Panduit PZICGK Installation Manual

Page 1
© Panduit Corp. 2008
PANZONE In-Ceiling Grounding Kit
Part Numbers: PZICGK
INSTRUCTIONS CM378
(2) Bonding Studs
(3) #12-24 Hex Washer
Head
(4) Bonding Nuts
#10-32 Thread
Forming
Grounding Bracket w/ESD Port
Door Jumper
#10
(2) Equipment Jumpers
#10-32 Hex
#12 External
Tooth
Installation: Bonding Studs
1.1. Install bonding studs through the inside of the enclosure door until nuts contact the door surface. See Figu re 1.1.
1.2. Install bonding nuts to studs on the outside of the door to hold in place. See Figure 1.2.
Figure 1.1
Bonding Studs
w/Nuts
Figure 1.2
Bonding
Nuts
Enclosure
Attach Building Ground to Bonding Studs
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 1 of 2
Page 2
INSTRUCTIONS CM378
Installation: Bracket
2.1. Align following components over located hole as shown in enclosure door: (1) #12 External Tooth Lockwasher, (1) Grounding Bracket, and (1) #10 Split Lock Washer. Fasten with (1) #10-32 Thread Forming Screw. See
Figure 2.1.
Figure 2.1
#10-32 Thread Forming
Screw
#10 Split Lock Washer
Grounding Bracket
#12 External Tooth
Enclosure Door
Installation: Door and Equipment Jumpers
3.1. Install 90-degree lug of door jumper to grounding bracket and secure with (1) #12-24 screw. See Figure 3.1.
3.2. Install flat end of door jumper to one of the bonding studs and secure with (1) #10-32 nut. See Figure 3.2.
3.3 Install 1-hole lugs of (2) equipment jumpers to grounding bracket and secure with (2) #12-24 screws. See Figure 3.3.
3.4 Install 2-hole lugs of equipment jumpers to (2) switches and fasten with provided screws. See Figure 3.4.
Figure 3.1
Figure 3.3
Figure 3.2
Figure 3.4
For instuctions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
Page 2 of 2
E-mail:
cs@panduit.com
Fax:
(708)444-6448
Loading...