
© Panduit Corp. 2015
DUAL HINGE D
Dual Sided Single Sided
DOORS
PRV15 PRVF15 PRD15
PRV12 PRVF12 PRD12
PRV10 PRVF10
PRD10
PRV8 PRVF8
PRD8
PRV6 PRVF6
PRD6
All Pa tchR unner M ana ge rs a nd Dual Hi nged Doors are available in 96" tall versions
6 i nch a nd 1 2 i nch wid e P atchRunne r Ma nag er s and D ual H ing ed Doors a re als o a vai lable in
(PRV**96, PRVF**96, and PRD**96) **= 6,8,10,12,or 15 inch wide
VER TIC AL C ABLE MANAGEMENT
79" tall versions (PRV679, PRVF679, PRD679, PRV1279, PRVF1279, PRD1279)
Recommended bolt placement for mounting
manager to rack channel.
Middle Location
Bolt
(For Front Only Manager
& Front & Rear Manager)
Top Location
Bolt
(For Front Only & Front & Rear
Manager)
Bottom Location
Bolt and Spacer
(For Front Only Manager)
Bolt
(For Front & Rear Manager)
PART NUMBERS
PATCH RUNNER Vertical Cable Manager
INSTALLATION INSTRUCTIONS V00028BV_01
(1) PATCH RUNNER Vertical Cable Manager
(6) 1/2-13 Hex Nuts
(6) 1/2-13x2.0” Bolts
(12) Washers for 1/2-13 bolts
(4) Spools
(2) .91 long 1/2-13 Bolt Spacers
* Spools sold separately for PRV6 & PRVF6
CONTENTS
LOCATION GUIDE - STANDARD EIA RACK
Center Mounting of a PATC H RUNNER on Standard EIA Rack
After the first rack is mounted to the floor with the
appropriate hardware, Use Three 1/2-13x2.0” bolts
(supplied with the vertical cable manager panels) to
fasten the P
to the rack. Next, mount the second rack to the
other side of the P
Manager using the remaining 1/2-13x2.0” bolts. Then
mount the second rack to the floor using the appropriate
hardware.
ATC HRUNNER Vertical Cable Manager
ATC HRUNNER Vertical Cable
Spacer
6” Vertical Manager dimension shown in brackets [...]
8” Vertical Manager dimensions shown in parenthesis (...)
10” Vertical Manager dimensions shown in asterisk *...*
15 “Vertical Manager dimensions shown in brackets {...}
Signifies Bottom
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Note:
Tighten bolts to 120 lbs.-in.
Page 1 of 4

INSTALLATION INSTRUCTIONS V00028BV_01
INSTALLATION OF SPOOLS (PRSP5 or PRSP7)
Step 1
Align buttons with mounting leg slot
Mounting Leg
Slots
Mounting Face
Angled Flange
Step 2
Push buttons through backbone until
mounting face is flush with backbone.
Note:
PRSP5 & PRSP7 spools will hold up to 14lbs.
DUAL HINGED DOOR BRACKET INSTALLATION
Attach door brackets with #10-32 screws to cross brace as shown in
picture below. Two sets of threaded holes are present. Use the set in
the back to align with the holes in the door bracket.
Step 3
Apply downward pressure until plastic
spool clicks into place.
Removal/Replacement
Step 4
Pull back on angled flange while applying upward pressure
Step 5
Repeat steps 1-3
FINGER REMOVAL (Optional)
Cut finger using PANDUIT Duct Cutting Tool (p/n: DCT)
in the location shown
CUTTING TOOL
(P/N: DCT)
Door Support
Door Bracket
(4) Screws
(2) on Top
View of Bottom
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
(2) on Bottom
Page 2 of 4

INSTALLATION INSTRUCTIONS V00028BV_01
DUAL HINGED DOOR INSTALLATION (PRDXX)
Align lower pins with lower hinge pin mounting holes. Squeeze release knobs together, then align upper door pins with upper hinge pin
mounting holes. Release pressure on the release knobs to set door in place.
NOTE: PatchRunner Enhanced Door (PED) can be installed on PRV managers. See PatchRunner Enhanced Door (PED) Installation Instructions for mounting.
Upper Hinge Pin Mounting Hole
Upper Door Pin
Release Knobs
Door
Lower Door Pin
Note: For cleaning P
ANDUIT recommends using ‘SIMPLE GREEN’ all-purpose cleaner (or local equivalent) and a lint free cloth
Patch Panels Through
P
ATC HRUNNER Vertical Cable Manager
Route cables through fingers of
P
ATC HRUNNER Vertical Manager maintain-
ing cable bend radii. Use a slot on the
P
ATC HRUNNER Vertical Cable Manager
that is the same height as the patch panel.
Proper routing for angled patch panel and
flat patch panel shown below.
ROUTING CABLE
Angled Patch Panel Detail
Lower
Hinge Pin
Mounting Hole
Flat Patch Panel Detail
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 3 of 4

INSTALLATION INSTRUCTIONS V00028BV_01
EXAMPLES OF ROUTING PATCH CORD SLACK
Route distribution cable
from ceiling to rear
of PRV manager
Rack to rack pathways
(NCMHAEF2 or NMF2)
Same rack
crossover
pathway
Rack to rack pathways
(Note: Avoid Using as
pathways to route from
rack to rack)
15 RU SWITCH
Route distribution cable
from floor to rear
of PRV manager
For instuctions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
Page 4 of 4
E-mail:
techsupport@panduit.com
Phone:
(866) 405-6654