” is heard. Note: Because the part is long, the installer may have to push the finger section out in several spots before it is secured.
INSTALLATION INSTRUCTIONS
V00029MX
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 8 of 13
© Panduit Corp. 2018
8 foot rack
M10 X 16 Serrated Hex Head Bolt & M10 Serrated Hex Head Nut
M10 X 16 Serrated Hex Head Bolt & M10 Serrated Hex Head Nut
7 foot rack
M10 X 16 Serrated Hex Head Bolt & M10 Serrated Hex Head Nut
M10 X 16 Serrated Hex Head Bolt & M10 Serrated Hex Head Nut
8 foot rack
integrated hook
square on manager
bottom panel
diamond indicates bottom of panel
diamond indicates bottom of panel
integrated hook
bottom panel
7 foot rack
square on manager
INSTALLATION INSTRUCTIONS
End Panel Installation to PATCHRUNNERTM 2 Vertical Managers
Part Number(s): PR2VEP, PR2VEPWH, PR2VEP96
Installing Bottom Panel:
V00029MX
Step 1: Use integrated hook at top of bottom panel to attach to square located on manager as shown.
Step 2: Fasten using (2) M10 x 16 serrated hex head bolts and (2) M10 serrated hex head nuts.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 9 of 13
© Panduit Corp. 2018
align mounting holes
top of cable manager
integrated hooks
7 foot rack
align mounting holes
top panel
8 foot rack
top of cable manager
integrated hooks
align mounting holes
align mounting holes
top panel
(2) M6 x 16mm serrated hex head bolts and (2) M6 serrated hex head nuts
(1) M10 x 16mm serrated hex head bolt and (1) M10 serrated hex head nut
7 foot rack
(2) M6 x 16mm serrated hex head bolts and (2) M6 serrated hex head nuts
(1) M10 x 16mm serrated hex head bolt and (1) M10 serrated hex head nut
8 foot rack
Installing Top Panel:
INSTALLATION INSTRUCTIONS
V00029MX
Step 1: Use integrated hooks at top of panel to attach over the top of the manager, aligning mounting as shown.
Step 2: Fasten using (2) M6 x 16mm serrated hex head bolts and (2) M6 serrated hex head nuts. Step 3: Fasten (1) additional M10 x 16mm serrated hex head bolt and (1) M10 serrated hex head nut.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 10 of 13
© Panduit Corp. 2018
Waterfall mounting bracket
Waterfall slots
(4) #12-24 x 1/2 Screws
Backbone
Waterfall mounting bracket
Waterfall slots
(4) #12-24 x 1/2 Screws
Backbone
Waterfall slots
(4) 1/4-20 Carriage Bolts & (4) Serrated Flange Hex Nuts
Backbone
INSTALLATION INSTRUCTIONS
Waterfall Installation for PATCHRUNNERTM 2 Vertical Managers and Open Racks
Part numbers: R2PPR2VWF, R2PPR2VWFWH, R4PPR2VWF, R4PPR2VWFWH
Hole near top of flange indicates front of rack.
Installation of R2PPR2VWF: For R2P:
1) Align waterfall slots around the backbone part of the manager as shown.
2) Place waterfall mounting bracket under rack between the top angles so that flanges will stop the bracket. Align holes in bracket with holes in waterfall.
3) Fasten components together using (4) #12-24 x 1/2 screws.
For R2P6S:
1) Align waterfall slots around the back­bone part of the manager as show.
2) Place waterfall mounting bracket under rack between the top angles so that the flanges will stop the bracket. Align holes in bracket with holes in waterfall.
3) Fasten components together using (4) #12-24 x 1/2 screws.
V00029MX
Installation of R4PPR2VWF: For R4P:
1) Align waterfall slots around the back­bone part of the manager as shown.
2) Fasten components together using (4) 1/4-20 Carriage Bolts and (4) Ser­rated Flange Hex Nuts in locations shown.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 11 of 13
© Panduit Corp. 2018
Wire retainer clips
WR5E-X-Wire Retainer clips
To install Wire Retainer clips, place open end of clip around the leg of a finger on the verti­cal cable manager.
Spool Removal/Replacement Step 4: Pull back on angled flange
while applying upward pressure.
Step 5: Repeat steps 1-3.
Step 2: Push buttons through back- bone until mounting face is flush with backbone.
Installation of Hole Blanking Plugs (PR2VBPK)
Press disks over pass through holes and press into place.
Angled flange
Step 3: Apply downward pressure until plastic spool clicks into place.
Mounting face
Mounting Leg Slots
Fingers removed for clarity
Step 1: Align buttons with mounting leg slot
Installation of Spools (PRSP5 or PRSP7)
INSTALLATION INSTRUCTIONS
Other Compatible Accessories (sold separately)
V00029MX
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 12 of 13
© Panduit Corp. 2018
Top Panel
Bottom Panel
Waterfall
Waterfall
Vertical Cable Manager
Vertical Cable Manager
Doors
Vertical Cable Manager and Accessories on a 2-Post Rack
Vertical Cable Manager and Accessories on a 4-Post Rack
RackRack
INSTALLATION INSTRUCTIONS
V000029MX
For Instructions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
Page 13 of 13
E-mail:
techsupport@panduit.com
Phone:
866-405-6654
Loading...