Panduit PEVF8, PED8B1, PED6B1, PED10B1 Installation Manual

Page 1
Dual
Single
PEV12 PEV1296
PED12B1
PED1296B1 PEV10 PEV1096
(Sold Separately)
PED10B1
PED1096B1 PEV8 PEV896
PEVF8 PEVF896
PED8B1
PED896B1 PEV6
PEV696
PEVF6 PEVF696
PED6B1
PED696B1
[24.8]
31.8 (37.8) *43.8*
1.07 TYP
16.00” TYP
23.2” to Inside Panel of Manager
[6.0] (8.0)
*10.0*
12.0
[25.9]
32.9 (38.9) *44.9*
7.8” STD. MOUNTING
12.6” FULLY EXTENDED
1.75 TYP
15.5” STD. MOUNTING
10.7” FULLY EXTENDED
40% of
Capacity*
60% of
Capacity*
PATC HRUNNER High Capacity Vertical Cable Manager
© Panduit Corp. 2017
INSTALLATION INSTRUCTIONS V00029KP_01
PART NU MBERS
LOCATION GUIDE: Standard and 6-inch Racks
3” Standard CEA Rack
10.7” FULLY EXTENDED
15.5” STD. MOUNTING
7.8” STD. MOUNTING
12.6” FULLY EXTENDED
1.25 TYP
7.75 TYP
4.75 TYP
3.00
20.31” = 19” RACK
24.31” = 23” RACK TYP
[6.0] (8.0) *10.0*
12.0
40% of
Capacity*
60% of
Capacity*
CONTENTS
(1) PATCH RUNNER High Capacity Vertical Cable Manager (6) 1/2-13 Hex Nuts (6) 1/2-13x1.0” Bolts (12) Washers for 1/2-13 bolts
6” Vertical Manager dimension shown in brackets [...] 8” Vertical Manager dimensions shown in parenthesis (...) 10” Vertical Manager dimensions shown in asterisk *...*
Note: Single-sided managers have equivalent dimensions to the 60% capacity side of a Dual-sided manager.
6.00
10.7” FULLY EXTENDED
15.5” STD. MOUNTING
10.75 TYP
4.75
7.8” STD. MOUNTING
TYP
12.6” FULLY EXTENDED
16.00” = 19” RACK
20.00” = 23” RACK TYP
*Reversible Total capacity of dual sided manager is split 60% and 40%.
LOCATION GUIDE: 4-post Racks
*Reversible Total capacity of dual sided manager is split 60% and 40%.
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
[10.25] (12.25) *14.25*
16.25
6” Rack
For horizontal dimensions:
6” Vertical Manager dimension shown in brackets [...] 8” Vertical Manager dimensions shown in parenthesis (...) 10” Vertical Manager dimensions shown in asterisk *...*
For vertical dimensions:
23” Deep 4-Post Rack dimension shown in brackets [...] 36” Deep 4-Post Rack dimensions shown in parenthesis (...) 42” Deep 4-Post Rack dimensions shown in asterisk *...*
Page 1 of 5
Page 2
INSTALLATION INSTRUCTIONS V00029KP_01
Door Bracket Base Installation
Install Door Bracket Base into cutout features on side panels using (2) #12-24 X 1/2" Screws.
Top of part
Door Bracket Base
Bottom of part
#12-24 X 1/2"
Screws
Note: When properly installed, Door Bracket Base will protrude through cutouts on inside of panel.
Door Bracket
If material from Door Bracket Base cannot be touched or seen protruding through cutouts on inside of panel, then the Door Bracket is not properly engaged.
Material visible
Brackets Engaged
Material not visible
Brackets not engaged
Mounting of a PATC HRUNNER High Capacity Vertical Manager
Panduit recommends that the PATC HRUNNER High Capacity Vertical Manager be mounted such that the front face of the manager’s panels are
1.25” forward of the front face of the rack it is attached to. However, other holes on the side panel of the manager and the channels of the rack are available so that the manager may be moved forward to accommodate applications which require a larger bend radius requirement.
Standard Rack
Panduit recommended
mounting locations
Other available holes for mounting
6” Deep Steel Rack
4-Post Rack
Panduit recommended
mounting locations
Other available holes for mounting
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 2 of 5
Page 3
INSTALLATION INSTRUCTIONS V00029KP_01
Center Mounting of a PATC HRUNNER 7Ft. Tall High Capacity Vertical Manager on Standard 7 Ft. Tall CEA Rack or 6”- 7Ft. Tall Steel Rack
After the first rack is mounted to the floor with the appropriate hardware, Use Three 1/2-13x1.0” bolts (supplied with the vertical cable manager panels) to fasten the P rack to the other side of the P
ATC HRUNNER High Capacity Vertical Cable Manager using the remaining 1/2-13x1.0” bolts. Then
mount the second rack to the floor using the appropriate hardware.
ATC HRUNNER High Capacity Vertical Cable Manager to the rack. Next, mount the second
Mounting Locations
(Near top, Near center,
Near bottom)
Mounting Locations
(Near top, Near center,
Near bottom)
Nut
Bottom Mounting Location
Washers
Detail View
(Standard CEA Rack)
Bolt
Nut
Washers
Bottom Mounting Location
Detail View
(6” Steel Rack)
Bolt
Mounting of a PATC H RUNNER High Capacity Vertical Manager on a 7 Ft. Tall 4-Post Rack
After the first rack is mounted to the floor with the appropriate hardware, Use Three 1/2-13x1.0” bolts (supplied with the vertical cable manager panels) to fasten the P rack to the other side of the P
ATC HRUNNER High Capacity Vertical Cable Manager using the remaining 1/2-13x1.0” bolts. Then
mount the second rack to the floor using the appropriate hardware. Note: Design is only intended to have PED*B1 doors to mount in front of the manager.
ATC HRUNNER High Capacity Vertical Cable Manager to the rack. Next, mount the second
Mounting Locations
(Near top, Near center, Near bottom)
Nut
Washers
Bottom Mounting Location
Detail View
Bolt
Note:
Tighten bolts to 120 in-lbs.
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 3 of 5
Page 4
INSTALLATION INSTRUCTIONS V00029KP_01
Center Mounting of a PATC HRUNNER 8 Ft. Tall High Capacity Vertical Manager on Standard 8 Ft. Tall CEA Rack or 6"- 8 Ft. Tall Steel Rack
After the first 8 ft. tall rack is mounted to the floor with the appropriate hardware, Use Three 1/2-13x1.0” bolts (supplied with the vertical cable manager panels) to fasten the P mount the second 8 ft. tall rack to the other side of the P remaining 1/2-13x1.0” bolts. Then mount the second 8 ft. tall rack to the floor using the appropriate hardware.
Mounting Locations
(Near top, Near center,
Near bottom)
ATC HRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager to the rack. Next,
ATC HRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager using the
Mounting Locations
(Near top, Near center,
Near bottom)
Nut
Washers
Bottom Mounting Location
Detail View
(Standard 8 Ft. Tall CEA Rack)
Bolt
Nut
Washers
Bottom Mounting Location
Detail View
(6"- 8Ft Tall Steel Rack)
Bolt
Mounting of a PATC H RUNNER High Capacity Vertical Manager on a 8 Ft. Tall 4-Post Rack
After the first 8 ft. tall rack is mounted to the floor with the appropriate hardware, Use Three 1/2-13x1.0” bolts (supplied with the vertical cable manager panels) to fasten the P mount the second 8 ft. tall rack to the other side of the P remaining 1/2-13x1.0” bolts. Then mount the second 8 ft. tall rack to the floor using the appropriate hardware.
ATC HRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager to the rack. Next,
ATC HRUNNER High Capacity 8 Ft. Tall Vertical Cable Manager using the
Mounting Locations
(Near top, Near center, Near bottom)
Nut
Washers
Bottom Mounting Location
Detail View
Bolt
Note:
Tighten bolts to 120 in-lbs.
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 4 of 5
Page 5
INSTALLATION INSTRUCTIONS V00029KP_01
Finger Installation
Finger flags
Snap locations
Outward pressure
Step 1:
Starting with bottom fingers, align tabs on base of finger with keyholes on side panel of manager. The cable retainers on the finger will be pointed upward,
Step 2:
Apply outward pressure (from inside of manager) until plastic finger clicks into place.
Step 3:
Repeat Steps 1 and 2 on remaining fingers.
Removal/Replacement:
Use a flat-head screwdriver to release snaps at locations shown and apply inward pres­sure until finger is removed.
FINGER REMOVAL
Apply inward pressure at finger ends to remove finger.
Score Groove
Note: For cleaning PANDUIT recommends using ‘SIMPLE GREEN
all purpose cleaner (or local equivalent) and a lint free cloth
Equipment Mounting Instructions
1. Mount appropriate cage nuts to cage nut holes provided in center mounting brackets. Mounting to the cage nut holes on the bottom of a center mounting bracket to the holes on the top of the center mounting bracket directly below will meet the correct mounting requirement for CEA equipment.
2. Secure equipment using appropriate screws
Screws
Cage Nuts
Screws
Cage Nuts
Detail View
Center Mouning Bracket
For instuctions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
Multi-Layer Strain
Relief Bar
www.panduit.com
Page 5 of 5
Quick Net Patch Panel
E-mail:
cs@panduit.com
Fax:
(708)444-6448
Loading...