Panduit Panzone PZWMC12P, Panzone PZWMC12W Instruction Manual

Page 1
3.2"
16.0"
Mounting
Holes
23.8"
4.5"
16.0"
45.1"
Footprint with Cabinet Open
25.0"
Cabinet Width
PANZONE Wall Mount Cabinet
Part Numbers: PZWMC12P, PZWMC12W
© Panduit Corp. 2017
Cabinet with Perforated Door
PZWMC12P
INSTRUCTIONS CM315B
Parts Included: (1) - Extra Door Spacer (8) - Keys (1) - Roll of Tak-Ty (3) - Packages of 4 - #12-24 Screws (1) - Removable top vent cover panel
PZWMC12W
Cabinet with Windowed Door
Location Footprint
Cabinet depth is 25.0” in closed position
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
Page 1 of 7
Page 2
INSTRUCTIONS CM315B
PANZONE Wall Mount Cabinets can be installed in a hinged right or hinged left application. For your installation, determine which side of the cabinet will hinge. The cabinet is shown hinged left. Mounting surface must have sufficient strength to support the cabinet with payload. The mounting surface must also be flat and extend beyond the overall cabinet footprint.
To open cabinet, push latch release button to dis-engage latch.
2” or 2 1/2” Conduit Knockout
Front Door with Lock
Plastic Spacer
Step 2:
To reverse rear hinge direction.
Open cabinet, and remove the latch from the rear lock. Remove the rear lock and the lock hole grommet on the opposite side. Close the cabinet and remove decorative covers on hinges. Remove the thread forming screws & lockwashers from the hinges (M5), and latches (M4), and re-install the components on the opposite sides of the cabinet. Open the cabinet and re-install the lock and grommet on the opposite sides. Re-assemble the lock latch, ensuring it locks in the downward rotation (see below).
1/2” or 3/4” Conduit Knockout
Step 1:
Remove door and side panels for ease of handling. Ensure rear latches are closed. Install (4) 3/8” mounting hardware (not provided) as shown in Location Footprint. Hardware should protrude 3/8” from wall. Mount the cabinet to the wall by hooking the keyholes over the protruding 3/8” mounting hardware. Once the cabinet is in place, carefully swing cabinet from wall and tighten the hardware securely. Re-install door and side panels. Door swing direction can be changed by rotating the door 180°. Ensure the plastic spacer is placed at
the bottom of the door hinge.
Step 3:To adjust the depth of the mount-
ing rail for specific applications, remove the M6 thread forming screws and lock­washers, move the rail to the desired position and re-install mounting hard­ware.
M5 Thread forming screws & lock­washers
Hinge
Lock Hole Grommet
Lock
Lock in downward
rotation
M4 Thread forming
screwsLatch
Mounting Rails are adjustable in
0.9” increments.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Mounting Rail
Mounting Hardware
Page 2 of 7
Page 3
INSTRUCTIONS CM315B
Cable Routing
Cable must be routed with an adequate slack loop to prevent cable damage. Route cable to point 1 secure to tie down with a TAK-TY. Next route cable across the bottom of the enclosure to point 2 secure to tie down with a TAK-TY. Route to the desired patch panel after securing the cables with a T
AK-TY at point 3 or 4.
Point 4
Cables Extend to Patch Panel
Point 2
Point 3
Point 1
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 7
Page 4
Optional Accessories
INSTRUCTIONS CM315B
PZWMC12P
Cabinet with Perforated Door
PZWMC12W (Shown)
Cabinet with Window Door
PZCHSM2
ANZONE Horizontal
P
Slack Manager
For Technical Support: www.panduit.com/resources/install_maintain.asp
PZBR4
ANZONE 4” Bend
P
Radius Post Kit
PZBR3
ANZONE 3” Bend
P
Radius Post Kit
PZBR3.5
P
ANZONE 3.5” Bend
Radius Post Kit
Page 4 of 7
PZWMC12RR
ANZONE Rear Equipment
P
Rail Kit
PZCFK
P
ANZONE Fan Kit
PZCFR
ANZONE Fan Media
P
replacement Kit
Page 5
INSTRUCTIONS CM315B
PANZONE Fan Kit (PZCFK)
Fan kits are installed using (4)#10-32 screws and lockwashers provided with kit as shown below. If only one fan kit is used, install the provided blank on the opposite wall using (4) #10-32 screws and lockwashers provided.
Scenario 1: Switches not exceeding 120 watts of total heat output use fan kit as shown.
Scenario 2: POE (Power over Ethernet) or switches totaling over 120 watts of total heat, use two fan kits mount second fan where blank is shown.
Optional: Remove Top Panel Blank for additional venting. A Fan Kit can be installed on top vent, but will occupy the top RU space.
M5 Thread forming screws
Top Panel Blank
Fan Kit Blank
Note: When using switches with side air intake and opposite side exhaust use one fan without fan blank
Fan Kit
#10-32 Screws and Lockwashers (8 Places)
Mounting Rail Installation (PZWMC12RR)
To install mounting rail use (2) M6 thread forming screws & lockwashers at desired location as shown below
For Technical Support: www.panduit.com/resources/install_maintain.asp
Mounting Rail
Mounting Hardware
Page 5 of 7
Page 6
INSTRUCTIONS CM315B
PANZONE Horizontal Slack Manager
Install tray using (4) #12-24 x 1/2 screws provided at desired RU as shown in figure 3. Refer to recommended layout section for optimal mounting location(s).
Screw Mounting Locations
Bend Radius Post Installation
Bend radius posts can be installed at any rack location using (1)#12-24 x 2.5" [(1) #12-24 x 1.5” for PZBR3]screw provided as shown in Figure 1. Post can be customized by removing tabs as show in Figure 2. Note: Post may be installed over active equipment mounting locations
Figure 3
Figure 1
Figure 2
Bend Radius Post
Score Line
#12-24 x 2.5" Screw
Recommended Layout
24 Port Patch Panel
24 Port Patch Panel
PZCHSM2
24 Port Patch Panel
For Technical Support: www.panduit.com/resources/install_maintain.asp
24 Port Patch Panel
PZCHSM2
Active Equipment
Page 6 of 7
Page 7
INSTRUCTIONS CM315B
c
L
c
L
Recommended Cable Routing Guide
Place patch cord slack around furthest spool as feasible to provide best possible cable management
Never cross over center line of horizontal slack manager with cable slack
Top View of PZCHSM2
Typical patch cord length is 4 feet Route patch cords as shown to avoid crossover
Recommended Mounting Locations for Bend Radius Posts
Typical patch cord length is 5 feet Route patch cords as shown to avoid crossover
Routed to top Horizontal Slack Manager
For instuctions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
Lower Horizontal Manager
www.panduit.com
Page 7 of 7
Recommended Mounting Locations for Bend Radius Posts
Route patch cords going to top horizontal slack towards the outside of the cabinet to avoid cross overs with patch cords going to lower slack manager.
E-mail:
cs@panduit.com
Fax:
(708)444-6448
Loading...