
© Panduit Corp. 2010
Steel Cable Management Rack-6” Deep
Part Number:R2P6S, R2P6S96
INSTRUCTIONS CM436B
Mounting Configuration
3/8” Nut 3-8X1” Bolt
3/8” Paint Piercing Washer
RACK ASSEMBLY
Apply Antioxidant Paste to painted surfaces that the 3/8 paint piercing washers will come in contact with. Install
top angles to upright channels using (2) 3/8x1” bolts (2) 3/8” nuts and (4) 3/8” paint piercing washer (see figure
below) per angle. Finger tighten only.
Apply Antioxidant Paste to painted surfaces that the 3/8 paint piercing washers will come in contact with.Install
the base angles to the vertical upright channels using (4) 3/8x1” bolts (4) 3/8” nuts and (8) 3-16 paint piercing
washers (see figure below) per angle. Finger tighten only.
Stand rack upright. Square the upright channels with the base using a carpenter square. Completely tighten
all bolts to at least 14 ft.-lbs(19.0 N-m).
Top Angle
Antioxidant Paste
3/8X1” Bolt
MOUNT RACK TO FLOOR
Securely mount the rack to the floor using the appropriate hardware based on the floor construction (concrete, raised floor, or wood). Rack may be mounted to the floor in any one of
three distances from the face of the channel.
Locations where rack may
be mounted to the floor
For Instructions in Local Languages
www.panduit.com/resources/install_maintain.asp
and Technical Support:
3/8 Paint Piercing Washer
3/8 Nut
Rack Channel
Note: The maximum weight load of the rack is 1,500 pounds. The weight should be
evenly distributed across the height of the rack, with the heaviest components mounted
at the bottom of the rack. The top angles are not intended to support a significant load.
E-mail:
cs@panduit.com
Fax:
www.panduit.com
(708) 444-6993
Page 1 of 1