
8-Port IndustrialNet DIN Rail Mount
DIN Rail
2
Orient base
as shown
Fiber Enclosure
Part Number: FDME8**
© Panduit Corp. 2012
INSTALLATION INSTRUCTIONS
FS028
** Denotes color.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 1 of 4

© Panduit Corp. 2012
Dome Nut
Cord Grip
Nut
Grommet
(OR)
1/4"-1/2"
1/2"-3/4"
Cover
4
Loosely attach
dome nut. Do
not tighten.
cable
cable
Hand tighten nut to
secure cord grip.
5
Faceplate
Single port
Mini-Com modules
(sold separately)
Orient modules
as shown.
7
Hand tighten
dome nut to
secure cable.
Strip the outer cable
jacket to 22" +/- 1/2" to
allow for connector
termination and slack.
Align cable jacket cut
end with edge of cord
grip +/- 1/2".
If present, move
aramid yarn to
the side during
termination.
8
Minimum loop
bend radius 2.5"
Cut buffered fibers
or jacketed fibers to
14" +/- 1/2".
Note: Views shown using LC Opticam connectors. Reference connector
instruction sheets for termination instructions.
LC Opticam
Connectors
(sold separately)
INSTALLATION INSTRUCTIONS
FS028
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 2 of 4

© Panduit Corp. 2012
9
Minimum loop
bend radius 2.5"
Cut buffered fibers
or jacketed fibers to
20" +/- 1/2".
10
Secure loops loosely
with a piece of Tak-ty
(sold separately).
11
Trim aramid
yarn to 3".
12
Wrap aramid yarn at least one
full loop clockwise around the
screw and secure.
Note: For some cable types,
not all aramid yarn will fit
around the screw.
14
#6-32 x 3/8"
screws
Torque screws to
5 - 8 lb-in.
INSTALLATION INSTRUCTIONS
FS028
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 4

© Panduit Corp. 2012
2
Use mounting screws to
secure the base to the surface.
#10-32 screws recommended.
6-3/8"
INSTALLATION INSTRUCTIONS
Optional Surface Mounting
FS028
For Instructions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
Page 4 of 4
E-mail:
techsupport@panduit.com
Phone:
866-405-6654