Panduit CUFB48BL Installation Manual

Page 1
48 Port Consolidation Point Box
Part Numbers: CUFB48BL, CUFF-KIT
PN232B
© Panduit Corp. 2001 Printed in U.S.A.
INSTALLATION INSTRUCTIONS
PARTS
(1) Metal Box (1) Cover
AK-TY
(4) T (6) Adapter Plates (removable) (4) Pass Thru Plates (with screws) (2) Rubber Grommets for Pass
Thru Plates (1) 48 Port Identification Label (2) Plungers (2) Grommets for Plungers
CUFB48BL
The 48 Port Consolidation Point Box is designed for use with raised floor products including SMED “Nexus” underfloor systems. This zone product can also be wall mounted.
2.0 Box Assembly
2.1 Set box on flat work surface. Snap the (6) Adapter Plates in place, then snap properl y ter mina ted MINI-COM®
modules in place. M
2.2 Position cables into either side of t he box and secure them with the T
floor of the box. If cables enter one end of the box, then instal l (1) Pass Thru Plat e to seal off the opposite end of the box. To assemble the Pass Thru Plate, slide the (2) Grommets into the slots of the Pass Thru Plate, then fasten the plate to box the with screws provided.
INI-COM modules mount side by side vertically in the Adapter Plates.
AK-TYS provid ed to the raised tabs in the
Adapter Plate
Grommets
locator holes
Adapter Plate (removable) (can be rotated 180°)
2.1
Box
2.2
Pass Thru
Plate
Enclosure
3.0 Cover Assembly
3.1 Install the Grommet into the locating hole in the cover tab, then push the Plunger into the Grommet until it snaps into place.The face of the Grommet remains between the outside face of the tab and the plunger head.
3.2 To install the cover, slide the cover into channel and push back until the tabs engage, then push in both Plungers to secure the cover. To remove the cover, pull out on both Plungers, then slide and lift cover out.
3.3 Apply the Port Identification Label on the bott om s ide of the cover.
TAK-TY
Copper cable
Plunger
Cover tab
Grommet
3.0
FOR TECHNICAL SUPPORT CALL: 866-405-6654
Page 1 of 2
Page 2
PN232B
INSTALLATION INSTRUCTIONS
4.0 FIBER CONVERSION KIT (Sold Separately)
PARTS:
CUFF-KIT
Notes: 1. Kit works with both CUFB48BL and CUFMB24BL.
2. Depending on the product being assembled for use with fiber, some kit components may be left over.
(2) Spools with Adhesive Backing (4) Wire Saddles (2) Strain Relief Clips (1) Fiber Caution Label (1) Grounding Lug (1) Spiral Wrap 24 long (1) Fiber Laser Beam Warning Label (4) Panduit Cable Ties
5.0 Installa tion of Fibe r Cable
5.1 Install (2) Pass Thru Plates into the box.
5.2 Bring (1) meter of buffered fiber int o the box. Strip back the cable jacket. Secure the cable to the str ain relief with the cable tie provided. The cable can enter from eit her side of the box.
5.3 Attach the fiber to the connector. Use the spools to maintain proper bend radius for fiber slack.
5.4 Attach the kevlar to the Grounding Lug (either location) for strain relief.
5.5 Use T
AK-TYS™ to secure the fiber to the raised tabs in the floor of the box.
Cable
Note: Copper and fiber terminated products can be installed together in this box.
T
Grounding Lug
Fiber Spool
AK -TY
Kevlar
Cable Tie
Strain Relief Bracket
Cable
Pass Thru Plate
10500 West 167th Street Orland Park, Illinois 60467
Adapter Plates (removable)
WORLDWIDE SUBSIDIARIES AND SALES OFFICES
NETWORK CONNECTIVITY GROUP
Technical Support: 866-405-6654
Fax: 708-444-6993
Page 2 of 2
E-mail: netconnsupport@panduit.com
Grounding Lug
(Optional location)
Web site: www.panduit.com/ncg
Loading...