
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 1 of 13
INSTALLATION INSTRUCTIONS
PATCHRUNNERTM 2 Enhanced Vertical Managers
Table of Contents
Description Page
Part Configurations and Contents ...................................................................................................2
Door Support Installation …………..................................................................................................3
Orientation of Vertical Manager to Rack .......................................................................................4
Installation of Vertical Manager to Rack .......................................................................................5
End of Row Bracket Condition (Optional) ……………………...........................................................6
Finger Installation..............................................................................................................................7
Door Installation ...…………………...................................................................................................8
EIA 19” Equipment Vertical Mounting ……………………………………………………….……………9
End Panel Installation......................................................................................................................11
Other Compatible Accessories........................................................................................................12
Add "WH" as a suffix to the part numbers listed above
to identify a white part, such as PE2VD06WH
Tools required:
3mm Allen Wrench (Door Support installation)
17mm Wrench (Rack installation)
18mm Wrench (Rack installation)
5mm Allen Wrench (Optional End of Row Bracket
installation)

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 2 of 13
INSTALLATION INSTRUCTIONS
Front / Rear Assembly Contents
(1) PATCHRUNNER
TM
2 Enhanced Vertical Cable
Manager
(2) Door Support assemblies – Qty 2
(3) PATCHRUNNER
TM
2 door – Qty 2
(4) Molded cable management left finger kits
7ft – Qty 6 8ft – Qty 8
(5) Molded cable management right finger kits
7ft – Qty 6 8ft – Qty 8
(6) Hardware Kit (not shown)
Includes:
M12 Serrated Flange Bolts and Hex Nuts – Qty 6
End of Row Bracket with (2) M6 Socket Head Cap
Screws
M5 Flat Head hex drive screws – Qty 12
Front Only Assembly Contents
(1) PATCHRUNNER
TM
2 Enhanced Vertical Cable
Manager
(2) Door Support assemblies – Qty 2
(3) PATCHRUNNER
TM
2 door – Qty 1
(4) Molded cable management left finger kits
7ft – Qty 3 8ft – Qty 4
(5) Molded cable management right finger kits
7ft – Qty 3 8ft – Qty 4
(6) Hardware Kit (not shown)
Includes:
M12 Serrated Flange Bolts and Hex Nuts – Qty 6
M5 Flat Head hex drive screws – Qty 12

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 13
INSTALLATION INSTRUCTIONS
Door Support Installation
Cable manager
frame assembly
Door Support assembly (2 per
cable manager)
M5 flat head screws, use a 3mm hex
allen wrench to secure in place at the
top and bottom of the manager
frame.
Bottom of the assembly is
indicated by the diamond
shaped cutouts on the cable
manager side panels.
NOTE:
The Door Support assembly slides vertically into place in the cable
manager. Orientate so that the 40/60 open areas match as shown
on the next page and align mount holes. The bottom of the
vertical cable manager assembly is identified by the diamond
shaped cutouts at the lower edge of the side panels.

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 4 of 13
INSTALLATION INSTRUCTIONS
LARGER SIDE
FACING FORWARD
SMALLER SIDE
FACING FORWARD
Determine Cable Manager Mount Orientation to the Rack
PATCHRUNNER
TM
2 Enhanced Vertical Cable Managers may be installed with either side facing forward.

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 5 of 13
INSTALLATION INSTRUCTIONS
Installation of Vertical Cable Managers to Racks
The Vertical Cable Manager will mount to the rack in 3 locations using (3) M12 Serrated Flange Bolts and (3) M12 Serrated
Flange Nuts on 2 Post and 4 Post racks regardless of size.
The racks have pairs of mounting holes where the vertical cable manager can be mounted, but the
vertical cable manager is designed to use only one mounting hole per pair. Align the mount holes as
shown. The mount holes used on the rack will be the forward holes on the top and bottom mount
locations and the rear rack hole in the center mount location regardless of which side of the vertical
cable manager is facing forward.
Installed view with 40% capacity side of
the vertical cable manager facing forward
Installed view with 60% capacity side
of the vertical cable manager facing
-BottomForward
mount hole

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 6 of 13
INSTALLATION INSTRUCTIONS
End of row bracket condition (Optional)
Place end of row bracket around inside face of the rack vertical post and inside face of Vertical Cable
Manager as shown.
Tighten the end of row bracket using (2) M6 x 30mm Socket Head Cap screws.
M6 x 30mm Socket Head Cap
screws
Inside face of rack
vertical post
Inside face of
vertical cable
manager

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 7 of 13
INSTALLATION INSTRUCTIONS
Finger Installation to PATCHRUNNERTM 2 Enhanced Vertical Managers
Finger Removal and Replacement
Step 1:
Using a flat head screwdriver, gently pry up plastic latches in (4) places indicated
while at the same time applying forward pressure to the finger section.
Step 2:
Push out the finger section toward the inside of the manager.
Align finger mount tabs with
mounting slots on the
manager side panels.
Finger sections installed
pointed up with the rounded
side facing inward.
Push toward the outside of
the manager until you her an
audible “click”.
7 ft Managers:
3 Fingers per side
8 ft Managers:
4 Fingers per side
With the shorter section
Installed at the top position

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 8 of 13
INSTALLATION INSTRUCTIONS
Door knobs in locked
position
Align Door hinge pins on 4 sides to slots on door supports and simply push closed. The door knobs will
be in locked position as shown.

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 9 of 13
INSTALLATION INSTRUCTIONS
EIA 19” Equipment Vertical Mounting Instructions
Detail View
Cable Manager Horizontal Panel
1. Mount the appropriate cage nuts to the square cutouts provided in the cable manager horizontal
panels to allow mounting of EIA 19” equipment.
2. Secure equipment using appropriate screws.
Optional Slack Spool
mount keyhole slots
Tak-Ty Hook &
Loop cable tie slots

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 10 of 13
INSTALLATION INSTRUCTIONS
To open the door to the right, turn the left knob counterclockwise until engaged.
To open door to the left, turn the right knob clockwise until engaged.

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 11 of 13
INSTALLATION INSTRUCTIONS
End Panel Installation to PATCHRUNNERTM 2 Enhanced Vertical Managers
Part Numbers: PE2VEP, PE2VEPWH, PE2VEP96, PE2VEP96WH
Installing Bottom Panel:
Bottom panel with
integral hooks
M10 x 16 Serrated hex
head bolt and nut (4x)
Diamond cutout indicates
bottom of panel
Use integrated hooks on the
bottom panel to clip in place
in the square cutouts on the
cable manager side panels
M10 x 16
Serrated hex
head bolt and nut
(2x)
Use integrated hooks on the top
panel to hang in place in the
front to back door support
brackets and align mount holes
M6 x 16 Serrated
hex head bolt
and nut (2x)

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 12 of 13
INSTALLATION INSTRUCTIONS
Other Compatible Accessories (sold separately)
PRSP5 and PRSP7 Slack Spools
Angled flange for
removal
Step 1: Align spool mount buttons with keyhole slots in
the cable manager horizontal panel, with the angled
flange facing upwards.
Step 2: Push spool mount buttons though the keyholes
and apply downward pressure until the spool clicks into
place.
Step 3: To remove the spool, pull back on the mount
flange while applying pressure upward.
Note: Spools will hold up to 14 lbs.
WR5E-X Cable Retainer Clip
To install cable retainer clips, place the open
end of the clip around the leg of the molded
finger on the vertical cable manager and
position as required.

For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 13 of 13
INSTALLATION INSTRUCTIONS
SRB19BLY, SRB19MDBL, SRB19D5BL, SRB19D7BL Strain Relief Bars
Strain relief bars can be mounted vertically in the
cable manager patching area using #12-24 screws
and cage nuts.
Multi-Layer Strain Relief Bars can be used to create
vertical channels within the manager and additional
cable support and management.
Other Compatible Accessories (sold separately)
#12-24 screws
and cage nuts
supplied with the
Strain Relief Bar
BR1B, BR2B Brush Seal Blank Panel 19” Panels
1RU or 2RU Brush Seal Blank Panels can be
mounted vertically in the cable manager patching
area using screws and cage nuts.
Brush Seal Blank Panels allow front to back cable
management while maintaining a thermal seal pass
through.