Panduit IABDIN4 Installation Manual

Page 1
Industrial Automation Din Rail Panel
Part Number(s): IABDIN4
© Panduit Corp. 2011
INSTALLATION INSTRUCTIONS
IABDIN4
Part Contents:
(1) 19" 4RU Rack Panel w/Attached Din Rail
(2) Cable Pass Through Grommets
(4) #12-24 Screws
(4) M6 Screws
Grommet Installation
Install Cable Pass Through Grommets by sliding them into the openings left by removing the knockouts.
CM516B
Knockout removal for Grommet Installation
Use a flathead screwdriver or a pair of pliers (not included) to remove knockout locations intended for Cable Pass Through Grom­mets. Place head of screwdriver into slot located in the knockout and turn screwdriver to remove.
Pliers
Knockout
Knockout
locations
locations
Rack Installation
Install 19" 4RU Rack Panel horizontally to any location on a 19" Wide Equipment Rack using (4) #12-24 Screws or (4) M6 Screws.
Cable Pass Through Grommet
Power Supply Installation
Note: The Industrial Automation Din Rail Panel is designed for use
with the Allen-Bradley Stratix 8000 and Cisco 3000 switch and power supply, but can be used with any din rail mountable equip­ment. The Din Rail may be mounted on either the front or the back of the panel and holes are provided near the top and bottom edges of the panel for mounting various equipment.
The Allen-Bradley Stratix 8000 has a notch on the back which will snap onto the din rail (shown below).
Stratix 8000
Switch
Din Rail
Rack
Screws
Grounding
Grounding of the Industrial Automation Din Rail Panel is provided with a threaded grounding stud located on the back of the bracket. A jumper wire (not included) grounds the bracket to the equipment rack.
Grounding Stud
For Instructions in Local Languages
and Technical Support:
www.panduit.com
Page 1 of 1
E-mail:
cs@panduit.com
Fax:
(708) 444-6448
Loading...