Note: If the installer does not wish to
fully remove the door while finishing
the Vertical Cable Manager installation then he/she may opt to open the
side of the door closest to the rack.
Door opening is illustrated on page 7
of this document.
Door Removal
INSTALLATION INSTRUCTIONS
V00029MX_REV01
For Technical Support: www.panduit.com/resources/install_maintain.asp
Regardless of the height of the part, and regardless of whether the rack is 2-Post or 4-Post, the Vertical Cable Manager will
mount to the rack in 4 places using (4) M10 Serrated Flange Bolts and (4) M10 Serrated Flange Nuts.
The racks have pairs of mounting holes where the Vertical
Cable Manager can be mounted, but the Vertical Cable
Manager is designed to use only one mounting hole per
pair.
If mounting with the larger capacity side facing forward,
the bottom will use the front rack hole, the middle will use
the rear rack hole, and the top will use the front rack hole.
If mounting with the smaller capacity side facing forward,
the bottom will use the rear rack hole, the middle will use
the front rack hole, and the top will use the rear rack hole.
Install Vertical Cable Manager to Rack using (4) M10
Serrated Flange Bolts and (4) M10 Serrated Flange Nuts.
For Technical Support: www.panduit.com/resources/install_maintain.asp
To remove door, follow instructions given on page 3.
To open door to the right, turn left knob counterclockwise until engaged.
To open door to the left, turn right knob clockwise until engaged.
V00029MX_REV01
For Technical Support: www.panduit.com/resources/install_maintain.asp
Using a flathead screwdriver, gently
pry up plastic latches in (4) places
indicated while at the same time applying
forward pressure to the finger section.
Latch
location
Latch
location
Latch
location
Latch
location
Fingers removed for clarity
Step 2:
Push out the finger section
toward the inside of the manager.
Fingers removed for clarity
To Replace Fingers:
Align finger mounting tabs
with mounting slots on manager.
Place the finger mounting tabs
under the steel flange on the
manager, aligning them with the
mounting slots,then push the
finger section toward outside of
the manager until an audible
“click” is heard.
Note: Because the part is long,
the installer may have to push the
finger section out in several spots
before it is secured.
INSTALLATION INSTRUCTIONS
V00029MX_REV01
For Technical Support: www.panduit.com/resources/install_maintain.asp
(2) M6 x 16mm serrated hex
head bolts and (2) M6 serrated
hex head nuts
(1) M10 x 16mm serrated hex
head bolt and (1) M10 serrated
hex head nut
7 foot rack
(2) M6 x 16mm serrated hex
head bolts and (2) M6 serrated
hex head nuts
(1) M10 x 16mm serrated hex
head bolt and (1) M10 serrated
hex head nut
8 foot rack
Installing Top Panel:
INSTALLATION INSTRUCTIONS
V00029MX_REV01
Step 1: Use integrated hooks at top of panel to attach over the top of the manager, aligning mounting
as shown.
Step 2: Fasten using (2) M6 x 16mm serrated hex head bolts and (2) M6 serrated hex head nuts.
Step 3: Fasten (1) additional M10 x 16mm serrated hex head bolt and (1) M10 serrated hex head nut.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Waterfall Installation for PATCHRUNNERTM 2 Vertical Managers and Open Racks
Part number:
PR2VWF, PR2VWFWH
Width adjustment of PR2VWF.
1) Adjust the width of the waterfall to fit your
rack by loosening the (4) Phillips head
screws (do not remove) and align them
with the corresponding markers for your
specific rack.
2) Tighten the (4) Phillips head screws.
INSIDE
MARKERS
OUTSIDE MARKERS
V00029MX_REV01
Waterfall slots
Waterfall slots
(4) M6 x 8mm
Screws
Waterfall mounting bracket
(4) M6 x 8mm
Screws
Waterfall mounting bracket
Backbone
Backbone
For R2P: INSIDE MARKERS
1) Align waterfall slots around the backbone
part of the manager as shown.
2) Place waterfall mounting bracket under
rack between the top angles so that flanges
will stop the bracket. Align holes in bracket
with holes in waterfall.
3) Fasten components together using (4)
M6 x 8mm screws.
For R2P6S: INSIDE MARKERS
1) Align waterfall slots around the backbone
part of the manager as shown.
2) Place waterfall mounting bracket under
rack between the top angles so that the
flanges will stop the bracket. Align holes in
bracket with holes in waterfall.
3) Fasten components together using (4)
M6 x 8mm screws.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Waterfall Installation for PATCHRUNNERTM 2 Vertical Managers and Open Racks (Cont.)
Waterfall slots(4) M6 x 8mm
Screws
Backbone
Waterfall mounting bracket
Waterfall slots
(2) M6 x 12mm
Screws
Backbone
For ER4P: INSIDE MARKERS
1) Align waterfall slots around the backbone
part of the manager as shown.
2) Place waterfall mounting bracket under
rack between the top angles so that flanges
will stop the bracket. Align holes in bracket
with holes in waterfall.
3) Fasten components together using (4)
M6 x 8mm screws.
For R4P: OUTSIDE MARKERS
1) Align waterfall slots around the backbone
part of the manager as shown.
2) Align holes in waterfall with holes in rack.
3) Fasten components together using (2)
M6 x 12mm screws & (2) M6 serrated nuts.
(2) M6 serrated
nuts
For Technical Support: www.panduit.com/resources/install_maintain.asp