6” Vertical Manager dimension shown in brackets [...]
8” Vertical Manager dimensions shown in parenthesis (...)
10” Vertical Manager dimensions shown in asterisk *...*
Note: Single-sided managers have
equivalent dimensions to the 60%
capacity side of a Dual-sided manager.
6.00
10.7” FULLY EXTENDED
15.5” STD. MOUNTING
10.75
TYP
4.75
7.8” STD. MOUNTING
TYP
12.6” FULLY EXTENDED
16.00” = 19” RACK
20.00” = 23” RACK
TYP
*Reversible
Total capacity of dual sided manager is split 60% and 40%.
LOCATION GUIDE: 4-post Racks
*Reversible
Total capacity of dual sided manager is split 60% and 40%.
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
[10.25]
(12.25)
*14.25*
16.25
6” Rack
For horizontal dimensions:
6” Vertical Manager dimension shown in brackets [...]
8” Vertical Manager dimensions shown in parenthesis (...)
10” Vertical Manager dimensions shown in asterisk *...*
For vertical dimensions:
23” Deep 4-Post Rack dimension shown in brackets [...]
36” Deep 4-Post Rack dimensions shown in parenthesis (...)
42” Deep 4-Post Rack dimensions shown in asterisk *...*
Page 1 of 5
Page 2
INSTALLATION INSTRUCTIONS V00029KP_01
Door Bracket Base Installation
Install Door Bracket Base into cutout features on
side panels using (2) #12-24 X 1/2" Screws.
Top of part
Door Bracket Base
Bottom of part
#12-24 X 1/2"
Screws
Note: When properly installed,
Door Bracket Base will protrude
through cutouts on inside of
panel.
Door Bracket
If material from Door Bracket Base
cannot be touched or seen protruding
through cutouts on inside of panel,
then the Door Bracket is not properly
engaged.
Material visible
Brackets Engaged
Material not visible
Brackets not engaged
Mounting of a PATC HRUNNER High Capacity Vertical Manager
Panduit recommends that the PATC HRUNNER High Capacity Vertical Manager be mounted such that the front face of the manager’s panels are
1.25” forward of the front face of the rack it is attached to. However, other holes on the side panel of the manager and the channels of the rack
are available so that the manager may be moved forward to accommodate applications which require a larger bend radius requirement.
Standard
Rack
Panduit recommended
mounting locations
Other available
holes for mounting
6” Deep Steel
Rack
4-Post Rack
Panduit recommended
mounting locations
Other available
holes for mounting
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 2 of 5
Page 3
INSTALLATION INSTRUCTIONS V00029KP_01
Center Mounting of a PATC HRUNNER 7Ft. Tall High Capacity Vertical Manager on Standard 7 Ft. Tall
CEA Rack or 6”- 7Ft. Tall Steel Rack
After the first rack is mounted to the floor with the appropriate hardware, Use Three1/2-13x1.0” bolts (supplied with the vertical
cable manager panels) to fasten the P
rack to the other side of the P
ATC HRUNNER High Capacity Vertical Cable Manager using the remaining 1/2-13x1.0” bolts. Then
mount the second rack to the floor using the appropriate hardware.
ATC HRUNNER High Capacity Vertical Cable Manager to the rack. Next, mount the second
Mounting Locations
(Near top, Near center,
Near bottom)
Mounting Locations
(Near top, Near center,
Near bottom)
Nut
Bottom Mounting Location
Washers
Detail View
(Standard CEA Rack)
Bolt
Nut
Washers
Bottom Mounting Location
Detail View
(6” Steel Rack)
Bolt
Mounting of a PATC H RUNNER High Capacity Vertical Manager on a 7 Ft. Tall 4-Post Rack
After the first rack is mounted to the floor with the appropriate hardware, Use Three1/2-13x1.0” bolts (supplied with the vertical
cable manager panels) to fasten the P
rack to the other side of the P
ATC HRUNNER High Capacity Vertical Cable Manager using the remaining 1/2-13x1.0” bolts. Then
mount the second rack to the floor using the appropriate hardware.
Note: Design is only intended to have PED*B1 doors to mount in front of the manager.
ATC HRUNNER High Capacity Vertical Cable Manager to the rack. Next, mount the second
Mounting Locations
(Near top, Near center, Near bottom)
Nut
Washers
Bottom Mounting Location
Detail View
Bolt
Note:
Tighten bolts to 120 in-lbs.
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 3 of 5
Page 4
INSTALLATION INSTRUCTIONS V00029KP_01
Center Mounting of a PATC HRUNNER 8 Ft. Tall High Capacity Vertical Manager on Standard 8 Ft.
Tall CEA Rack or 6"- 8 Ft. Tall Steel Rack
After the first 8 ft. tall rack is mounted to the floor with the appropriate hardware, Use Three1/2-13x1.0” bolts (supplied with the
vertical cable manager panels) to fasten the P
mount the second 8 ft. tall rack to the other side of the P
remaining 1/2-13x1.0” bolts. Then mount the second 8 ft. tall rack to the floor using the appropriate hardware.
Mounting Locations
(Near top, Near center,
Near bottom)
ATC HRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager to the rack. Next,
ATC HRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager using the
Mounting Locations
(Near top, Near center,
Near bottom)
Nut
Washers
Bottom Mounting Location
Detail View
(Standard 8 Ft. Tall CEA Rack)
Bolt
Nut
Washers
Bottom Mounting Location
Detail View
(6"- 8Ft Tall Steel Rack)
Bolt
Mounting of a PATC H RUNNER High Capacity Vertical Manager on a 8 Ft. Tall 4-Post Rack
After the first 8 ft. tall rack is mounted to the floor with the appropriate hardware, Use Three1/2-13x1.0” bolts (supplied with the
vertical cable manager panels) to fasten the P
mount the second 8 ft. tall rack to the other side of the P
remaining 1/2-13x1.0” bolts. Then mount the second 8 ft. tall rack to the floor using the appropriate hardware.
ATC HRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager to the rack. Next,
ATC HRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager using the
Mounting Locations
(Near top, Near center, Near bottom)
Nut
Washers
Bottom Mounting Location
Detail View
Bolt
Note:
Tighten bolts to 120 in-lbs.
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 4 of 5
Page 5
INSTALLATION INSTRUCTIONS V00029KP_01
Finger Installation
Finger flags
Snap
locations
Outward
pressure
Step 1:
Starting with bottom fingers,
align tabs on base of finger
with keyholes on side panel
of manager. The cable
retainers on the finger will be
pointed upward,
Step 2:
Apply outward pressure (from
inside of manager) until plastic
finger clicks into place.
Step 3:
Repeat Steps 1 and 2 on
remaining fingers.
Removal/Replacement:
Use a flat-head screwdriver to
release snaps at locations
shown and apply inward pressure until finger is removed.
FINGER REMOVAL
Apply inward pressure at finger ends to remove finger.
Score Groove
Note: For cleaning PANDUIT recommends using ‘SIMPLE GREEN’
all purpose cleaner (or local equivalent) and a lint free cloth
Equipment Mounting Instructions
1. Mount appropriate cage nuts to cage nut holes provided
in center mounting brackets. Mounting to the cage nut
holes on the bottom of a center mounting bracket to the
holes on the top of the center mounting bracket directly
below will meet the correct mounting requirement for CEA
equipment.
2. Secure equipment using appropriate screws
Screws
Cage
Nuts
Screws
Cage
Nuts
Detail View
Center Mouning Bracket
For instuctions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
Multi-Layer Strain
Relief Bar
www.panduit.com
Page 5 of 5
Quick Net Patch Panel
E-mail:
cs@panduit.com
Fax:
(708)444-6448
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.